2027
-
Amazon Web Services Butts County data center campus GA
PILOT payments to county, schools and development authority scheduled to begin Jackson Progress-Argus
Nov 2026
-
Amazon Web Services data center campus, Madison and St. Clair townships OH
Trenton voters pass Issue 17, barring data centers over 25 MW in city limits, with about 80% (unofficial results, not yet certified); WVXU says it blocks plans for Trenton to annex land for a 1,000 MW Amazon data center WVXU -
Project Mila OH
Trenton voters pass Issue 17, a charter amendment barring data centers over 25 MW, with about 80% of the vote (unofficial Butler County Board of Elections results, not yet certified). WVXU says it puts the 250 MW Prologis facility into question; Prologis told WCPO the result does not affect its project, and whether the project has vested rights is unsettled. Work so far is site work WVXU -
Stargate Abilene TX
Epoch AI estimates all 8 buildings (7-8 estimated) operational, for 824 MW of IT power (Epoch AI estimate) Epoch AI -
Amazon Web Services Richmond County data center campus NC
Amazon expected to begin hiring for data center jobs Richmond County Economic Development
Oct 2026
-
Project Cannoli MI
Michigan Attorney General petitions the Commission for rehearing of the contract approval, arguing the 20-year cost accounting could leave other customers subsidizing the data center in some years Michigan Public -
Project Thunderbird OK
At a special meeting the City Commission approves all three rezoning requests and the plan amendment, 6-1; emergency clauses did not pass. Two areas move from agricultural to heavy industrial and a third partly to industrial, covering two of the four potential campuses City of Enid -
Project Camellia GA
Effingham County commissioners vote unanimously to contract Charles Abbott Associates for Phase 1 plan review, inspection and permitting services; the chairman recuses because he works for Georgia Power Savannah Business Journal -
PNK Group Wisconsin Rapids Data Center WI
Common Council rejects the conditional use permit after the planning committee recommended denial for missing information WLUK Fox 11 (WSAW report) -
Kenwood Commons NY
Residents and invited experts hold a public forum on the proposal's effect on electric bills and the grid; no government vote is scheduled in the coverage WRGB CBS6 Albany -
Project Thunderbird OK
Enid's Metropolitan Area Planning Commission recommends approval of the related comprehensive plan amendment by a 6-3 vote City of Enid -
Amazon Web Services data center campus, Madison and St. Clair townships OH
AWS holds a community meeting at Edgewood Middle School in Trenton; residents ask about water, workforce, power and backup generators FOX19 -
Project Red Clay AL
Local TV reports residents' opposition after the approval; the commission chairman calls the deal a win for the county WAKA 8 -
Microsoft Fairwater WI
Village Plan Commission unanimously backs Microsoft's amended site plan, which drops two of nine planned data center buildings while raising total floor area above 5.8 million sq ft; Village Board vote expected later in October Wisconsin Public Radio -
Project Cannoli MI
Van Buren Township Planning Commission votes 5-1 to approve the final site plan; the report says Google is the final owner and operator and Panattoni is managing construction Michigan Public -
Project Red Clay AL
Southern Environmental Law Center criticizes the vote for lacking public notice and comment and raises water, power and wastewater questions Southern Environmental Law Center -
Comanche Circle TX
Commissioners vote 3-1 against a settlement offered by Sailfish Investors that would have shrunk the Hood County footprint from about 2,523 to about 1,375 acres, then unanimously deny the developer's appeal of the county's on-site permit decision Texas Public Radio -
Meta Maysville campus KY
Mason County Fiscal Court unanimously approves an industrial revenue bond, a development agreement and road improvements, and the county judge-executive names Meta as the company behind the project WKYT -
Tooele Valley data center (Burmester Road / I-80) UT
Tooele County Planning Commission votes unanimously to table the draft data center ordinance (Chapter 34); next meeting set for Oct. 28 KSL.com -
Project Thunderbird OK
The City Commission's Oct. 6 hearing on the three rezoning requests is moved to a special meeting at a larger venue, so more of the public can attend City of Enid -
Valara Holdings High Performance Compute Center SC
Judge J. Derham Cole Jr. dismisses neighbors' challenge to the county's permitting of the project, finding no specific harm shown and no prior appeal to the Board of Zoning Appeals WRDW -
Project Cannoli MI
Michigan Public Service Commission unanimously gives conditional approval to DTE Electric's 20-year special contracts to serve the Google campus, with protections including a minimum monthly billing demand and a termination payment Michigan Public -
DC BLOX Nashville Data Center TN
Federal judge dismisses DC BLOX's suit against Metro; three claims were dismissed without prejudice, with 21 days to file an amended complaint, and the request for a preliminary injunction was denied FOX 17 Nashville -
Project Red Clay AL
Lowndes County Commission votes 3-2 to approve tax abatements for the project in a short meeting; the item was not on the posted agenda GovTech (reprinting al.com)
Sep 2026
-
Stillwater Technology Park GA
Lovejoy council passes an ordinance banning data center construction in the city Atlanta News First -
Switch Core 2.0 Phase 1 Campus NV
A city spokeswoman said the proposal had not yet been scheduled before the Planning Commission or City Council. 102.7 Coyote Country (Beasley Media) -
Project Jupiter NM
Oracle sends developer Blue Owl Capital a force-majeure notice after a natural-gas pipeline meant to supply the project's power is delayed to February 2027 following New Mexico State Land Office permit denials; both companies say it does not change their commitment to the project SiliconANGLE -
Project Boulder SC
Colleton County Economic Alliance holds an information session on a 1,000 MW campus; developers say construction could start around 2028 or 2029 pending an energy study with Santee Cooper Live 5 News (WCSC) -
Switch Core 2.0 Phase 1 Campus NV
KTNV reported Switch's letter of intent for a 175.8-acre campus, based on documents filed with the city in August. KTNV Channel 13 Las Vegas -
Fermi America Project Matador TX
Fermi and TensorWave amend their 222 MW lease to move the closing date from Sept. 30 to Oct. 31, 2026, while a lease guaranty is negotiated Fermi America (ACCESS Newswire) -
Project Marvel AL
Mayor Kenneth Gulley, who backed Project Marvel, loses the mayoral runoff to former council member Louise Alexander, 54.53% to 45.47%, after an election season the Birmingham Free Press describes as dominated by the project Birmingham Free Press -
Project Rainier (AWS New Carlisle campus) IN
St. Joseph County Council advances, on a 6-3 vote, a resolution that would bar new hyperscale data centers from the county ABC57 -
CoreWeave Lancaster data center PA
Judge grants the developers' emergency motion to stay the zoning hearing on the residents' group appeal of the second Greenfield Road building LancasterOnline -
Google Hermantown Data Center MN
At a Hermantown City Council meeting, Google says its changes include monitoring wells and a 37 percent reduction in wetland impacts, and that it is creating a decommissioning agreement in case the site becomes obsolete Northern News Now -
Google Hermantown Data Center MN
Google tells the City Council that a labor memorandum of understanding for the project has been reached between Mortenson, its developer, and the Duluth Building Trades FOX 21 (KQDS) -
Oakline at Mill Creek OR
Salem City Council adopts a 120-day moratorium on new data center projects, with the option to extend it by six months Salem Reporter -
Project Camellia GA
One Hundred Miles and five residents sue the Effingham IDA and Octans GA alleging open-government law violations WTOC -
Stratos Project UT
O’Leary and Fox News ask the U.S. District Court in Utah to dismiss the defamation suit Utah News Dispatch -
AWS Project Green MO
Cole County Circuit Judge Cotton Walker denies most of the motion to dismiss and finds the group has standing KBIA / Columbia Missourian -
AWS Wilmington data center OH
Supreme Court of Ohio rules the initiative cannot appear on the Nov. 3 ballot Court News Ohio -
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
Public Utilities Commission of Nevada approves the two gas plants, subject to environmental permits and Storey County approvals Nevada Current -
Blueprint Taylor Data Center TX
Texas Attorney General Ken Paxton launches an investigation into the land deal Office of the Attorney General of Texas -
Google West Memphis Data Center AR
Legislators on the joint energy committee question Entergy Arkansas about the data center's effect on ratepayers and table remaining questions to next month's meeting Action News 5 -
Crossroads Technology Campus VA
Planning Commission votes 4-2 to recommend approval of the special use permit Fredericksburg Free Press -
Farmington Technology Park MN
City reports plaintiffs in both lawsuits involving the city have filed dismissals, pending final court direction City of Farmington -
Google West Memphis Data Center AR
Entergy Arkansas files a notice of dismissal of its lawsuit against the two newspapers and a central Arkansas resident Arkansas Advocate -
North Country Colocation Services Massena Expansion NY
Massena Town Board votes 3-2 against a proposed six-month moratorium on data center development WWNY 7 News -
Project Camellia GA
Coastal Regional Commission's full DRI report released; county site plan consideration postponed at developer request WTOC -
Sabey Decatur Technology Park IN
Metropolitan Development Commission approves more than $240 million in tax breaks WFYI -
Gateway Digital Campus MO
The Franklin County Commission votes to approve the Diamond 66 and Diamond Farms rezoning requests (Commission Orders 2026-255 and 2026-256), rezoning the site from its prior districts to industrial (A district) use, and separately adopts new countywide data-center regulations First Alert 4 (KMOV) -
Imperial Data Center CA
The Imperial Irrigation District board approves a Large Load Tariff, new pricing rules making data centers the first to have their power cut during surges in demand KPBS -
Meramec Valley Technology Park MO
The Franklin County Commission votes to approve BLE Landholdings' rezoning request (Commission Order 2026-257), reversing the Planning and Zoning Commission's April recommendation against it, and separately adopts new countywide data-center regulations First Alert 4 (KMOV) -
Project Thunderbird OK
A large crowd, most of it opposed to Project Thunderbird, fills the Enid City Commission meeting Enid News & Eagle -
QTS Augusta Data Center Campus GA
The Augusta Commission approves rules governing new data centers, 6-5, ending the city’s almost three-month moratorium The Augusta Press -
Spring Valley Technology Park VA
Board of Supervisors votes 7-1-1 to have staff draft a resolution pausing new data center applications for 12 months; final vote expected in October WJLA -
Compass Statesville NC
Statesville City Council unanimously approves a 180-day moratorium on new data centers in the city; WBTV reports it will not affect previously approved data centers WBTV -
Natelli data center, U.S. 158 NC
Vance County Board of Commissioners votes 5-2 to adopt a 60-day moratorium on data center development after two public hearings WIZS -
Port Washington (Lighthouse) Data Center Campus WI
ATC refiles its application for the grid upgrades serving the campus, dropping a Trenton-Saukville line segment and restarting the PSC's six-month review Wisconsin Watch -
Project Boulder SC
County Council unanimously adopts Digital Infrastructure Overlay District, partially repealing the moratorium Live 5 News (WCSC) -
Quantum Frederick MD
County Executive rejects the Frederick Digital Campus DRRA and extends the data center pause through July 1, 2027 Frederick County Government -
Switch Core 2.0 Phase 1 Campus NV
County records showed Switch had bought about 176 more acres at Apex for roughly $196 million, with no announced plans for that land. FOX5 Las Vegas (KVVU) -
CyrusOne Sangamon County Data Center IL
County defends its approval in circuit court; Judge Adam Giganti sets an Oct. 9 hearing on the county's motion to dismiss the residents' suit Illinois Times -
Switch Big Beaver data center campus PA
The borough received preliminary design plans and posted a link to them. Big Beaver Borough -
Google Fort Wayne data center IN
IDEM approves a permit to fill 2.13 acres of forested, isolated wetlands for three new buildings in the third expansion phase 21Alive (WPTA) -
Project Phoenix PA
Aligned announces groundbreaking of the 2 GW Project Phoenix campus GlobeNewswire (Aligned Data Centers) -
Stargate Abilene TX
On Oracle's Q1 FY2027 earnings call, its CEO said 6 of the 8 Abilene buildings, 618 MW or 75% of total capacity, had been delivered to the customer, and that Oracle delivered about 131,000 GPUs there in the quarter The Motley Fool -
Farmington Technology Park MN
Coalition announces it is withdrawing its lawsuit, citing litigation costs Blandin on Broadband (citing Sun This Week) -
Global AI Data Center CO
Board of County Commissioners votes 5-0 to approve Use by Special Review permit after eight-hour hearing Colorado Public Radio -
Imperial Data Center CA
Superior Court sets aside lot merger approval and orders CEQA environmental review KPBS -
Natelli data center, U.S. 158 NC
Tom Natelli of Natelli Holdings writes to county commissioners and the planning board that the company has decided to file a plan for development of its site along U.S. 158 WIZS -
QTS Augusta Data Center Campus GA
Augusta releases a final draft data center ordinance that would not apply to the QTS campus WRDW/WAGT News 12 -
Comanche Circle TX
Hood County Commissioners Court postpones its discussion of the proposed data center projects, including Comanche Circle, to October 13 so a public hearing can be properly advertised NBC DFW -
Google Hermantown Data Center MN
City Council unanimously approves up to $20,000 for a consultant to guide discussions with tribal governments on the proposal Northern News Now -
IREN Sweetwater data center campus TX
IREN says the 2 GW Sweetwater Hub was conditionally included in ERCOT's Batch Zero process as base load, with 300 MW under construction at Sweetwater 1 for Q4 2027 delivery IREN (GlobeNewswire) -
Joliet Technology Center IL
Will County Judge Victoria Breslan hears arguments on the city's and developer's motions to dismiss the residents' lawsuit and says she will rule in October Shaw Local (The Herald-News) -
Project Bluegrass KY
On the mayor's tie-breaking vote, Burgin City Council approves on first reading an ordinance for the city to rejoin the joint Mercer County, Harrodsburg and Burgin Planning and Zoning Commission WKYT -
Project Bluegrass KY
A planned council vote on directing the city attorney to draft an ordinance annexing the data center site does not happen after council member Melinda Wofford walks out and the council loses its quorum Kentucky Lantern -
Project Bluegrass KY
Mercer County Fiscal Court gives a first reading of the commission's data center regulations Kentucky Lantern -
Project Delta NC
Public hearing held under the format set in a court-adopted consent order; SELC says residents largely opposed the project Southern Environmental Law Center -
Quiet Data Centers, Trestle Road NC
Commissioners split 3-3 on a resolution approving an amended economic development agreement, so the amendments are not adopted The Daily Herald (Roanoke Rapids) -
Google Botetourt County Data Center Campus VA
Appalachian Power files application with the State Corporation Commission for grid upgrades to serve the campus Cardinal News -
Switch Big Beaver data center campus PA
Revised land development plans, stormwater calculations and an acoustics study were submitted to the borough. Big Beaver Borough -
Monarch Compute Campus WV
Gov. Morrisey announces state 'high-impact' certification for the project Charleston Gazette-Mail -
Project Jupiter NM
Attorney General Raúl Torrez files responses backing emergency petitions New Mexico Department of Justice -
Project Tamarack WV
Gov. Morrisey announces at the West Virginia Chamber of Commerce business summit that Starwood Digital Ventures received high-impact data center certification for Project Tamarack West Virginia Public Broadcasting -
Project Tamarack WV
Project Tamarack says it is forming a Community Advisory Group of Mason County residents and leaders WDTV -
Project Tamarack WV
Governor announces a $12 billion Starwood Digital Ventures data center in Mason County. WV MetroNews -
Tooele Valley data center (Burmester Road / I-80) UT
Utah News Dispatch reports plans paused while county drafts ordinance Utah News Dispatch -
Wallace Jackson Data Center Campus GA
Plaintiffs' attorney says the parties are awaiting a ruling from the judge on a joint motion the county and developer filed The Griffin Daily News -
Wallace Jackson Data Center Campus GA
County community development director says the county has received no applications, plans or other submittals for a land disturbance permit at its approved data center sites The Griffin Daily News -
Project Camellia GA
Three Effingham County residents sue in Effingham County Superior Court to throw out Ordinance 2026-352, the zoning change that paved the way for the project; the Effingham Herald reports the suit does not ask the court to stop Project Camellia Effingham Herald -
Stargate Abilene TX
Chamber panel addresses resident concerns over housing, power, water and noise KACU -
West Sedgwick County data center land acquisitions KS
Commission extends interim control through 2026-12-24 to finalize zoning rules KWCH -
Perry Township Data Center OH
Residents sue the Perry Township trustees, Panattoni and other local bodies over the noise ordinance and tax-exemption resolution; the suit does not seek to halt development Ideastream Public Media -
Quantum Frederick MD
County receives first draft of the community benefits agreement / DRRA Frederick County Government -
T5 @ Chicago IV IL
Village issues first building permit, for an 800,000-square-foot facility Lake and McHenry County Scanner -
Amazon Web Services data center campus, Madison and St. Clair townships OH
Trenton's city attorney notifies Butler County that the city is withdrawing the annexation petition, effective immediately WVXU -
Amazon Web Services data center campus, Madison and St. Clair townships OH
The withdrawal comes one day before a scheduled Butler County Board of Commissioners public hearing on the annexation WCPO -
Amazon Web Services data center campus, Madison and St. Clair townships OH
Butler County commissioners accept the withdrawal WCPO -
Brightseat Tech Park MD
Council committee unanimously recommends legislation to reinstate detailed site plan review for data centers The Diamondback -
Goodnight Campus TX
At a Google and Crusoe community open house in Claude, Crusoe says the campus will include six buildings; KFDA reports Google is expected to receive the first buildings in early 2027, with construction wrapping up by the end of 2027 KFDA NewsChannel 10 -
Google Fort Wayne data center IN
Google seeks a third air permit modification, for 228 more emergency diesel generators on top of 174 existing WBOI -
Google West Memphis Data Center AR
Released documents show Entergy Arkansas and Google plan to cover two-thirds of the project's cost through a monthly ratepayer increase of nearly $6 over 20 years Action News 5 -
Google West Memphis Data Center AR
A federal judge denies Entergy Arkansas a temporary restraining order that would have barred the Arkansas Times and the Arkansas Democrat-Gazette from revealing details of its agreements with Altitude Capital LLC, the Google subsidiary setting up the data center Arkansas Advocate -
Mt. Orab Mega Site data center OH
Planning commissioner confirms DB STU LLC purchased the mega site properties with the intent of developing a data center WCPO -
Mt. Orab Mega Site data center OH
Planning Commission hears resident opposition to a High Tech Overlay district; no vote taken FOX19 -
Muncy Data Center PA
Two neighboring residents file a land use appeal in Lycoming County Court of Common Pleas against the deemed approval of the conditional use application Williamsport Sun-Gazette -
Pennsylvania Digital 1 (PAX-1) PA
Township supervisors approve Phase 1-B final land development, allowing the first six buildings WITF -
Pennsylvania Digital 1 (PAX-1) PA
Cumberland County Judge Matthew P. Smith denies residents' request to halt work on PAX-1 while their appeal is considered CBS 21 News (WHP) -
Prometheus Hyperscale Evanston Campus WY
Uinta County commissioners approve a conditional use permit for the project's independent power production facility Wyoming News (via NewsBreak) -
Quiet Data Centers, Trestle Road NC
Halifax County commissioners approve the amended economic development agreement 5-1, the Daily Herald reports The Daily Herald (Roanoke Rapids) -
Valara Holdings High Performance Compute Center SC
State grants permission to add more natural gas turbines FOX Carolina
Aug 2026
-
Ranalli Lysander Data Center NY
Town Supervisor Kevin Rode says no applications are before the town and no state DEC permit has been requested for the parcel CNYCentral -
Amazon Web Services Richmond County data center campus NC
NC DEQ announces final air quality permits for Amazon's 588 emergency engines and Duke Energy's 57 bridge power engines NC Department of Environmental Quality -
Imperial Data Center CA
County says Superior Court found moratorium findings insufficient and ordered it withdrawn County of Imperial -
AWS Project Green MO
Cole County judge hears arguments on motion to dismiss the Preserve Montgomery County lawsuit KBIA -
Project Tango FL
Palm Beach County commissioners vote 7-0 on first reading for a one-year moratorium on large-scale data centers (an anticipated monthly peak load of 50 megawatts or more), with a final vote set for Sept. 24 NewsRadio WIOD -
Switch Big Beaver data center campus PA
The borough planning committee's agenda included Switch's notice of intent to seek subdivision and land development approval. Big Beaver Borough -
Switch Big Beaver data center campus PA
The borough meeting on Switch's plans moved outdoors because of the large turnout, and residents raised concerns about the project. Beaver County Radio -
Treetop East Fishkill Data Center NY
Activists cite the East Fishkill fight in calling on the governor to sign the Responsible Data Center Development Act Food & Water Watch -
Valara Holdings High Performance Compute Center SC
SC Public Service Commission rules the utility siting law does not apply to the facility SC Daily Gazette -
Amazon Data Services King George campus (former Birchwood power plant site) VA
Amazon withdraws its application to renew a DEQ groundwater permit for the campus and says it will seek other water sources Virginia Mercury -
Ridgeline Facility WV
Intermediate Court of Appeals dismisses environmental groups' appeals for lack of jurisdiction, finding good cause for late appeals to the WV Supreme Court WDTV -
Sentinel / Green Fig Data Center PA
Township issues second stop-work order pending Aqua confirmation of water availability MyChesCo -
CRG Festus Data Center MO
Council annexes three more parcels (6.55 acres) in CRG's plan, 5-2, days before a new state annexation law took effect Jefferson County Leader -
Switch Big Beaver data center campus PA
At a county commissioners' work session, the county solicitor reported that the county planning commission had reviewed the application and was forwarding its recommendations to the borough. Beaver County Radio -
Project Lincoln KY
Fiscal Court votes 5-4 to deny revised data center regulations and hire a consultant; Judge-Executive calls Aug. 24 special meeting for a new first reading The Oldham Era -
Amazon Web Services Madison County Mega Site campus MS
Madison County Board of Supervisors upholds the tax assessor's valuation of five Canton data center buildings, rejecting Amazon's appeal Mississippi Free Press -
Joliet Technology Center IL
City and developers' motions to dismiss set for a Sept. 8 hearing before Will County Judge Victoria Breslan Shaw Local (The Herald-News) -
Port Washington (Lighthouse) Data Center Campus WI
Oracle moves to voluntarily drop its Ozaukee County Circuit Court lawsuit challenging the Wisconsin PSC's credit rating requirements for data center developers Wisconsin Watch -
PORTS-Pike Technology Campus OH
OpenAI announces it has joined the project under a 20-year lease, with NVIDIA investing $1.5 billion OpenAI -
Project Cornmaze WI
Town of Beloit board votes 4-0 on a resolution calling for a 12-month data center moratorium; a public hearing and an ordinance are still required Beloit Daily News -
Prometheus Hyperscale Evanston Campus WY
Judge James Kaste dismisses the petition, ruling the petitioners did not respond to a motion to dismiss in time and did not show how they would be personally harmed Cowboy State Daily -
Quiet Data Centers, Trestle Road NC
With the company permitting disclosure, the county releases project details ahead of an Aug. 25 special meeting for the public to hear about the project Halifax County Board of Commissioners, via RRSpin -
Project Delta NC
County planning board votes 5-2 to recommend that commissioners reject the new Project Delta rezoning request, its second denial recommendation WFAE -
Project Tembo WY
County Planning Commission holds a hearing on the office complex conditional use permit Laramie County -
Ridgeline Facility WV
WVDEP determines Fundamental Data has demonstrated site control after company missed Aug 7 deadline and filed documents Aug 11 West Virginia Watch -
Meta Hyperion LA
LPSC votes 3-1 to reject an administrative law judge's recommendation to make Meta job and power-demand information available through subpoenas WWNO -
Nebius Vineland Data Center NJ
City issues two stop-construction orders over LNG tank and Bloom Energy fuel cell work done without permits WHYY -
Powers Ferry Place Data Center GA
Marietta City Council approves the zoning for the data center Atlanta News First -
Rowan Digital Infrastructure Temple Campus TX
Rowan seeks approval of Lasso, a sixth and final Temple data center; Planning and Zoning review set for Aug 17 and council in September KWTX -
Switch Big Beaver data center campus PA
The borough began posting the application and supporting studies online for public review. Big Beaver Borough -
Cloverleaf, Village of Wrightstown WI
Village voters answer No to an advisory, non-binding referendum question on whether the village should authorize or participate in public improvements connected to large data center projects Spectrum News 1 (Wisconsin) -
Comanche Circle TX
Sailfish commits project to Governor Abbott's audit process and SB 6 interconnection requirements Sailfish Investors (via National Law Review) -
DC BLOX Nashville Data Center TN
DC BLOX sues Metro in U.S. District Court for the Middle District of Tennessee over the moratorium Axios Nashville -
Google Palo data center campus IA
Linn County drops proposal to allow large data centers co-located with nuclear plants in the EU-2 zoning district KCRG -
PNK Group Wisconsin Rapids Data Center WI
Plan Commission holds a major public hearing on the PNK proposal and votes 6-0 to begin drafting a 12-month data center moratorium that would not apply to this project WAOW -
Project Rainier (AWS New Carlisle campus) IN
Council Republicans propose asking Amazon for $7 million; Amazon says it is not interested in revisiting the abatement WVPE -
Saline Township Stargate Data Center MI
Nessel and environmental groups file initial briefs in consolidated appeal Michigan Advance -
Crossroads Technology Campus VA
Utility information form filed estimating 894 MW electric load Spotsylvania County -
Meramec Valley Technology Park MO
BLE Landholdings withdraws its rezoning application at the City of Pacific level, days after Pacific's mayor signs a one-year moratorium on new data-center applications; officials note the site sits in unincorporated Franklin County, where a separate county rezoning case remains open Yahoo News (KSDK) -
Port Washington (Lighthouse) Data Center Campus WI
PSC requires ATC to restart its application for the $1.3B+ transmission line and five substations serving the campus Wisconsin Watch -
Kenwood Commons NY
Developers hold a community meeting and say no formal applications or proposals have been submitted yet WAMC -
Stillwater Technology Park GA
Developer withdraws the proposal at a special city council session Atlanta News First -
Pennsylvania Digital 1 (PAX-1) PA
Supervisors' vote postponed after overflow turnout created a fire hazard WHP 580 -
Project Tango FL
Landowner PBA Holdings appeals the County Commission's July 15 denial under Florida's Land Use and Environmental Dispute Resolution Act, which leads to a hearing before a special magistrate Stet News -
Augusta Township Data Center (Thor Equities) MI
Voters overturn the rezoning in a referendum, per unofficial results The Sun Times News -
Calvert Technology Center MD
Calvert County government issues a news release saying Amazon Web Services is abandoning its plans for data centers on the Calvert Cliffs Nuclear Power Plant campus Maryland Matters -
DC BLOX Nashville Data Center TN
Metro Council authorizes eminent domain acquisition of the site, 27-5 NewsChannel 5 -
Google Hermantown Data Center MN
City of Hermantown submits the updated AUAR to the Environmental Quality Board City of Hermantown -
Lake Hawkeye NY
Statewide reporting describes the project as facing legal challenges, with the town planning board requesting additional work Spectrum News / NY State of Politics -
Project Camellia GA
Effingham County commissioners approve Ordinance 2026-352 permitting data centers in industrial zones Effingham Herald -
Oakline at Mill Creek OR
Salem City Council unanimously votes to advance a data center development moratorium, with a Verrus application pending KATU -
Project Cannoli MI
Michigan Attorney General files brief opposing DTE's proposed 80% minimum billing demand Planet Detroit -
Sentinel / Green Fig Data Center PA
Developers withdraw offer to downsize to 536,000 sq ft and switch to air chillers The Philadelphia Inquirer -
Amazon Web Services Louisa County campuses VA
Virginia DEQ discharge (VPDES) permit for cooling water discharge into Sedges Creek takes effect Tammy Purcell (Substack) -
PNK Group Wisconsin Rapids Data Center WI
City holds a public informational meeting at the library while PNK Group is still preparing a formal development plan; opponents protest outside WSAW -
Amazon Web Services data center campus, Madison and St. Clair townships OH
Madison Township trustees vote unanimously to reject Trenton's annexation petition WYSO (WVXU story) -
Amazon Web Services data center campus, Madison and St. Clair townships OH
St. Clair Township also rejects the annexation WYSO (WVXU story) -
Amazon Web Services Richmond County data center campus NC
State regulators reviewing draft air permits for backup diesel generators after public hearings Inside Climate News -
AWS Wilmington data center OH
Clinton County Board of Elections votes unanimously not to certify a citizen data center regulation initiative WKRC Local 12 -
CoreWeave Lancaster data center PA
Residents' group appeals planning commission's conditional preliminary approval of a second Greenfield Road data center LancasterOnline -
Falls Township Innovation Campus PA
Governor's executive order removes data centers, including Amazon's, from the state fast-track permitting program The Philadelphia Inquirer -
Google Botetourt County Data Center Campus VA
County issues grading plans and land disturbance permit Botetourt County, VA -
Google Hermantown Data Center MN
Google scales back the proposal from four data center buildings to three Red Lake Nation News (republished from the Minnesota Star Tribune) -
North Country Colocation Services Massena Expansion NY
NCCS representatives tell the Massena Planning Board that planned on-site emergency generators have been cut from 314 to 68 to address noise concerns NNY360 (Watertown Daily Times) -
Project Bluegrass KY
Mercer County Fiscal Court passes a temporary pause on data center construction that does not apply in Burgin Kentucky Lantern -
Project Marvel AL
Two of the five Bessemer City Council members who voted for the Project Marvel rezoning lose their seats in the August municipal elections, according to the Birmingham Free Press Birmingham Free Press -
T5 @ Chicago IV IL
Nine Lake County residents and Preservation of Community Well-being Collective LLC file suit challenging the village's approvals Lake and McHenry County Scanner -
Tooele Valley data center (Burmester Road / I-80) UT
Planning Commission tables the truck stop plat application pending a third-party study and tables the data center ordinance to include public comment in its report Utah Public Radio -
White Oak Technology Park GA
Economic Development Authority of Columbia County approves a memorandum of understanding for a $17 billion data center investment by Kinetic Infrastructure Solutions, an Alphabet subsidiary; county says Google will pay $40 million a year for seven years WRDW
Jul 2026
-
Logan Prairie Data Center IL
Logan County officials cancel the Aug. 6 Zoning Board of Appeals meeting Illinois Times -
Project Cornmaze WI
Town of Beloit supervisors reject the cost reimbursement agreement with Panattoni and begin the process toward a 12-month data center moratorium, two days after the Town of Turtle took similar steps Beloit Daily News -
Project Kilby TX
Chevron's second-quarter earnings release lists the signed agreement for about 2.67 GW of behind-the-meter power in West Texas Chevron / SEC -
Amazon Web Services Richmond County data center campus NC
NC DEQ holds joint public hearing on the Amazon and Duke Energy air quality permits in Rockingham NC Department of Environmental Quality -
Amazon Web Services Warrenton Data Center VA
Citizens for Fauquier County suffers a setback in court in its challenges to the data center Fauquier Times -
Goodnight Campus TX
Filings with the Texas Department of Licensing and Regulation cover Buildings 3 and 4, each with an estimated construction cost of $500 million DatacenterDynamics -
Oakline at Mill Creek OR
Gov. Tina Kotek orders the Oregon Department of Administrative Services to cancel the state's contract with Verrus at the Mill Creek Corporate Center KATU -
xAI Colossus 2 TN
Mississippi DEQ sets retirement schedule for 69 temporary turbines at the Southaven plant (Aug. 18, 2026 to July 14, 2027), allowing 13 to run past the original deadline Mississippi Today -
Paducah Site AI campus KY
DOE announces Brookfield and NextEra as partners for a 1.8 GW AI campus with new generation and storage at the Paducah Site U.S. Department of Energy -
Stratos Project UT
O'Leary says design is 'full steam ahead' and a water permit filing is expected by end of August; MIDA on 'pause' awaiting permit requests The Salt Lake Tribune -
DC BLOX Nashville Data Center TN
Metro Zoning Administrator issues a written determination that DC BLOX's building-permit applications had vested U.S. District Court for the Middle District of Tennessee (via WKRN) -
Google Chesterfield County data center campuses VA
Project Skye's Virginia Water Protection permit application is on hold VPM News -
Meta El Paso Data Center TX
Meta announces venture with BlackRock (80% BlackRock funds / 20% Meta), ~$14B total cost Meta Investor Relations -
Project Jupiter NM
Oracle says Bloom fuel cells will power campus; ~700 New Mexicans working onsite Oracle -
Stillwater Technology Park GA
AJC reports the 1.2 GW Stillwater filing and the mayor's traffic concerns for nearby schools Atlanta Journal-Constitution -
Polaris Forge 1 ND
Applied Digital says proceeds of a senior secured notes offering will fund construction of a fourth building (150 MW) at Polaris Forge 1 Applied Digital -
Goodnight Campus TX
PUCT approves net metering application in Docket No. 59220 for the co-located Armstrong County data center load, with ERCOT curtailment obligations White & Case LLP -
DC BLOX Nashville Data Center TN
Nashville Zoo board unanimously rejects DC BLOX's proposed MOU for a smaller facility WSMV -
Project Camellia GA
Nearly 1,000 people attend public open house in Rincon, most opposing The Current -
Spring Valley Technology Park VA
Planning Commission votes 5-0 to recommend denial, following staff recommendation Loudoun Times-Mirror -
White Oak Technology Park GA
Columbia County Economic Development Authority announces Google as sole end user and operator of the data center project DatacenterDynamics -
Galaxy Helios TX
Galaxy subsidiary Galaxy Helios Data Centers II offers $3.507 billion of senior secured notes to fund two buildings with eight data halls TheEnergyMag -
Google Botetourt County Data Center Campus VA
Google announces air-cooled technology for the first data center building Botetourt County, VA -
Tooele Valley data center (Burmester Road / I-80) UT
Tooele County Planning Commission hearing on new data center ordinance (Land Use Ordinance Chapter 34) Tooele County / Utah Public Notice Website -
DC BLOX Nashville Data Center TN
Metro Council approves data center regulations and a moratorium on new permits through Dec. 1, 2026 NewsChannel 5 -
Project Camellia GA
Effingham County Industrial Development Authority signs a memorandum of understanding with OpenAI affiliate Octans GA, LLC WTOC -
CRG Festus Data Center MO
St. Louis County Circuit Judge Ellen W. Dunne denies plaintiffs' motion for default judgment in the residents' lawsuit Leader (Jefferson County, MO) -
WF Industrial Yaphank Data Center NY
Brookhaven Town Board votes unanimously for an 18-month moratorium on data centers, running to early 2028 while the town writes zoning rules defining data center use News 12 Long Island -
Microsoft Fairwater WI
Microsoft signs 15-year electric service contract with We Energies Wisconsin Watch -
Prometheus Hyperscale Evanston Campus WY
Three residents petition for review of Uinta County’s permits for the data center, alleging that county commissioners and developers held meetings without advertising them and did not disclose potential family conflicts of interest Cowboy State Daily -
WF Industrial Yaphank Data Center NY
Brookhaven Town Board public hearing on the moratorium runs nearly six hours, with about 300 attending and some 60 speaking against data centers Fire Island News -
Google Morgan County Data Center IN
Morgan County Redevelopment Commission votes unanimously for a tax increment financing district that includes the Project Louie site Indiana Public Media -
Muncy Data Center PA
The developer publishes a notice claiming deemed approval of its conditional use application in the Williamsport Sun-Gazette, according to the township solicitor Williamsport Sun-Gazette -
Stratos Project UT
Joshua Kanter of Alliance for a Better Utah and Gabrielle Finlayson of Elevate Strategies, who opposed the project, sue Kevin O’Leary and Fox News for defamation in federal court in Salt Lake City Utah News Dispatch -
CyrusOne CHI-11 Data Center Campus IL
City Council approves an update to the plan for the CyrusOne campus off Eldamain and Faxon roads WSPY News -
Eco-Yotta Oneonta Data Center NY
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more Office of the Governor of New York -
Lake Hawkeye NY
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more Office of the Governor of New York -
Monarch Compute Campus WV
WVDEP issues a unilateral enforcement order to Monarch Cloud Campus after stormwater and mud from the site entered a nearby neighborhood WV MetroNews -
North Country Colocation Services Massena Expansion NY
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more Office of the Governor of New York -
Project Cardinal Data Center Campus IL
City Council approves an amendment to the project's PUD Shaw Local -
Project Marvel AL
NDA released showing officials had to destroy confidential records when it expires or when the developer asks WBHM / Inside Climate News -
Ranalli Lysander Data Center NY
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more Office of the Governor of New York -
Remington Site Data Center NY
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more Office of the Governor of New York -
Stream Data Centers STAMP Campus NY
Gov. Kathy Hochul signs executive order enacting a statewide moratorium on large-scale data centers, pausing permitting for up to a year The Batavian -
Treetop East Fishkill Data Center NY
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more Office of the Governor of New York -
WF Industrial Yaphank Data Center NY
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more Office of the Governor of New York -
Hyperscale Data Dowagiac Campus MI
Company officials address Dowagiac City Council; the city says recent sound readings exceed its decibel limits WSBT -
Blueprint Taylor Data Center TX
City of Taylor determines a citizen petition to restrict new data centers cannot go on the ballot because, under Texas law, zoning cannot be changed by popular vote CBS Austin -
Meta El Paso Data Center TX
State Office of Administrative Hearings begins testimony on El Paso Electric's proposed McCloud Generation Facility CBS4 / KFOX14 -
Muncy Data Center PA
Muncy Township's zoning ordinance is declared invalid, starting a curative amendment process that must be completed by Jan. 4, 2027, according to the Williamsport Sun-Gazette Williamsport Sun-Gazette -
Project Tembo WY
County memo on the site plan resubmittal and conditional use permit for Project Tembo Laramie County -
Switch Big Beaver data center campus PA
Engineering firm Atwell submitted the preliminary land development plan application to the borough on Switch's behalf. Big Beaver Borough (Atwell, LLC submission) -
CyrusOne Sangamon County Data Center IL
Waverly residents sue Sangamon County in circuit court to overturn the approval Illinois Times -
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
California Public Utilities Commission unanimously authorizes Liberty Utilities to seek bids for a new Lake Tahoe power supplier CapRadio -
Google Morgan County Data Center IN
Google offers to pay for a $12 million expansion of Monrovia's wastewater plant if the town ends its annexation effort; the offer set a July 3 deadline Morgan County Correspondent -
Meta Cheyenne Data Center WY
BOPU announces it will no longer accept industrial wastewater from data center fill-and-flush or closed-loop cooling operations Wyoming Tribune Eagle -
Project Kilby TX
Bloomberg reports that National Grid will invest $1.75 billion for a 35% stake in Joulent LLC, and that Joulent is developing a gas-fired power plant with Chevron for Microsoft in Texas. Morgan Lewis (National Grid's law firm) and w.media identify the plant as Project Kilby Bloomberg (Eamon Farhat and Naureen S. Malik) -
Quantum Frederick MD
County Executive signs order pausing new data center permits and approvals through the end of 2026 Maryland Matters -
Amazon Web Services data center campus, Madison and St. Clair townships OH
Trenton City Council tables a vote on annexing 600 acres from St. Clair and Madison townships WVXU -
Brightseat Tech Park MD
County Council approves a two-year moratorium on data center permitting and development The Diamondback -
CloudHQ ORD Campus IL
Village hires HR Green, Inc. to review CloudHQ permits, with the developer bearing the cost Daily Herald -
Crossroads Technology Campus VA
Residents pack Board of Supervisors and Planning Commission meetings to challenge the project Fredericksburg Free Press -
Google Palo data center campus IA
Palo passes a data center ordinance; Linn County, which recently began an 18-month data center moratorium, considers allowing data centers as accessories to nuclear plants Iowa Public Radio -
Logan Prairie Data Center IL
Village of Latham calls off a planned Aug. 3 public hearing and vote on annexing and rezoning the site; the village attorney says the meeting was postponed and the application has not been withdrawn Blockspace -
Logan Prairie Data Center IL
County zoning officer says the state's attorney determined technical mistakes disqualified Hut 8's applications from August county meetings; if fixed and resubmitted they could be considered in September at the earliest Illinois Times -
Port Washington (Lighthouse) Data Center Campus WI
Oracle credit rating falls to BBB-; PSC rejects We Energies request to reconsider collateral rules; Oracle challenges rules in Ozaukee County Circuit Court Milwaukee Neighborhood News Service -
Project Bluegrass KY
Burgin officials give a first reading, on a favorable but not unanimous vote, to annexing some 500 acres into the city for the project DatacenterDynamics -
Project Bluegrass KY
Mercer County Joint Planning and Zoning Commission votes to advance data center zoning regulations restricting where large data centers can locate Kentucky Lantern -
Project Mila OH
Residents submit a petition to amend Trenton's charter to prohibit construction of data centers over 25 megawatts WVXU -
Project Mila OH
Trenton City Council approves a 15-year, 75% property tax abatement agreement and a compensation agreement with Prologis WVXU -
Project Phoenix PA
Aligned closes purchase of a 650.89-acre property in Shippingport for $223,150,865.38 Beaver County Radio -
Sentinel / Green Fig Data Center PA
Township issues first stop-work order over soil and health/safety plans; work resumes by end of July The Philadelphia Inquirer -
Stratos Project UT
O'Leary Digital and Box Elder County ask the First District Court to dismiss the June 3 referendum lawsuit Deseret News -
Stream Data Centers STAMP Campus NY
Tonawanda Seneca Nation, Sierra Club and a Town of Alabama resident sue the IDA and town officials over the STAMP incentive zoning agreement Investigative Post -
Tooele Valley data center (Burmester Road / I-80) UT
Utah Division of Water Quality holds public hearing on the discharge permit KSL.com -
Valara Holdings High Performance Compute Center SC
South Carolina Environmental Law Center sues Spartanburg County and Valara Holdings on behalf of nearby residents over the minor land development classification FOX Carolina
Jun 2026
-
CRG Festus Data Center MO
CRG unveils refined design: four single-story buildings, ~600 MW, closed-loop cooling The Missouri Times (CRG release) -
Menomonie Data Center (Balloonist LLC) WI
Mayor says a draft update to the I-4 data center zoning ordinance will be introduced at the Aug. 3 council meeting with no vote, and that Balloonist can apply to rezone to I-4 only after it is adopted City of Menomonie -
Microsoft Mega Park NC
Microsoft hosts a meeting with neighbors about the planned Microsoft Mega Park WRAL -
Polaris Forge 1 ND
Applied Digital says it delivered Phase 1 of Building 2 (75 MW), bringing live capacity at the campus to 175 MW Applied Digital -
Project Tembo WY
Site-plan amendment filing with the county identifies Google as the owner Cowboy State Daily -
Quantum Frederick MD
Maryland Supreme Court rules that a citizen referendum on the county's expanded data center zoning must stay off the ballot Maryland Matters -
Logan Prairie Data Center IL
Logan County Zoning Officer Allan Green deems Hut 8's land-use applications complete Illinois Times -
Switch Big Beaver data center campus PA
Local groups opposed to the project held a community meeting attended by nearly 100 people. WPXI -
Switch Big Beaver data center campus PA
Switch's general counsel signed the Beaver County land development application for 'Switch Pit 01-03'. Big Beaver Borough -
Hyperscale Data Dowagiac Campus MI
Company announces it bought 48.5 forested acres, taking the campus to 83 acres WWMT -
Meta Prometheus OH
OPSB authorizes the 250 MW Socrates the Younger plant (Case 26-0169-EL-BLN) to serve adjacent Meta data center Ohio Power Siting Board -
North Country Colocation Services Massena Expansion NY
Massena Town Planning Board holds a pre-submission meeting to discuss consultants and determine the lead agency for environmental review DatacenterDynamics -
Treetop East Fishkill Data Center NY
East Fishkill Town Board unanimously passes a three-year data center moratorium running through July 1, 2029 DatacenterDynamics -
Treetop East Fishkill Data Center NY
The town moves toward a moratorium as developers float the possibility of a project News 12 Hudson Valley -
Valara Holdings High Performance Compute Center SC
Hundreds of residents attend SCDES public meeting on the permit request SC Daily Gazette -
WF Industrial Yaphank Data Center NY
The proposal draws opposition from residents and from Town Supervisor Dan Panico, who proposes an 18-month moratorium and says he has support from other Suffolk town supervisors News 12 Long Island -
Golden Valley Technology Hub CA
Project publicly reported as Golden Valley Technology Hub 23ABC News (KERO) -
Hyperscale Data Dowagiac Campus MI
Hyperscale Data announces a 20 MW AI compute agreement with an unnamed California neocloud provider WWMT -
Calvert Technology Center MD
Calvert County primary election, in which voters push back against hyperscale data centers Maryland Matters -
Holder Industrial Park FL
Deltona Corporation withdraws its Holder Industrial Park comprehensive plan and zoning change applications ABC Action News (WFTS) -
Microsoft Fairwater WI
Microsoft announces construction of first facility is complete Microsoft Source -
Project Cardinal Data Center Campus IL
City Council approves an 18-month extension for the developer to acquire all property titles Shaw Local -
Project Lincoln KY
Planning and Zoning Commission unanimously sends revised data center regulations to Fiscal Court The Oldham Era -
Project Cornmaze WI
Panattoni holds an invite-only gathering on the project WIFR / Rockford News First -
Project Kilby TX
Chevron and Microsoft announce a 20-year agreement under which Chevron plans to build about 2.67 GW of gas-fired generation at the Project Kilby site in Reeves County E&E News by POLITICO -
Port Washington (Lighthouse) Data Center Campus WI
Oracle files petition in Ozaukee County Circuit Court seeking review of the PSC's data center tariff decision Ozaukee County Circuit Court (via WPR) -
Comanche Circle TX
NRG requests withdrawal of its air permit application for the 2 GW Tolar Power Center planned to supply Comanche Circle KERA News -
Logan Prairie Data Center IL
State's Attorney Bradley Hauge advises County Board members that proper procedures were not followed for the moratorium to be legally binding Illinois Times -
Logan Prairie Data Center IL
County Board fails 5-6 to approve a zoning ordinance specifically for data centers Illinois Times -
Highlander SM One data center TX
City Council votes 4-3 to prohibit data centers in all zoning districts Community Impact -
Prometheus Hyperscale Evanston Campus WY
An industrial subdivision rezone for the project is approved at a meeting in Lyman WyoFile (Uinta County Herald) -
Prometheus Hyperscale Evanston Campus WY
Uinta County Board of Commissioners unanimously approves the data center conditional use permit Prometheus Hyperscale -
Tooele Valley data center (Burmester Road / I-80) UT
Utah DWQ draft public notice for TVPID reverse-osmosis water treatment plant discharge permit Utah Division of Water Quality -
AWS Project Green MO
Amazon and Gov. Mike Kehoe announce a $10 billion data center campus in Montgomery County Office of Missouri Governor Mike Kehoe -
Hut 8 River Bend Campus LA
West Feliciana Parish Council and Industrial Development Board accept an agreement for a $10 million PILOT prepayment from Hut 8 due July 1, 2026 WBRZ -
Monarch Compute Campus WV
WVDEP public hearing on air permit at Mason County Courthouse Charleston Gazette-Mail -
xAI Colossus 2 TN
Justice Department files motion to intervene and seek dismissal of the NAACP Clean Air Act lawsuit. Lawyer Monthly -
Port Washington (Lighthouse) Data Center Campus WI
DNR issues air construction and operation permits for 45 diesel emergency generators Wisconsin Department of Natural Resources -
Sentinel / Green Fig Data Center PA
Chester County judge denies residents' appeals of project approvals The Philadelphia Inquirer -
Project Kilby TX
TCEQ posts a public meeting notice for Energy Forge One LLC's air permit applications for the Kilby Power Plant Texas Commission on Environmental Quality -
Stratos Project UT
County adopts a 180-day pause on new data centers and the power plants built to serve them; Stratos is exempt because it falls under MIDA Utah Public Radio -
Amazon Web Services Madison County Mega Site campus MS
Amazon says it plans to at least double its presence at the Canton campus Mississippi Today -
Comanche Circle TX
Commissioners approve Comanche Circle 3-1 without conditions; technical requirements deferred to site development plan KERA News -
DC BLOX Nashville Data Center TN
Permit documents show two buildings (10 MW and 40 MW) plus generator yards and substation WSMV -
Meta El Paso Data Center TX
El Paso City Council votes 5-3 against beginning negotiations to end the Meta incentive agreement KFOX14 -
xAI Colossus 2 TN
Southaven residents file a federal class action against xAI and MZX Tech over turbine noise. Mississippi Today -
Stratos Project UT
O'Leary tells Senate President J. Stuart Adams by letter he will scale back the project, saying it won't be 'the largest data center in the world' The Salt Lake Tribune -
Joule Energy and Data Center Campus UT
Residents and critics say few environmental studies were done; a commissioner says the projects will stay within existing water rights KUTV -
Old Bermuda Data Center VA
Board of Zoning Appeals upholds the planning director's denial WWBT 12 On Your Side -
Project Rainier (AWS New Carlisle campus) IN
Amazon holds ribbon-cutting for campus administration building WVPE -
Riverview Innovation & Technology Campus NY
Residents pack a Town of Tonawanda planning board meeting to share concerns about the proposal WKBW 7 News Buffalo -
Avemore Data Park GA
Carroll County commissioners extend the moratorium another 100 days, 7-0 Times-Georgian -
QTS Augusta Data Center Campus GA
Augusta Commission imposes a 49-day pause on new data centers that does not apply to the QTS project WRDW/WAGT News 12 -
Switch Big Beaver data center campus PA
Switch held a public town hall at the Big Beaver fire hall to present the three-building plan. Police provided security for a large crowd. Beaver County Radio -
QTS Augusta Data Center Campus GA
WGAC reports that crews have begun clearing trees and brush from the site WGAC -
Saline Township Stargate Data Center MI
Partners and Gov. Whitmer celebrate construction; first building nearing completion Oracle -
Amazon Web Services data center campus, Madison and St. Clair townships OH
Butler County enacts a six-month data center moratorium covering Madison and five other townships WVXU -
Golden Valley Technology Hub CA
CRC files permit applications with Kern County (reported in August; the June 15 Bakersfield Californian report said CRC was planning to apply) Taft Midway Driller -
Imperial Data Center CA
Board of Supervisors adopts 45-day data center moratorium; developer sues IID for water access County of Imperial -
Perry Township Data Center OH
Stark County Board of Commissioners approves the project's Community Reinvestment Area tax deal, the final step in granting it The Canton Repository (via AOL) -
Project Cornmaze WI
Panattoni says the Town of Turtle board postponed a cost reimbursement agreement that had been set for its June 9 meeting DCD -
Project Liberty SC
Stream Data Centers says on its website that Project Liberty will not move forward, citing utility timing constraints WMBF News -
Project Rainier (AWS New Carlisle campus) IN
Four Republican council members ask Amazon to voluntarily return part of its tax break WVPE -
Riverview Innovation & Technology Campus NY
Town Supervisor John Flynn says the project is on hold after the developer requested its application be paused because of a backlog at NYISO Buffalo Toronto Public Media (BTPM NPR) -
Riverview Innovation & Technology Campus NY
Riverview officials say in a statement that the project is not on hold Spectrum News 1 (Buffalo) -
Riverview Innovation & Technology Campus NY
The developer says it has temporarily delayed SEQRA and site plan review with the Town of Tonawanda Planning Board while it awaits information from NYISO and National Grid WKBW 7 News Buffalo -
Stratos Project UT
Referendum group BEAR sues in 1st District Court over referendum rejection; separate civil-rights suit filed by residents and Alliance for a Better Utah Utah Public Radio -
Viridian Data Center Campus (former GM/JATCO site) WI
City Council votes not to extend the letter of intent with Viridian WMTV 15 News
May 2026
-
QTS Van Wert Data Center Campus OH
City leaders announce that QTS has acquired the proposed $10 billion project 21Alive News -
IREN Sweetwater data center campus TX
IREN announces NVIDIA partnership on AI-ready design; about 300 construction workers on site KTXS -
Kenwood Commons NY
Albany County Executive Dan McCoy says the county has no control over the site and calls for a cost-benefit analysis of the proposal Spectrum News -
PORTS-Pike Technology Campus OH
Permit filed with Ohio EPA covering wetlands and stream impacts on private land WOUB Public Media -
Stratos Project UT
County Attorney Stephen R. Hadfield rejects referendum applications, calling the resolutions administrative rather than legislative Utah News Dispatch -
North Country Colocation Services Massena Expansion NY
Local reporting counts about ten data center proposals under discussion in the Massena area, with this one furthest along WWNY 7 News -
Project Flex MI
Developer's attorney submits final site plan response letter threatening legal action over delays WXYZ -
WF Industrial Yaphank Data Center NY
An AI-generated flyer circulating on Long Island sparks confusion and concern about a possible Brookhaven data center proposal News 12 Long Island -
Hyperscale Data Dowagiac Campus MI
Class action over facility noise filed in U.S. District Court, Western District of Michigan, against Alliance Cloud Services WWMT -
WF Industrial Yaphank Data Center NY
News12 reports an AI-generated flyer sparking concern over a possible Brookhaven data center proposal. News 12 Long Island -
Monarch Compute Campus WV
Silt fence failure during site work floods properties of six residents (May 23-24) Charleston Gazette-Mail -
Stargate Abilene TX
Buildings 3-4 become operational, bringing IT power to 412 MW at 4 buildings (Epoch AI estimate from satellite analysis) Epoch AI -
Meta Maysville campus KY
Fiscal Court gives second reading and final approval to rezoning 28 properties for the data center; the developer was not yet named WEKU -
Switch Core 2.0 Phase 1 Campus NV
KTNV reported, citing county assessor records, that Switch had bought more than 300 acres in the Apex area for about $200 million. The city said it had no plans to share. KTNV Channel 13 Las Vegas -
Prime Phoenix Campus AZ
Prime breaks ground on three buildings; Buildings 1–3 secured by a leading hyperscaler Prime Data Centers -
CyrusOne Sangamon County Data Center IL
CyrusOne signs state incentive MOU requiring $500 million investment by March 2031 Illinois Times -
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
Fleet and Tract break ground on a 2 million sq ft data center along USA Parkway with Gov. Joe Lombardo in attendance KOLO 8 News Now -
Cloverleaf, Village of Wrightstown WI
Residents speak against a possible data center at the second of four planned community discussions at Wrightstown Village Hall Wisconsin Public Radio -
Logan Prairie Data Center IL
Logan County Board votes 6-4 for a 12-month data center moratorium Illinois Times -
Powers Ferry Place Data Center GA
Prime Storage files the rezoning application for a data center at 1155 Powers Ferry Place Atlanta Press Collective -
Project Cannoli MI
Board of Trustees meeting on the project; development agreement dated May 20 Charter Township of Van Buren -
Project Cumulus MO
City Council votes 7-1 to amend code defining data centers separately from warehouses, effectively banning them Mid Rivers Newsmagazine -
Switch Big Beaver data center campus PA
The borough said Switch had told it of its plans but had not yet filed a formal application, and it outlined its review steps. WPXI -
Gateway Digital Campus MO
First Alert 4 reports on continued community feedback sessions covering both Franklin County data-center proposals First Alert 4 (KMOV) -
Joliet Technology Center IL
Residents and Joliet Residents For Responsible Growth sue city and developers in Will County Shaw Local (The Herald-News) -
North Country Colocation Services Massena Expansion NY
St. Lawrence County Planning Board chairman Vance Fleury calls the site plan premature, with too many unanswered questions; an earlier version described about 2.6 million gallons a day of river withdrawals and three buildings of 562,000, 612,000 and 400,000 sq ft NNY360 / Watertown Daily Times -
Perry Township Data Center OH
Canton City Council approves the tax break agreement The Canton Repository (via AOL) -
QTS Richmond campus expansion (RIC4 and RIC5) VA
QTS's plans for 17 new data centers across RIC4 and RIC5 are reported WTVR CBS 6 (Richmond BizSense) -
Perry Township Data Center OH
The Canton Repository describes the Amazon data center in Perry Township as under construction The Canton Repository (via AOL) -
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
NV Energy states data centers did not influence the Liberty decision and it will serve Liberty until Greenlink West is in place KTVN 2News -
Fort Meade Hyperscale Data Center FL
Five Fort Meade residents file two lawsuits saying the city did not properly review whether the data center is compatible with the surrounding neighborhood The Citrus Tea -
Microsoft Fairwater Atlanta GA
Fayette County publishes fact sheet saying QTS monthly water use is under 1% of county water production Fayette County, Georgia -
Project Cannoli MI
Planning Commission approves site plan for substation/switching station Planet Detroit -
QTS Fayetteville data center campus GA
Fayette County issues statement on QTS construction water use Fayette County -
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
Fortune publishes report linking NV Energy's Tahoe supply exit to data center demand Fortune -
Project Arrowhead GA
Comment deadline for regional review Southern Georgia Regional Commission (via WWALS) -
Fort Meade Hyperscale Data Center FL
Gov. Ron DeSantis signs Senate Bill 484, which adds state oversight of large data centers, including requirements for large water-use permits ABC Action News (tampabay28.com) -
Meta Beaver Dam Data Center WI
Wisconsin Public Service Commission approves a modified version of Alliant Energy's one-off power supply contract with the Meta subsidiary Wisconsin Watch -
Ranalli Lysander Data Center NY
Lysander Town Board adopts a six-month moratorium at a meeting more than 350 residents attend to oppose the project Rockefeller Institute of Government -
xAI Colossus TN
Anthropic announces an agreement with SpaceX to use all of the compute capacity at Colossus 1, which it says adds more than 300 MW and over 220,000 NVIDIA GPUs; FOX13 Memphis reports the same agreement Anthropic -
Cloverleaf, Village of Wrightstown WI
Cloverleaf confirms to FOX 11 that Wrightstown is an area it is looking at FOX 11 (WLUK) -
Monarch Compute Campus WV
WVDEP inspection documents dust cloud; department issues warning Charleston Gazette-Mail -
Project Sail GA
Residents file appeal and declaratory judgment petition in Coweta County Superior Court against the county and Atlas Development The Citizen -
Google Hermantown Data Center MN
City Council tables the resolution on the tax abatement and development agreements after a public hearing City of Hermantown -
QTS Van Wert Data Center Campus OH
Van Wert City Council holds a public hearing on a proposed $10 billion data center on the megasite that Thor Equities bought part of in late 2025 21Alive News -
Stratos Project UT
Box Elder County Commission unanimously approves two resolutions (MIDA interlocal agreement and consent to adding private land to project area) amid protests by roughly 1,100 attendees Utah News Dispatch -
Holder Industrial Park FL
Citrus County enacts a one-year moratorium on new data centers; the pre-moratorium proposal remains under discussion Spectrum News -
IREN Sweetwater data center campus TX
IREN announces energization of the 1.4 GW Sweetwater 1 site IREN -
Amazon Web Services data center campus, Madison and St. Clair townships OH
St. Clair Township enacts a 12-month moratorium on data centers WVXU -
Compass Datacenters Red Oak second campus TX
City Council approves rezoning of 830 acres around midnight after a packed meeting FOX 4 Dallas-Fort Worth -
Compass Datacenters Red Oak second campus TX
City Council votes 4-1 to approve a tax abatement for the project FOX 4 Dallas-Fort Worth -
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
NV Energy enters large load electric service agreement with Fleet subsidiary SV RNO Property Owner 1, LLC This Is Reno / Nevada Current -
Project Steel Data Center Campus IL
The group suing over Project Cardinal files another lawsuit targeting the Project Steel campus WSPY News -
Prometheus Hyperscale Evanston Campus WY
Uinta County planning commission unanimously recommends zoning and conditional use permit approvals Cowboy State Daily -
QTS Van Wert Data Center Campus OH
Council approves three ordinances to annex and rezone the site, 6-0 (WANE page shows no date) WANE -
Stafford Technology Campus VA
Stack holds a topping-out ceremony for the first building on the campus Fredericksburg Free Press -
Treetop East Fishkill Data Center NY
The East Fishkill supervisor publicly rejects the prospect of a large data center in the town; local outlets report that rumors of a proposal are premature Mid Hudson News -
West Sedgwick County data center land acquisitions KS
Commission unanimously extends interim control through 2026-09-11 KMUW
Apr 2026
-
Amazon Web Services Madison County Mega Site campus MS
Five buildings reported operating at the Mega Site; Veolia wastewater partnership for cooling described WLBT -
Prince William Digital Gateway VA
QTS files appeal petitions with the Supreme Court of Virginia Virginia Business -
Switch Big Beaver data center campus PA
Switch announced a 382-acre campus in Big Beaver Borough, to join its existing campuses in Atlanta, Austin, Grand Rapids, Las Vegas and Tahoe Reno. Switch -
Google Hermantown Data Center MN
Stop the Hermantown Data Center files a lawsuit in St. Louis County District Court MPR News -
Muncy Data Center PA
Muncy Township acknowledges receipt of a conditional use plan for the Muncy Data Center NorthcentralPA.com -
Saline Township Stargate Data Center MI
Financing secured (Related Digital, Blackstone-affiliated funds, PIMCO-managed accounts) CBS Detroit -
Stratos Project UT
Application filed with the Utah Division of Water Rights to transfer an 11 acre-foot Hansel Valley water right for the project KSL.com -
Compass Datacenters Red Oak second campus TX
Planning and zoning board votes 3-2 not to recommend the rezoning Ellis County Press -
Project Flex MI
Oakland County Election Commission approves recall petition language against township trustees WDIV ClickOnDetroit -
Fort Meade Hyperscale Data Center FL
Earthjustice, for the Environmental Confederation of Southwest Florida, asks the city to reconsider and revoke its approval The Ledger (via AOL) -
Gateway Digital Campus MO
The Missouri Times reports on the Planning and Zoning Commission's recommendation, citing projections of more than 3,000 jobs and tens of millions of dollars a year in tax revenue The Missouri Times -
Meta Maysville campus KY
Joint planning commission approves the development plan with a condition and the rezoning findings of fact City of Maysville -
Gateway Digital Campus MO
Franklin County's Planning and Zoning Commission votes 8-1 to recommend approval of the Diamond 66/Diamond Farms (Gateway Digital Campus) rezoning Franklin County, Missouri (franklinmo.gov) -
Highlander SM One data center TX
Motion to prohibit data centers citywide fails 3-4; data centers restricted to high industrial zones Community Impact -
Meramec Valley Technology Park MO
Franklin County's Planning and Zoning Commission votes against recommending approval of BLE Landholdings' rezoning request, four in favor to five opposed Franklin County, Missouri (franklinmo.gov) -
Meta Rosemount Data Center MN
Rosemount City Council unanimously adopts a one-year moratorium covering new data center developments Sun ThisWeek (hometownsource.com) -
Project Cherry Blossom MI
Township board unanimously approves first reading of a six-month moratorium on data center uses Frenchtown Charter Township -
Project Marvel AL
Council approves rezoning of 914 acres, allowing 18 data center structures across an expanded footprint ABC 33/40 -
Farmington Technology Park MN
City approves updated development agreements for two additions City of Farmington -
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
Fleet files PUCN applications for South Valley (Docket 26-04026) and Peru Ridge (Docket 26-04027) self-generation plants The Nevada Independent -
Monarch Compute Campus WV
Monarch Cloud Campus LLC submits air construction permit application to WVDEP for 2.16 GW on-site generation Charleston Gazette-Mail -
Remington Site Data Center NY
Reporting describes plans for two 250,000 sq ft data centers totaling 200 MW on the former plant site, with an online petition against the proposal gathering more than 150 signatures DatacenterDynamics -
Sabey Decatur Technology Park IN
Seven Decatur Township residents file petition for judicial review of the commission's decision Mirror Indy -
Saline Township Stargate Data Center MI
AG Dana Nessel appeals MPSC approval to Michigan Court of Appeals Michigan Department of Attorney General -
Stargate Lordstown OH
Epoch AI review reports land cleared but no large-scale data center construction visible Epoch AI -
Meta Hyperion LA
LPSC votes 4-1 to fast-track Entergy's plan for seven new gas plants for the campus Louisiana Radio Network -
Ranalli Lysander Data Center NY
Lysander Town Board work session and regular meeting; the board votes 4-0 to start drafting a data center moratorium after a petition passes 1,600 signatures Baldwinsville Messenger / Eagle News Online -
Microsoft Gaines Township data center MI
Third public hearing on rezoning of about 104 acres; Planning Commission tables decision WWMT -
Muncy Data Center PA
Zoning permit application for the data center is dated April 15 Williamsport Sun-Gazette -
Fort Meade Hyperscale Data Center FL
City Commission votes 5-0 to approve the 20-year developer agreement, revised to be contingent on a water district permit The Ledger (via AOL) -
Port Washington (Lighthouse) Data Center Campus WI
DNR public hearing on air permit (comment period Mar. 3-Apr. 14) Wisconsin Department of Natural Resources -
Prince William Digital Gateway VA
Board of County Supervisors unanimously votes not to appeal Virginia Business -
Project Jupiter NM
County Commission orders review of developer statements, including on closed-loop cooling and water Doña Ana County -
xAI Colossus 2 TN
NAACP, represented by SELC and Earthjustice, sues xAI and its subsidiary MZX Tech under the Clean Air Act over gas turbines run at the Southaven plant before an air permit; MDEQ had granted a permit for 27 turbines in March 2026. The plant powers Colossus 2. DOJ moved in June 2026 to intervene on the company's side WLBT -
Project Blue AZ
Superior Court Judge Brenden Griffin dismisses No Desert Data Center Coalition's open-meeting lawsuit; plaintiffs planned appeal AZPM -
Project Arrowhead GA
Irwin County submits the project as DRI #4689 to the Georgia Department of Community Affairs WWALS Watershed Coalition -
Amazon Web Services Madison County Mega Site campus MS
Gov. Tate Reeves announces $11 billion AWS expansion in Madison County, part of $25 billion statewide Office of Governor Tate Reeves -
CRG Festus Data Center MO
Residents and Wake Up Jeffco LLC sue City of Festus and CRG Acquisition LLC in St. Louis County Circuit Court Jefferson County Leader -
Eco-Yotta Oneonta Data Center NY
Public hearing on the moratorium; residents voice support for it WBNG -
CRG Festus Data Center MO
Four pro-project incumbent council members lose reelection Jefferson County Leader -
Port Washington (Lighthouse) Data Center Campus WI
Port Washington voters approve a referendum requiring voter approval of future large TIDs; it does not affect the TID already approved for the data center WUWM -
Project Sail GA
Board of Commissioners approves rezoning 3-2 (McKenzie and Blackburn opposed) Atlanta Journal-Constitution -
Deep Green Lansing data center MI
Deep Green withdraws its conditional rezoning request Lansing State Journal (via AOL) -
Natelli data center, U.S. 158 NC
Vance County Board of Commissioners delays a decision on the rezoning DatacenterDynamics -
Project Horizon TX
DCD reports, citing the Financial Times, that the CoreWeave deal collapsed and Poolside is seeking new partners DatacenterDynamics -
Project Cherry Blossom MI
Planning Commission holds public hearing on the proposed moratorium Frenchtown Charter Township -
Project Kilby TX
Chevron, Microsoft and Engine No. 1 confirm exclusive talks on gas-fired power for a West Texas campus, saying no definitive agreement exists yet Fortune -
Calvert Technology Center MD
Amazon reveals it may develop a data center close to the Calvert Cliffs Nuclear Power Plant, according to DatacenterDynamics DatacenterDynamics -
Fort Meade Hyperscale Data Center FL
Fort Meade Planning and Zoning Commission approves the project and sends it to the City Commission Spectrum News 13 -
Fort Meade Hyperscale Data Center FL
Florida Commerce Secretary Alex Kelly issues a letter opposing the project WUSF -
Google Fort Wayne data center IN
IDEM approves plans for more than 140 additional emergency diesel generators at the campus 21Alive (WPTA) -
Logan Prairie Data Center IL
County Board does not extend the moratorium and sends the issue back to the zoning board pending a data center ordinance FOX Illinois -
Microsoft Mega Park NC
Microsoft says the project is in the planning phase with early site preparation underway, including road work tied to permanently closing Country Club Road, expected to last until late summer 2026 Microsoft -
Natelli data center, U.S. 158 NC
Vance County Board of Commissioners votes 6-1 to rezone land that could be used for a data center DatacenterDynamics -
Nebius Vineland Data Center NJ
More than 100 residents rally against the project at Giampietro Memorial Park SNJ Today -
New Hill Digital Campus NC
Apex Town Council unanimously passes a 12-month moratorium on data centers INDY Week -
Perry Township Data Center OH
Panattoni hosts an open house at Perry High School on the project Ideastream Public Media -
Project Cardinal Data Center Campus IL
A lawsuit names the City of Yorkville and Pioneer Development LLC as defendants Shaw Local -
Project Tembo WY
Crusoe pauses development 'at the request of our customer' and leaves the project Wyoming Tribune Eagle -
Remington Site Data Center NY
An environmental assessment of the Remington Arms site finds contamination New York Almanack -
Riverview Innovation & Technology Campus NY
Plans for a 300MW, 500,000 sq ft data center on the site are before the Town of Tonawanda planning board DatacenterDynamics
Mar 2026
-
Prince William Digital Gateway VA
Virginia Court of Appeals affirms voiding of rezonings Virginia Business -
Project Kilby TX
Bloomberg Línea reports Microsoft is in exclusive talks with Chevron and Engine No. 1 over a power plant near Pecos priced at about $7 billion Bloomberg Línea -
Sentinel / Green Fig Data Center PA
Board of Supervisors votes unanimously to begin a curative amendment process for data center zoning, which does not affect this pending project. The Philadelphia Inquirer -
CRG Festus Data Center MO
City Council approves development agreement with CRG, 6-2 St. Louis Public Radio -
Fermi America Project Matador TX
Fermi America files a second 5 GW clean air permit application with TCEQ Fermi America (PR Newswire) -
Project Lincoln KY
Planning Commission reworking regulations; moratorium remains in effect WAVE / WDRB -
Pumpkin Technology Campus GA
Superior Court order dismissing the Pumpkin Center petition with prejudice is signed and filed WRDW -
White Oak Technology Park GA
Columbia County Superior Court dismissal orders filed (White Oak order signed March 19) WRDW -
Meta Cheyenne Data Center WY
BOPU revokes the company's industrial discharge privileges for fill-and-flush operations Cowboy State Daily -
Perry Township Data Center OH
Perry Township trustees approve the Community Reinvestment Area tax break agreement for the data center The Canton Repository (via AOL) -
Project Steel Data Center Campus IL
Yorkville City Council approves Project Steel, with only Alderman Rusty Corneils voting no Shaw Local -
CyrusOne Sangamon County Data Center IL
County Board votes 15-13 to table the conditional use permit NPR Illinois -
Homer City Energy Campus PA
Environmental Hearing Board denies Homer City Generation's motion to consolidate the two permit appeals Lehigh Daily -
Meta Maysville campus KY
Local press reports that a zoning map amendment application for a hyperscale data center has been submitted, seeking to change about 2,080 acres from agricultural to industrial use Maysville Online -
Google Kansas City Data Center (Hunt Midwest Business Center) MO
The campus is reported still under construction KCUR -
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
CalMatters reports NV Energy will not renew power supply to Liberty Utilities' ~49,000 Lake Tahoe customers (contract ending May 2027), citing its own resource needs CalMatters -
PORTS-Pike Technology Campus OH
DOE, SoftBank and SB Energy announce 10 GW data center campus and 9.2 GW gas generation at the Portsmouth site U.S. Department of Energy -
Joliet Technology Center IL
City Council approves project 8-1 (Councilwoman Suzanna Ibarra dissenting) Shaw Local (The Herald-News) -
Sabey Decatur Technology Park IN
Metropolitan Development Commission approves the project's variances Mirror Indy -
Gateway Digital Campus MO
A roughly 11-hour Franklin County Planning and Zoning Commission hearing at Union High School draws over 1,000 attendees on both Franklin County data-center rezoning requests and proposed county data-center rules; the commission defers a decision Columbia Missourian / Missourian.com -
Meramec Valley Technology Park MO
The roughly 11-hour Franklin County Planning and Zoning Commission hearing on both Franklin County data-center proposals draws over 1,000 attendees; a decision is deferred Columbia Missourian / Missourian.com -
Project Cannoli MI
Google and DTE Energy confirm Google as the company behind the project; Google commits to a contested case at the MPSC Michigan Advance -
Joliet Technology Center IL
City Council public hearing on the proposal (lawsuit alleges residents were denied due process) Shaw Local (The Herald-News) -
West Sedgwick County data center land acquisitions KS
KMUW reports Monarch Energy and NextEra Energy are pursuing 1,000+ acres in western Sedgwick County KMUW -
AWS Project Green MO
Date of Amazon's air construction permit application cover letter; the application covers 483 generators Missouri Department of Natural Resources, Air Pollution Control Program -
Eco-Yotta Oneonta Data Center NY
Oneonta Town Board introduces a 12-month moratorium on data center construction and schedules a public hearing WBNG -
Project Delta NC
Community groups and residents file suit in Stokes County Superior Court challenging the January rezoning Southern Environmental Law Center -
West Sedgwick County data center land acquisitions KS
County holds listening town hall on data centers Sedgwick County -
Project Cardinal Data Center Campus IL
City Council vote at 12:51 a.m. after a meeting that began at 7 p.m. March 10 Shaw Local -
QTS York County Data Center Campus SC
Construction of the center off Hands Mill Highway is underway SC Daily Gazette -
xAI Colossus 2 TN
Mississippi DEQ board approves 41 turbines (1.2 GW) to power Colossus 2 and planned Colossus 3 DatacenterDynamics -
Microsoft Fairwater Atlanta GA
City of Fayetteville prohibits new data centers in every zoning district via Ordinance 26-0-12 City of Fayetteville, GA -
Project Galaxy (AWS Sidney data center) OH
Residents gather to raise questions about water use, light pollution and farmland WHIO-TV -
Stargate Abilene TX
Lancium and Crusoe brief Abilene leaders; construction expected to run through Q1 2027 KTXS -
Google Palo data center campus IA
Linn County announces Google will pursue development in Palo through annexation instead of under the county's data center ordinance Iowa Public Radio -
Avemore Data Park GA
Carroll County Board of Commissioners approves a 100-day moratorium on data center permits in unincorporated areas, 7-0 Times-Georgian -
Google Hermantown Data Center MN
Google announces plans for the Hermantown data center City of Hermantown -
Cloverleaf, Village of Wrightstown WI
Cloverleaf's chief development officer tells the village administrator by email that a northeast Wisconsin project would be comparable in size to the opening phase of the Port Washington data center Wisconsin Public Radio -
Deep Green Lansing data center MI
Lansing Planning Commission approves the proposal, sending it to City Council Lansing Regional Chamber of Commerce -
Goodnight Campus TX
Wind-powered portion of the campus sold to Ensign Infrastructure, which becomes the large load in the co-location application Latitude Media -
Google Morgan County Data Center IN
Monrovia Town Council votes 3-2 to begin exploring annexation of land east of town including the site Indiana Public Media -
Natelli data center, U.S. 158 NC
Vance County Planning Board unanimously approves the Natelli rezoning request DatacenterDynamics -
Project Flex MI
Township board adopts six-month moratorium on additional data center proposals WDIV ClickOnDetroit -
Valara Holdings High Performance Compute Center SC
Valara asks SCDES to add natural gas combustion turbines to its air permit SC Daily Gazette
Feb 2026
-
Project Arrowhead GA
Ocilla-Irwin Planning Advisory Commission votes 4-0 to recommend a related special-use request; the applicant withdraws it March 2 Vesper OSINT -
Meramec Valley Technology Park MO
A special Pacific Planning and Zoning Commission meeting ends within minutes after Beltline Energy tables its city-level rezoning request, citing an inability to finalize a funding agreement First Alert 4 (KMOV) -
Meta Hyperion LA
LPSC declines to investigate Meta's financing arrangement with Blue Owl Capital for the data center Union of Concerned Scientists -
Project Arrowhead GA
Premier Data Center Development, LLC is formed with the Georgia Secretary of State Vesper OSINT -
Pumpkin Technology Campus GA
Resident Gregory P. Guido Jr. files a judicial review petition challenging the Pumpkin Center rezoning WRDW -
White Oak Technology Park GA
Gregory P. Guido Jr. files judicial review petitions challenging White Oak and Pumpkin Center rezonings WRDW -
CoreWeave Lancaster data center PA
Report that lenders passed on construction financing; CoreWeave says project is fully funded and moving forward LancasterOnline -
Logan Prairie Data Center IL
Logan County Board approves a 60-day data center moratorium Illinois Times -
Microsoft Mega Park NC
Microsoft and local officials confirm the Mega Park site will be the future home of a data center The Assembly -
West Sedgwick County data center land acquisitions KS
Senate Majority Leader Chase Blasi asks county for a three-year moratorium KWCH -
Saline Township Stargate Data Center MI
Washtenaw County judge denies a resident's motion to intervene in the consent judgment. Planet Detroit -
CyrusOne Sangamon County Data Center IL
Zoning Board of Appeals votes 5-0 to recommend approval Illinois Times -
Project Blue AZ
Arizona Attorney General files appeal in Maricopa County Superior Court challenging the ACC's approval of the TEP–Beale agreement Arizona Attorney General's Office -
Highlander SM One data center TX
City Council denies land use change 5-2 in early-morning vote after a motion to postpone fails CBS Austin -
Joliet Technology Center IL
Public notice issued for zoning hearing (lawsuit alleges it failed to describe the data center) Shaw Local (The Herald-News) -
Wallace Jackson Data Center Campus GA
Nearby residents file two lawsuits against Spalding County in Spalding County Superior Court challenging the zoning decision The Griffin Daily News -
Eco-Yotta Oneonta Data Center NY
The 153-acre County Highway 9 property is listed for sale at $1,050,000 by Keller Williams Upstate NY Properties, All Otsego reports All Otsego -
Google Kansas City Data Center (Hunt Midwest Business Center) MO
Google says it “will cover the full energy costs associated with powering both of the Google data center campuses” KSHB 41 -
Project Mica MO
Construction is underway on Google's second Kansas City-area data center; no completion timeline given KSHB 41 -
Meta Lebanon Data Center IN
Meta confirms the project and holds groundbreaking; investment stated as more than $10 billion City of Lebanon -
QTS Augusta Data Center Campus GA
QTS and residents meet at a town hall at Belair Elementary WRDW/WAGT News 12 -
Imperial Data Center CA
Imperial County Superior Court finds the City of Imperial's amended CEQA complaint legally insufficient Calexico Chronicle -
QTS York County Data Center Campus SC
QTS holds a community meeting with residents as construction continues WBTV -
Deep Green Lansing data center MI
Residents raise concerns about the proposal at a Lansing City Council public hearing WILX -
Viridian Data Center Campus (former GM/JATCO site) WI
City Council places a citizen initiative requiring voter approval for projects over $450 million at the GM/JATCO site on the Nov. 3, 2026 ballot Ballotpedia News -
Project Boulder SC
Seven of nine Colleton County legislators sign resolution opposing the project SC Daily Gazette -
Ridgeline Facility WV
West Virginia Air Quality Board upholds permit over appeal by Tucker United, WV Highlands Conservancy and Sierra Club POWER Magazine -
Project Liberty SC
Project, previously referred to as Project Liberty, is reported as now associated with Eagle Myra, LLC WPDE -
Mt. Orab Mega Site data center OH
Council member Eric Lang proposes ordinances for a 180-day pause on new data center permits Brown County Press -
Project Phoenix PA
DCD reports Aligned plans natural gas-powered data center buildings at the 660-acre Shippingport Industrial Park owned by Frontier Group of Companies DatacenterDynamics -
QTS Augusta Data Center Campus GA
QTS presents the project to the Augusta Commission, saying it plans to invest $2 billion WRDW/WAGT News 12 -
QTS DeForest Data Center Campus WI
DeForest Village Board votes 7-0 to reject the annexation; QTS had withdrawn its plan amendment and rezoning applications WKOW -
AWS Project Green MO
Preserve Montgomery County files a lawsuit against the county KBIA / Columbia Missourian -
Calvert Technology Center MD
Residents first learn of plans for data centers on part of the Calvert Cliffs property in Lusby, according to WJLA WJLA (7News) -
Comanche Circle TX
Commissioners reject second moratorium 3-2 and seek Attorney General opinion on authority KERA News -
Google Botetourt County Data Center Campus VA
County receives first construction permit applications for grading Botetourt County, VA -
Google Fort Wayne data center IN
Google launches an informational website about the data center 21Alive (WPTA) -
Google Morgan County Data Center IN
Earthmovers begin shifting dirt on the site Indiana Daily Student -
Microsoft Mega Park NC
Person County announces that Microsoft plans to start the data center permitting process later in the year DatacenterDynamics -
Project Peninsula MI
Township Board unanimously approves a six-month moratorium on data center proposals FOX 17 West Michigan -
Pumpkin Technology Campus GA
Board of Commissioners approves the rezoning 4-1 with larger buffers and berms WRDW -
Sentinel Grove Technology Park FL
County Commissioner Cathy Townsend says the developer appears to have pulled back in anticipation of new state legislation WPTV -
White Oak Technology Park GA
Board of Commissioners unanimously approves D-C data center rezoning with 65 dB noise cap; also approves Pumpkin Center, rejects Byrd Farms The Augusta Press
Jan 2026
-
Saline Township Stargate Data Center MI
Residents file a mandamus complaint in Washtenaw County Circuit Court alleging the Zoning Board of Appeals failed to hold a required hearing on a data center permit. Planet Detroit -
Meramec Valley Technology Park MO
The City of Pacific holds a community meeting on Beltline Energy's proposed data center campus St. Louis Magazine -
Project Rainier (AWS New Carlisle campus) IN
The Department of Energy ordered the data center to cut 50 MW from the grid; backup diesel generators ran and cold weather disrupted pollution controls on five of them InkFreeNews.com (Indianapolis Star / Notre Dame Gallivan Program) -
QTS DeForest Data Center Campus WI
Village staff determine the proposal is not feasible and recommend rejecting the annexation petition Village of DeForest -
GW Ranch TX
Developer announces it has obtained the TCEQ air permit for up to 7.65 GW of gas generation (exact issue date not given in sources) Texas Public Radio -
Microsoft Fairwater WI
Mount Pleasant Village Board unanimously approves up to 15 additional Microsoft data centers w.media -
Project Liberty SC
Marion County Council approves a fee-in-lieu-of-tax agreement for Project Liberty Capital B News -
Wallace Jackson Data Center Campus GA
Spalding County Board of Commissioners approves the variance, rezoning and special exception, each 4-0 The Griffin Daily News -
Galaxy Helios TX
Galaxy announces ERCOT approval of an additional 830 MW, bringing approved capacity above 1.6 GW Galaxy Digital -
Gateway Digital Campus MO
Franklin County's Planning and Zoning Commission initially tables the rezoning request for six months before it is brought back sooner than that timeline First Alert 4 (KMOV) -
Lake Hawkeye NY
Tompkins County Legislature votes 14-1, with one recusal, to urge the DEC to reject the water withdrawal permit application and require a new application with environmental review Ithaca Times -
Meta Beaver Dam Data Center WI
Construction is ongoing at the Beaver Dam Commerce Park site Wisconsin Watch -
Project Lincoln KY
Fiscal Court unanimously denies draft data center regulations, sending them back to Planning and Zoning Commission The Oldham Era -
Switch Core 2.0 Phase 1 Campus NV
DCD reported, citing property records, that Switch paid $85.5 million for 176 acres at Apex Industrial Park. DatacenterDynamics -
Meta El Paso Data Center TX
El Paso Electric proposes $473M McCloud gas plant to serve the data center KVIA (El Paso Matters) -
Gateway Digital Campus MO
Local reporting identifies the Eckelkamp family's Diamond Farms, LLC and Diamond 66, LLC as landowners in talks with a data center developer for roughly 613 acres adjoining Shaw Nature Reserve near Villa Ridge St. Louis Magazine -
Saline Township Stargate Data Center MI
EGLE issues a wetlands permit allowing a stream disturbance, culvert and three stormwater structures. Planet Detroit -
Meta Hyperion LA
Alliance for Affordable Energy and Union of Concerned Scientists ask the LPSC to investigate Meta's new financing arrangement for Hyperion and review Entergy's prudence Alliance for Affordable Energy and Union of Concerned Scientists (Earthjustice) -
Project Blue AZ
No Desert Data Center Coalition sues Pima County in Superior Court alleging Open Meeting Law violations in the rezoning AZPM -
West Sedgwick County data center land acquisitions KS
County Commission adopts 90-day interim development control on data center applications Sedgwick County -
xAI Colossus 2 TN
Application filed with Mississippi regulators for 41-turbine permit Southern Environmental Law Center -
Cloverleaf, Greenleaf WI
Cloverleaf's chief development officer says in a statement that the company will not pursue data centers in the village of Greenleaf or the Town of Wrightstown Spectrum News 1 (Wisconsin) -
Comanche Circle TX
Commissioners conditionally approve concept plan 4-1, requiring more detail on drainage, wastewater, landscape and power generation KERA News -
Core Scientific Denton Data Center TX
DCD, citing The Information, reports CoreWeave has deployed more than 16,000 GPUs at the delayed Denton facility DatacenterDynamics -
Saline Township Stargate Data Center MI
EGLE issues the air quality permit for 14 diesel backup generators and a diesel firewater pump. Planet Detroit -
AVAIO Digital Leo AR
AVAIO Digital Partners announces the AVAIO Digital Leo data center campus near Little Rock in Pulaski County Arkansas Economic Development Commission -
Cloverleaf, Greenleaf WI
Residents gather for an informational session hosted by LedgeStone Vineyard, located across the street from the proposed site; everyone FOX 11 spoke with opposed a data center FOX 11 (WLUK) -
Cloverleaf, Greenleaf WI
FOX 11 reports Cloverleaf is discontinuing the potential Greenleaf project, based on a post by Town of Wrightstown Supervisor Jesse Juedes FOX 11 (WLUK) -
Cloverleaf, Greenleaf WI
Cloverleaf's chief development officer says the company respects that local leadership does not want data centers and will look elsewhere in Northeast Wisconsin FOX 11 (WLUK) -
Cloverleaf, Village of Wrightstown WI
A Cloverleaf project development manager emails the village administrator that the company has leads that could land it close to the Village of Wrightstown's border, according to emails released under an open records request Wisconsin Public Radio -
Cloverleaf, Village of Wrightstown WI
Cloverleaf is reported to be backing out of a potential project in Greenleaf; the company says it will not pursue data centers in the village of Greenleaf or the Town of Wrightstown (see cloverleaf-greenleaf-brown-county-wi) FOX 11 (WLUK) -
Imperial Data Center CA
Developer sues City of Imperial in federal court after moving project to county land Calexico Chronicle -
Project Horizon TX
Pecos County Commissioners Court agenda includes a tax abatement agreement with CoreWeave, LLC within the Longfellow Renewable Energy Reinvestment Zone Pecos County, Texas -
Wallace Jackson Data Center Campus GA
Variance, rezoning and special exception applications on the agenda of a Spalding County Planning and Appeals Commission special called meeting The Griffin Daily News -
Project Boulder SC
Two landowners, represented by SELC, sue Colleton County over the data center ordinance Southern Environmental Law Center -
QTS DeForest Data Center Campus WI
Wisconsin Department of Administration report finds the annexation not in the public interest The Cap Times -
Project Peninsula MI
The Right Place confirms technology companies are exploring data center development in the region, including in Solon Township FOX 17 West Michigan -
Project Tembo WY
Laramie County commissioners unanimously approve the Project Jade site plans WyoFile -
Old Bermuda Data Center VA
Chesterfield's new data center zoning rules take effect, requiring projects like this one to go before the Board of Supervisors first; the project's site plan had not been approved WWBT 12 On Your Side -
Amazon Web Services Louisa County campuses VA
AWS closes purchase of about 1,920 acres near Northeast Creek Reservoir for about $72 million WVVA -
Little Rock Port data center AR
A source close to the development tells Arkansas Business that Google is the company behind the Little Rock Port project Arkansas Business -
Menomonie Data Center (Balloonist LLC) WI
City council votes unanimously to add regulations on data center projects Next City -
Project Blue AZ
Beale-affiliated Bobcat Tucson Water LLC applies to ADWR for two commercial groundwater wells AZPM -
Project Peninsula MI
Township Planning Commission unanimously approves a 90-day moratorium on data center proposals FOX 17 West Michigan -
Pumpkin Technology Campus GA
Columbia County Planning Commission votes 4-1 to recommend the Pumpkin Center and Byrd Farm data center projects WRDW -
QTS Fayetteville data center campus GA
QTS files plans for 2 million sq ft ATL2 East expansion on 313 acres west of Veterans Parkway DatacenterDynamics -
Stargate Milam County TX
OpenAI and SoftBank each invest $500M in SB Energy, which will build and operate the site DCD -
Wallace Jackson Data Center Campus GA
Developer completes a Development of Regional Impact filing, triggering state infrastructure review The Atlanta Journal-Constitution
2026
-
Eco-Yotta Oneonta Data Center NY
Oneonta Town Board passes a one-year data center moratorium Spectrum News / NY State of Politics -
Global AI Data Center CO
County issues three stop-work orders and a Notice of Violation over unpermitted equipment installation (summer 2026) Colorado Public Radio -
Perry Township Data Center OH
Perry Township trustees and the city of Canton approve the project under a JEDD agreement WHBC -
Perry Township Data Center OH
Developers break ground on the 240-megawatt data center Ideastream Public Media -
Project Delta NC
Thirteen residents and four nonprofit groups sue, alleging improper notice and procedures; commissioners void the rezoning (by April 2026) Spectrum News
Dec 2025
-
CoreWeave Lancaster data center PA
County judge sides with the developers, ruling a resident's appeal of the zoning officer's letters cannot go to the zoning hearing board LancasterOnline -
Hut 8 River Bend Campus LA
Parish president says parish permitting is complete; construction already under way 10/12 Industry Report -
Lake Hawkeye NY
Town of Lansing Zoning Board of Appeals determines that a data center fits the permitted land use at the site Ithaca Times -
Blueprint Taylor Data Center TX
Appeal by residents against NCP Travis TPP Project, LLC is pending before the Fifteenth Court of Appeals CourtListener -
Homer City Energy Campus PA
Clean Air Council, PennFuture and Sierra Club appeal the permit to the Environmental Hearing Board; young residents file a separate appeal Lehigh Daily -
Microsoft Gaines Township data center MI
Planning Commission meeting on rezoning adjourned after overflow crowd DatacenterDynamics -
Project Boulder SC
Board of Zoning Appeals holds hearing on special exception; residents voice opposition, no vote taken Live 5 News (WCSC) -
Saline Township Stargate Data Center MI
MPSC approves DTE contracts with Oracle subsidiary Green Chile Ventures, with conditions Michigan Public Service Commission -
Hut 8 River Bend Campus LA
Hut 8 signs 15-year, 245 MW lease with Fluidstack; state and Entergy announce $10 billion project Louisiana Economic Development -
Port Washington (Lighthouse) Data Center Campus WI
Groundbreaking held as construction begins BizTimes Milwaukee -
Quiet Data Centers, Trestle Road NC
Halifax County enters into an economic development agreement with Quiet Data Centers Halifax Inc. covering a small-scale enterprise data center to be developed at its US 301 industrial site near Enfield Halifax County Board of Commissioners, via RRSpin -
Quiet Data Centers, Trestle Road NC
County executes a land purchase agreement to sell the site to the company for $1.7 million without public bidding Halifax County Board of Commissioners, via RRSpin -
xAI Colossus TN
Memphis and Shelby County Air Pollution Control Board dismisses appeals of the turbine permit as moot Action News 5 -
Project Cannoli MI
Planet Detroit reports a developer pitching a 1-gigawatt data center for Van Buren Township. Planet Detroit -
Port Washington (Lighthouse) Data Center Campus WI
DNR issues WEPA compliance determination, wetland exemptions and stormwater coverage Wisconsin Department of Natural Resources -
Amazon Hobart data center IN
Residents sue the Hobart Plan Commission and Common Council in Lake Superior Court over the rezoning The Indiana Lawyer -
Fermi America Project Matador TX
Fermi America announces electric service agreement with Southwestern Public Service Company for up to 200 MW Fermi America (PR Newswire) -
QTS Cedar Rapids Data Center Campus IA
City Council unanimously approves amended agreement raising anticipated investment to $1.75B Corridor Business Journal -
AWS Project Green MO
AWS answers Montgomery County Commission questions on water use, estimating about 50 million gallons a year at full buildout The Missouri Times -
Fermi America Project Matador TX
Prospective tenant ends letter of intent after exclusivity expires; shares fall DCD -
Google Morgan County Data Center IN
Google details plans for the 550-acre campus and says utilities and foundation work will begin in February WISH-TV -
Imperial Data Center CA
County Planning Commission declines to approve lot merger; developer appeals inewsource -
Pennsylvania Digital 1 (PAX-1) PA
Township planning commission recommends approving plans that would create internal lot lines for the project GovTech (PennLive) -
Project Mila OH
A nearby resident says heavy machinery began breaking ground on the site just before Christmas WCPO -
Pumpkin Technology Campus GA
Piedmont DevCo LLC applies to rezone about 420 acres for the Pumpkin Technology Campus The Augusta Press -
Stafford Technology Campus VA
Board of Supervisors unanimously grandfathers the campus and four other projects under pre-October 2025 rules Fredericksburg Free Press -
Stillwater Technology Park GA
Lovejoy rezones the site to allow potential data center development; Stillwater first files plans Hoodline
Nov 2025
-
AWS Project Green MO
KOMU reports AWS plans a data center near New Florence, with power from Ameren Missouri KOMU 8 -
Wallace Jackson Data Center Campus GA
Spalding County Planning Commission hearing on the data center rezoning is tabled over what the county zoning attorney called a legal issue The Griffin Daily News -
CoreWeave Lancaster data center PA
Lancaster City Council approves $20 million community benefits agreement, 6-1 LancasterOnline -
Howell Township Data Center MI
Howell Township Board unanimously adopts a six-month data center moratorium; it does not cover the pending rezoning request Michigan Advance -
AWS Wilmington data center OH
Wilmington City Schools Board of Education approves the School Compensation Agreement Clinton County Port Authority (Choose Clinton County) -
Howell Township Data Center MI
Livingston County Planning Commission recommends against the rezoning Planet Detroit -
Homer City Energy Campus PA
DEP issues final air quality plan approval 32-00457A Pennsylvania Department of Environmental Protection -
Project Lincoln KY
Fiscal Court approves new moratorium lasting until regulations are approved The Oldham Era -
Project Marvel AL
Bessemer City Council gives final approval to the Project Marvel rezoning DatacenterDynamics -
Goodnight Campus TX
Google announces $40 billion Texas plan including a data center in Armstrong County Texas Tribune -
Farmington Technology Park MN
Dakota County judge denies the city's motion to dismiss City of Farmington -
Amazon Web Services Butts County data center campus GA
Intergovernmental PILOT agreement amended after approval by county commission, school board and development authority; water/sewer funding moved to a separate agreement with the Butts County Water and Sewer Authority Jackson Progress-Argus -
Meta Beaver Dam Data Center WI
Meta and state and local officials announce the $1 billion Beaver Dam data center campus Wisconsin Economic Development Corporation -
Microsoft Fairwater Atlanta GA
Microsoft publicly unveils Fairwater Atlanta as part of its AI superfactory Microsoft -
Project Cardinal Data Center Campus IL
City approves the project via Ordinance No. 2025-78 United City of Yorkville -
Project Horizon TX
Pecos County Commissioners Court agenda includes a tax abatement agreement with Poolside Inc. Pecos County, Texas -
Devlin Technology Park VA
Amazon Data Services closes purchase of land in the park from Stanley Martin Homes Virginia Business -
Google Hermantown Data Center MN
MCEA and Stop the Hermantown Data Center appeal the City of Hermantown's environmental study Minnesota Center for Environmental Advocacy -
Quiet Data Centers, Trestle Road NC
Halifax County Board of Commissioners holds the required public hearing before authorizing the economic development and land purchase agreements Halifax County Board of Commissioners, via RRSpin -
CRG Festus Data Center MO
City annexes 240 acres; Planning & Zoning recommends and council approves rezoning ~370 acres to I-1 industrial Jefferson County Leader -
Lake Hawkeye NY
Tensions over the proposal grow in Tompkins County as opponents threaten litigation The Cornell Daily Sun -
Paducah Site AI campus KY
Energy Department issues a Request for Offers for AI data center and energy development at the Paducah Site U.S. Department of Energy -
Port Washington (Lighthouse) Data Center Campus WI
Port Washington Common Council unanimously approves creation of Tax Incremental District No. 5 for the data center campus WPR -
Project Cherry Blossom MI
Cloverleaf presents the proposal at a public meeting; residents raise water, power and noise concerns FOX 2 Detroit -
Project Mila OH
Trenton City Council votes to create an I-T zoning district, which the city manager says anticipated the data center WVXU -
Viridian Data Center Campus (former GM/JATCO site) WI
Janesville City Council approves a letter of intent with Viridian 5-2 WPR
Oct 2025
-
Port Washington (Lighthouse) Data Center Campus WI
Vantage and Wisconsin Building Trades Council announce labor partnership for $15B+ campus Business Wire -
QTS DeForest Data Center Campus WI
QTS announces plans for a data center campus in Dane County and a $50 million community commitment Spectrum News 1 -
Saline Township Stargate Data Center MI
OpenAI, Oracle and Related Digital announce Stargate site CBS Detroit -
Project Rainier (AWS New Carlisle campus) IN
AWS activates Project Rainier; cluster fully operational with ~500,000 Trainium2 chips Data Center Knowledge -
CloudHQ ORD Campus IL
Village Board takes up an ordinance amending the PUD conditional use and final plat for the Mount Prospect Technology Campus Village of Mount Prospect, IL -
Project Galaxy (AWS Sidney data center) OH
Sidney City Council passes resolution supporting the 30-year tax abatement Dayton Daily News -
Lake Mariner NY
Somerset Planning Board and Town Board unanimously approve expansion on 61 acres Niagara Gazette (via Yahoo Finance) -
Old Elberton Road data center proposal GA
Commissioner Melissa Link calls for a data center moratorium after the denial WUGA -
CyrusOne Sangamon County Data Center IL
Illinois Times reports CyrusOne filed a request for a data center campus in Sangamon County. Illinois Times -
Google Hermantown Data Center MN
Environmental Quality Board receives a petition requesting an Environmental Assessment Worksheet for the project City of Hermantown -
Saline Township Stargate Data Center MI
EGLE issues a permit waiver allowing Related Digital to begin installing generators before the final air permit. Planet Detroit -
Project Horizon TX
Poolside announces Project Horizon with CoreWeave as anchor tenant under a 15-year, 250 MW lease Poolside -
Saline Township Stargate Data Center MI
Consent judgment filed in Washtenaw County Circuit Court allowing project to proceed DatacenterDynamics -
Blueprint Taylor Data Center TX
Judge Ryan Larson of the 395th District Court dismisses neighbors' lawsuit over the parkland deed KUT Radio -
Old Elberton Road data center proposal GA
Athens-Clarke Mayor and Commission unanimously deny the rezoning DatacenterDynamics -
Google West Memphis Data Center AR
Google announces its $4 billion Arkansas investment and first data center in the state Google -
Amazon Web Services Richmond County data center campus NC
Amazon breaks ground on the campus DatacenterDynamics -
CyrusOne Sangamon County Data Center IL
CyrusOne proposal for 280-acre Talkington Township campus becomes public Illinois Times -
Fermi America Project Matador TX
Amarillo City Council votes 4-1 to sell up to 2.5M gallons/day of water ABC 7 Amarillo -
Goodnight Campus TX
Commissioners unanimously approve amended abatement as project is scaled back to 3–4 buildings KFDA NewsChannel 10 -
Google Morgan County Data Center IN
Google confirms it is exploring a development in Morgan County DatacenterDynamics -
Google Palo data center campus IA
Google informs the Linn County Board of Supervisors of plans for a six-building campus on 545 acres Inside Climate News -
Joliet Technology Center IL
Herald-News notes a sign posted in October 2025 gave notice of plans to develop the land. Shaw Local (The Herald-News) -
Project Mila OH
Prologis's purchase of the city-owned industrial park land closes WCPO (Journal-News story by Bryn Dippold) -
QTS Fayetteville data center campus GA
Microsoft Fairwater AI facility opens in first building Atlanta Journal-Constitution -
Sentinel Grove Technology Park FL
Planning and Zoning Commission votes 4-2 to recommend against the proposal WPTV -
Sentinel Grove Technology Park FL
Timberline announces it will temporarily pause the project TCPalm (via AOL) -
Stargate Lordstown OH
Crews begin site preparation along Hallock Young Road The Business Journal (Youngstown)
Sep 2025
-
Microsoft Fairwater Atlanta GA
City issues construction completion certificate Atlanta Journal-Constitution -
QTS Fayetteville data center campus GA
Certificate of completion issued for first building Atlanta Journal-Constitution -
Howell Township Data Center MI
Howell Township Planning Commission unanimously recommends denying the rezoning after a seven-hour meeting Planet Detroit -
Stargate Lordstown OH
OpenAI, Oracle and SoftBank name Lordstown as a Stargate site where SoftBank has broken ground on a data center OpenAI -
Google Franklin Township data center IN
Google announces withdrawal of rezoning petition before expected City-County Council vote WFYI -
Menomonie Data Center (Balloonist LLC) WI
Mayor announces at a council meeting that the city will not move forward with a development agreement Next City -
Microsoft Fairwater WI
Microsoft details Fairwater and commits $4B to a second datacenter Microsoft On the Issues -
Homer City Energy Campus PA
DEP holds a public hearing on the draft air quality plan approval 32-00457A Pennsylvania Department of Environmental Protection -
Menomonie Data Center (Balloonist LLC) WI
Mayor directs the city administrator to contact Balloonist LLC about his decision WPR -
Devlin Technology Park VA
Court of Appeals of Virginia affirms the circuit court judgment Court of Appeals of Virginia -
Wilderness Crossing VA
Circuit court allows four of seven counts in the preservation groups' lawsuit to proceed American Battlefield Trust -
Saline Township Stargate Data Center MI
Related Digital and landowners sue township alleging exclusionary zoning Fortune -
Tooele Valley data center (Burmester Road / I-80) UT
Tooele Valley Project Area Plan Amendment #1 adds 342 acres to the project area. Utah Inland Port Authority -
Project Aggie TX
City Council unanimously votes against the land sale after more than five hours of comment KBTX -
Google Botetourt County Data Center Campus VA
Western Virginia Water Authority board authorizes agreements including one with Google Western Virginia Water Authority -
Google West Memphis Data Center AR
Google confirmed as the company behind the West Memphis project DatacenterDynamics -
Nebius Vineland Data Center NJ
Nebius announces multi-billion-dollar agreement to deliver Vineland capacity to Microsoft Nebius -
Fermi America Project Matador TX
NRC completes acceptance review of the application U.S. Nuclear Regulatory Commission -
Brightseat Tech Park MD
County Executive Aisha Braveboy signs executive order delaying data center approvals until Dec. 31; County Council votes unanimously for a six-month pause The Diamondback -
Compass Statesville NC
Statesville City Council approves the rezoning 8-0 GovTech (The Charlotte Observer) -
Old Elberton Road data center proposal GA
Athens-Clarke Planning Commission unanimously recommends denial of the Employment-Industrial rezoning Now Georgia -
Rowan Digital Infrastructure Temple Campus TX
Temple City Council unanimously approves Rowan's $700 million Bob White Road data center project KBTX -
Saline Township Stargate Data Center MI
Planning commission and township board (4-1) reject rezoning Fortune -
Stargate Lordstown OH
SoftBank affiliate Crescent Dune LLC takes title to the former GM complex and nearly 600 acres The Business Journal (Youngstown)
Aug 2025
-
Polaris Forge 1 ND
CoreWeave signs additional 150 MW lease, bringing Polaris Forge 1 to 400 MW Applied Digital -
Google Chesterfield County data center campuses VA
Google announces Chesterfield data center as part of $9 billion Virginia investment Virginia Business -
Project Blue AZ
Beale and TEP file special power agreement with Arizona Corporation Commission AZ Luminaria -
Project Cumulus MO
City Council unanimously adopts one-year citywide moratorium on data center applications Spectrum News -
Meta Lebanon Data Center IN
City reports planning commission approval of the 1,500-acre, 15-building plan City of Lebanon -
Google Franklin Township data center IN
Metropolitan Development Commission approves rezoning 8-1 Mirror Indy -
Meta Hyperion LA
LPSC approves Entergy Louisiana's three combined-cycle gas plants (~3,000 MW) and transmission for the data center Entergy -
Port Washington (Lighthouse) Data Center Campus WI
Common Council approves Final Development Agreement with Vantage Data Centers City of Port Washington -
Project Cumulus MO
Developer withdraws proposal ahead of City Council vote St. Louis Post-Dispatch (via GovTech) -
Compass Statesville NC
Compass proposes a five-building campus on Stamey Farm Road DatacenterDynamics -
Lake Mariner NY
Fluidstack adds 160 MW CB-5 lease; Google backstop rises to about $3.2 billion TeraWulf -
Galaxy Helios TX
CoreWeave locks in the full 800 MW of approved capacity; Galaxy raises a $1.4 billion project facility Converge Digest -
Ridgeline Facility WV
WVDEP issues air quality construction permit R13-3713 after 1,605 written comments Parsons Advocate -
Lake Mariner NY
TeraWulf signs 200+ MW, 10-year hosting agreements with Fluidstack; Google backstops $1.8 billion TeraWulf -
Joule Energy and Data Center Campus UT
Caterpillar announced to supply generator sets for a 4 GW campus Power Engineering -
AWS Wilmington data center OH
Wilmington City Council approves annexation of the project site Clinton County Port Authority (Choose Clinton County) -
Project Blue AZ
Tucson City Council votes to end annexation negotiations, cutting off Tucson Water AZ Luminaria -
Joule Energy and Data Center Campus UT
Millard County Commission unanimously approves rezoning the parcel from agricultural to heavy industrial use Cleanview -
Amazon Web Services Louisa County campuses VA
A neighboring homeowner and business owner files a private nuisance lawsuit against Amazon over construction impacts Virginia Mercury -
Augusta Township Data Center (Thor Equities) MI
Residents turn in 957 signatures to put the rezoning on the ballot (561 required) Bridge Michigan -
Compass Statesville NC
Statesville Planning Board votes 6-0 to recommend the rezoning GovTech (The Charlotte Observer) -
Highlander SM One data center TX
City Council votes 5-2 in favor but short of required supermajority; request denied Community Impact -
Lake Hawkeye NY
TeraWulf secures a long-term lease at the former Cayuga Power Plant site Ithaca Times -
Prince William Digital Gateway VA
Circuit Court Judge Kimberly Irving voids rezonings over improper public notice Virginia Business
Jul 2025
-
Project Tembo WY
Crusoe and Tallgrass announce a 1.8 GW AI data center in southeast Wyoming Tallgrass -
Augusta Township Data Center (Thor Equities) MI
Township board votes unanimously to conditionally rezone 522 acres for the data center Planet Detroit -
Vantage Frontier Campus TX
Shackelford County Commissioners unanimously approve reinvestment zone and accept Vantage abatement application The Albany News -
xAI Colossus TN
SELC, on behalf of NAACP Memphis and Young, Gifted & Green, appeals permit to Memphis and Shelby County Air Pollution Control Board Tennessee Lookout -
xAI Colossus 2 TN
xAI affiliate MZX Tech buys former Duke power plant site in Southaven, MS Southern Environmental Law Center -
CoreWeave Lancaster data center PA
CoreWeave announces up to $6 billion commitment for Lancaster data center CoreWeave -
Homer City Energy Campus PA
Agreement in principle announced for EQT to supply up to 665,000 MMBtu/day of gas Homer City Redevelopment (via Seeking Alpha) -
Project Spalding GA
Spalding County Board of Commissioners holds a hearing on the application WSB-TV Channel 2 -
Project Lincoln KY
Western Hospitality Partners says project will be withdrawn and will not proceed WAVE / WDRB -
xAI Colossus TN
Shelby County Health Department approves permit for 15 gas turbines through Jan. 1, 2027 (DCD reports July 1 meeting) Tennessee Lookout -
Project Lincoln KY
Fiscal Court passes 150-day moratorium on data centers 4-2 with no exemptions; Deputy Judge-Executive Joe Ender fired over secret recording Louisville Public Media -
Amazon Web Services Louisa County campuses VA
AWS withdraws conditional use permit application for a 7.2 million sq ft third campus on 1,370 acres Virginia Mercury -
Project Mica MO
Port KC approves authorization of $10 billion in taxable revenue bonds for Project Mica KCTV5 -
Project Spalding GA
Spalding County Board of Commissioners approves rezonings and special exceptions with conditions for the campus The Griffin Daily News -
QTS Cedar Rapids Data Center Campus IA
Ground broken (The Gazette; CBJ reports first building groundbreaking in August 2025) The Gazette
Jun 2025
-
Google Botetourt County Data Center Campus VA
Board of Supervisors approves performance agreement; Google's purchase of a 312-acre parcel announced Botetourt County, VA -
Cologix Johnstown Campus OH
Trade report says work on the Johnstown campus is expected to begin later in 2025 Columbus Construction -
Fermi America Project Matador TX
Fermi submits parts 1-2 of NRC Combined License Application for four AP1000 units U.S. Nuclear Regulatory Commission -
Salem Township Innovation Campus PA
Talen and AWS sign a 1,920-MW PPA; the existing 300-MW co-location arrangement moves to a front-of-the-meter framework Utility Dive -
Blueprint Taylor Data Center TX
Planning & Zoning Commission holds public hearing on the Employment Center Plan City of Taylor, TX -
Falls Township Innovation Campus PA
Amazon announces its intent to build a data center in Falls Township as part of a $20 billion Pennsylvania investment Falls Township -
Meta Prometheus OH
Ohio Power Siting Board approves the 200 MW Socrates South gas plant for Meta affiliate Sidecat's campus DCD -
Salem Township Innovation Campus PA
Amazon announces at least $20 billion for data center complexes in Pennsylvania, including the Salem Township site The Philadelphia Inquirer -
Amazon Web Services Richmond County data center campus NC
Gov. Josh Stein announces the $10 billion Amazon investment Axios Raleigh -
Amazon Web Services Richmond County data center campus NC
Richmond County commissioners approve property tax incentive grants Axios Raleigh -
Polaris Forge 1 ND
Applied Digital signs 250 MW of 15-year leases with CoreWeave (~$7 billion) DatacenterDynamics -
Project Lincoln KY
Original application withdrawn; revised proposal filed south of original site DatacenterDynamics -
Project Peninsula MI
Township Supervisor Ellick signs a nondisclosure agreement with Venerly LLC with board approval Cedar Springs Bugle
May 2025
-
Google Chesterfield County data center campuses VA
Chesterfield supervisors approve zoning changes for two of the projects VPM News -
Amazon Becker Data Center MN
Amazon says it is suspending its development activities in Minnesota but will keep the property MPR News -
Farmington Technology Park MN
Metropolitan Council approves the Farmington Technology Park comprehensive plan amendment City of Farmington -
Amazon Web Services Richmond County data center campus NC
County commissioners vote to sell county parcels for $26 million and rezone land to heavy industrial Inside Climate News -
Augusta Township Data Center (Thor Equities) MI
Planning commission recommends denying the rezoning Planet Detroit -
Avemore Data Park GA
Villa Rica approves annexation and rezoning for the data center (reported May 14, 2025) Times-Georgian -
Google Morgan County Data Center IN
County grants Woodland Caribou LLC 10-year tax breaks of up to 50% Indiana Daily Student -
Microsoft Fairwater Atlanta GA
Fayetteville issues certificate of occupancy for the first building on the QTS campus Atlanta Journal-Constitution -
Oakline at Mill Creek OR
The Oregon Department of Administrative Services signs a contract to sell 32.23 acres of land in the Mill Creek Corporate Center, with closing set for October 2026 KATU -
T5 @ Chicago IV IL
Grayslake Village Board completes approvals of the campus (approved between September 2024 and May 2025) Lake and McHenry County Scanner
Apr 2025
-
Amazon Data Services King George campus (former Birchwood power plant site) VA
Amazon files an 878-page petition with the King George County Circuit Court Fredericksburg Free Press -
Balico data center campus and gas plant VA
Board chairman denies withdrawal request; Board of Supervisors votes 6-1 to deny rezoning Cardinal News -
Balico data center campus and gas plant VA
Balico announces it is withdrawing its application and exploring a residential subdivision instead WVTF / Radio IQ -
Blueprint Taylor Data Center TX
Taylor EDC sells the property to the developer for $10,000,000 City of Taylor, TX -
Galaxy Helios TX
Reported that Galaxy signed a 15-year lease with CoreWeave to convert the Helios site, which it bought from Argo Blockchain in 2022 KCBD -
White Oak Technology Park GA
DRI filed for 8M sq ft data center and technology park DatacenterDynamics -
xAI Colossus TN
Aerial imaging shows 35 turbines operating, per SELC Southern Environmental Law Center -
Project Spalding GA
Resident Greg Berns speaks against the proposed data center during citizen comment at a Spalding County Board of Commissioners meeting The Griffin Daily News -
Homer City Energy Campus PA
Homer City Redevelopment and Kiewit announce the natural gas-powered data center campus Homer City Redevelopment -
Avemore Data Park GA
Atlas Development files a Development of Regional Impact for the 428-acre technology and data park DatacenterDynamics -
Little Rock Port data center AR
Little Rock Board of Directors adopts a resolution authorizing a memorandum of understanding with Willowbend Capital LLC for a $1 billion, 300,000-square-foot data center by an unnamed company Arkansas Business -
Project Marvel AL
Nearby residents file a lawsuit in Jefferson County Circuit Court challenging the rezoning WBRC
Mar 2025
-
Project Spalding GA
The Data Center Construction Channel reports that Montana Property Group LLC filed a Development of Regional Impact application with the Georgia Department of Community Affairs for a campus known as Project Spalding The Griffin Daily News -
Amazon Data Services King George campus (former Birchwood power plant site) VA
Board of Zoning Appeals denies Amazon's request for a vested-rights determination Fredericksburg Free Press -
Project Cardinal Data Center Campus IL
Plans for the 14-building campus in Yorkville are reported DatacenterDynamics -
Project Steel Data Center Campus IL
Plans are reported for a 540-acre campus of 24 two-story data center buildings with a combined total of more than 9 million square feet DatacenterDynamics -
Amazon Web Services Richmond County data center campus NC
County drafts confidential purchase agreement with 'Project Blue Marlin' for the site Inside Climate News -
Hut 8 River Bend Campus LA
Hut 8 announces it has secured 592 acres in West Feliciana Parish for River Bend DatacenterDynamics -
Ridgeline Facility WV
Air permit application R13-3713 filed with WVDEP Division of Air Quality West Virginia Department of Environmental Protection, Division of Air Quality -
IREN Sweetwater data center campus TX
IREN signs 600 MW grid connection agreement for Sweetwater 2, bringing the hub to 2 GW IREN -
xAI Colossus TN
xAI announces Colossus 2 expansion at Tulane Road site in Whitehaven Southern Environmental Law Center -
xAI Colossus 2 TN
Expansion announced at Tulane Road site in Whitehaven Southern Environmental Law Center -
Stream Data Centers STAMP Campus NY
Stream's initial STAMP proposal, a 900,000 sq ft facility with around 250MW of capacity, is presented at a public hearing DatacenterDynamics -
Google Morgan County Data Center IN
Terri Moore and another nearby property owner sue for review of the rezoning of the first 390.74 acres Indiana Daily Student -
Highlander SM One data center TX
Planning & Zoning Commission recommends denial of first land use amendment Community Impact -
Project Lincoln KY
Western Hospitality Partners' 600 MW data center proposal announced Louisville Public Media -
Project Mila OH
Trenton's planning commission approves updates to three zoning code ordinances to allow data centers, at the request of a Prologis representative WCPO (Journal-News story by Bryn Dippold) -
Valara Holdings High Performance Compute Center SC
Project becomes public as Spartanburg County begins negotiating tax incentives SC Daily Gazette
Feb 2025
-
Amazon Becker Data Center MN
Minnesota PUC rules the backup generators require a Certificate of Need American Public Power Association -
Core Scientific Denton Data Center TX
Core Scientific and CoreWeave announce a $1.2 billion expansion adding 70 MW of contracted power at Denton Core Scientific -
QTS Cedar Rapids Data Center Campus IA
City, Alliant Energy and QTS announce campus City of Cedar Rapids -
Stargate Abilene TX
Taylor County commissioners vote on preliminary tax agreement for Lancium site amid resident concerns KTXS -
Quantum Frederick MD
Aligned breaks ground on a 72 MW data center within the campus DatacenterDynamics -
Project Borealis AZ
City staff confirm the project, a permitted use in the Light Industrial district, does not have to go to the City Council ABC15 / Phoenix Business Journal -
CoreWeave Lancaster data center PA
City zoning officer classifies both data centers as a permitted wholesale trade and storage use Government Technology -
Project Jupiter NM
New Mexico's governor and BorderPlex Digital Assets announce a memorandum of understanding for the Santa Teresa campus. Albuquerque Journal -
Project Marvel AL
City officials sign a non-disclosure agreement with the developer (later amended Feb. 2026) WBHM / Inside Climate News
Jan 2025
-
Quantum Frederick MD
MDE issues permit-to-construct for Aligned's emergency generators Maryland Department of the Environment -
QTS Cedar Rapids Data Center Campus IA
Cedar Rapids City Council approves development agreement with QTS City of Cedar Rapids -
PowerCampus Dallas TX
Texas accessibility filing registered for interior improvements to the 270,900 sq ft Building 1 shell, estimated at $214.3 million Texas Department of Licensing and Regulation -
Farmington Technology Park MN
Castle Rock Township sues Farmington, saying the city breached an Orderly Annexation Agreement Blandin on Broadband (citing Sun This Week) -
Project Horizon TX
Pecos County establishes the Longfellow Renewable Energy Reinvestment Zone Pecos County, Texas -
AWS Fayette County Data Center Campus OH
AWS selects Jefferson Township as its first data center location outside the Columbus region, with a $5 billion commitment through 2030 Ohio Tech News -
Amazon Web Services Butts County data center campus GA
AWS announces at least $11 billion investment in Butts and Douglas counties Amazon -
Balico data center campus and gas plant VA
Planning Commission unanimously recommends denial after five-hour hearing Virginia Business -
Avemore Data Park GA
Villa Rica City Council approves a technology park overlay district, 4-1 Times-Georgian -
Port Washington (Lighthouse) Data Center Campus WI
Port Washington city officials discuss a potential data center development with Cloverleaf Infrastructure. The Daily Reporter -
Project Borealis AZ
Mesa Planning and Zoning Board approves the project ABC15 / Phoenix Business Journal -
Stafford Technology Campus VA
Stafford Technology LC sells the roughly 500-acre property for $302.3 million to an entity representing Stack Infrastructure Fredericksburg Free Press
2025
-
Menomonie Data Center (Balloonist LLC) WI
City council annexes and rezones about 320 acres of farmland for the project WPR -
New Hill Digital Campus NC
Natelli Investments files land use amendment, rezoning and annexation requests with the Town of Apex INDY Week -
Pennsylvania Digital 1 (PAX-1) PA
Carlisle Development Partners acquires the site for $44 million GovTech (PennLive) -
Project Boulder SC
County Council approves text amendment allowing data centers in Rural Development zone by special exception (fall 2025) WCBD News 2 -
Project Camellia GA
OpenAI first contacts Effingham Industrial Development Authority (fall 2025) The Current -
Project Cherry Blossom MI
ProMedica sells the 275-acre former golf course site to the township DatacenterDynamics -
QTS York County Data Center Campus SC
QTS purchases a second 400 acres nearby with no announced plans SC Daily Gazette -
Stream Data Centers STAMP Campus NY
Stream wins approval for its initial project, later canceling those plans following a lawsuit from the Tonawanda Seneca Nation Investigative Post
Dec 2024
-
Amazon Becker Data Center MN
Amazon asks the Minnesota PUC to exempt its backup generators from Certificate of Need requirements (Docket PT7151/CN-24-435) CURE -
Farmington Technology Park MN
Residents organized as the Coalition for Responsible Data Center Development sue the city Minnesota Star Tribune -
Polaris Forge 1 ND
Applied Digital petitions to annex the data center into the city of Ellendale North Dakota Monitor -
Farmington Technology Park MN
Council approves the development agreement with Tract, 4-1 Minnesota Star Tribune -
AWS Fayette County Data Center Campus OH
Amazon Data Services, Inc. buys 589.843 acres in Jefferson Township, paying just over $102 million DatacenterDynamics
Nov 2024
-
Google Botetourt County Data Center Campus VA
Board of Supervisors and Planning Commission amend zoning ordinance to permit data centers in the RAM district Botetourt County, VA -
AWS Fayette County Data Center Campus OH
AWS confirms it filed documents while exploring the Midwest Mega Commerce Center site in Jefferson Township DatacenterDynamics -
Cologix Johnstown Campus OH
Local television reports the campus location in Johnstown, Licking County, and the 154-acre size WSYX / ABC 6 (myfox28columbus.com) -
Cologix Johnstown Campus OH
Cologix announces a $7 billion, eight-building campus of up to 800 MW on 154 acres in Johnstown POWER Magazine -
Farmington Technology Park MN
City Council approves Tract's Final Plat (Resolution 2024-109) and adopts the PUD as Ordinance 2024-12 City of Farmington -
Goodnight Campus TX
Armstrong County Commissioners Court holds reinvestment zone hearing and considers tax abatements for Crusoe Energy Systems LLC / GN DC1 LLC Armstrong County, Texas -
Farmington Technology Park MN
Council approves rezoning, comprehensive plan amendment, AUAR adoption and preliminary plat/PUD City of Farmington -
Salem Township Innovation Campus PA
FERC rejects an amended interconnection agreement that would have raised the behind-the-meter connection to 480 MW from 300 MW Utility Dive -
Balico data center campus and gas plant VA
Original 2,200-acre application withdrawn; scaled-back plan to be resubmitted Data Center Dynamics -
Core Scientific Denton Data Center TX
Denton City Council approves measures allowing conversion and expansion of the Jim Christal Road facility, with roughly $6.1 billion in real property investment and a 78-acre footprint The Dallas Morning News -
Microsoft Gaines Township data center MI
Microsoft buys a 40.5-acre parcel at 7147 Patterson Ave. SE for $9.7 million Crain's Grand Rapids Business
Oct 2024
-
Amazon Becker Data Center MN
Amazon Data Services closes on the 348-acre site for $73.56 million Minnesota Star Tribune -
Spring Valley Technology Park VA
Active Infrastructure plans 3.5M sq ft fuel-cell-powered campus on Evergreen Mills Road DatacenterDynamics -
Lake Mariner NY
TeraWulf plans AI buildings; Niagara County Planning Board review and town hearing scheduled Lockport Union-Sun & Journal (via GovTech) -
Balico data center campus and gas plant VA
Balico files original rezoning application Virginia Conservation Network -
Goodnight Campus TX
Co-location application filed with Texas regulators under SB 6 rules Latitude Media -
Microsoft Mega Park NC
Person County announces Microsoft has purchased 1,350 acres in Woodsdale Township The Assembly
Sep 2024
-
Microsoft Mega Park NC
At a commissioners meeting, the county's economic development director confirms the county signed nondisclosure agreements with the prospective buyer The Assembly -
Stafford Technology Campus VA
Board of Supervisors approves the rezoning 6-1 Fredericksburg Free Press -
Amazon Web Services Madison County Mega Site campus MS
Site work and building pad construction under way at the Madison County campuses Magnolia Tribune -
Quantum Frederick MD
TPG sues Quantum Loophole; settlement in Dec. 2024 removes Quantum Loophole as manager, and TPG/Catellus take over Data Center Frontier
Aug 2024
-
Microsoft Gaines Township data center MI
Microsoft buys about 316 acres in Gaines Township (confirmed October 2024) FOX 17 -
Sentinel / Green Fig Data Center PA
Board of Supervisors grants final land development approval (Resolution 30-2024) East Whiteland Township -
Project Borealis AZ
Mesa Design Review Board hears the plan under the name Project Borealis and takes no action, giving the applicant feedback ABC15 / Phoenix Business Journal -
Project Rainier (AWS New Carlisle campus) IN
St. Joseph County Council approves tax abatement, 7-2 DatacenterDynamics -
Blueprint Taylor Data Center TX
City Council authorizes a Chapter 380 Economic Development Agreement with BPP Projects LLC City of Taylor, TX -
Blueprint Taylor Data Center TX
Taylor EDC approves agreement with BPP Projects LLC City of Taylor, TX -
Core Scientific Denton Data Center TX
Denton City Council votes 5-0 to amend Core Scientific's power purchase agreement and lease to allow high-performance computing for AI KERA News -
Stafford Technology Campus VA
Supervisors defer vote on the rezoning after a late proffer statement Fredericksburg Free Press
Jul 2024
-
xAI Colossus TN
Elon Musk says on X that the 100,000-H100 Colossus cluster is online in Memphis, built in 122 days (company claim as reported by Converge Digest on Sep 2, 2024; the Census found no primary record for the Sept 2024 start date seen elsewhere) Converge Digest -
Ridgeline Facility WV
Purchase and sale agreement for 291-acre site with Western Pocahontas Properties West Virginia Watch -
Amazon Web Services Louisa County campuses VA
Pre-construction meeting for Lake Anna Technology Campus; land disturbance permit issued Lake Anna Life -
Meta Cheyenne Data Center WY
Meta unveils the $800 million Project Cosmo data center Wyoming Tribune Eagle
Jun 2024
-
Quantum Frederick MD
Maryland Department of the Environment rescinds a $130,000 settlement offer over fiber-ring construction violations and refers the matter to the Attorney General Inside Towers -
Sentinel / Green Fig Data Center PA
Board of Supervisors grants preliminary land development approval (Resolution 26-2024). East Whiteland Township -
Devlin Technology Park VA
Prince William County Circuit Court dismisses the residents' lawsuit Prince William Times -
xAI Colossus TN
xAI announces 'world's largest supercomputer' in Memphis and begins installing gas turbines Southern Environmental Law Center -
QTS Augusta Data Center Campus GA
Augusta Planning Commission unanimously recommends rezoning the 165.21-acre parcel at 2883 Gordon Highway The Augusta Press -
PowerCampus Dallas TX
Construction begins on the first building, estimated at about $85 million in state planning documents Corgan -
QTS Augusta Data Center Campus GA
Eagle South LLC and landowner Vitrified Brick & Clay Co. receive county approval for the expanded development The Augusta Press -
Viridian Data Center Campus (former GM/JATCO site) WI
City of Janesville begins discussions with Viridian Partners on redeveloping the former GM site The Gazette (gazettextra.com)
May 2024
-
Microsoft Mega Park NC
Person County's economic development liaison starts an email thread under the subject line 'Project Energy', according to The Assembly The Assembly -
Meta Cheyenne Data Center WY
Cowboy State Daily reports Meta is behind the Project Cosmo data center in south Cheyenne Cowboy State Daily
Apr 2024
-
Project Rainier (AWS New Carlisle campus) IN
Indiana governor announces AWS $11 billion data center campus near New Carlisle Indiana Economic Development Corporation -
Farmington Technology Park MN
City Council approves annexation of the site (state order April 24, 2024) City of Farmington -
Amazon Becker Data Center MN
Elk River Technologies buys the site from Xcel Energy for $7.97 million Minnesota Star Tribune -
Amazon Data Services King George campus (former Birchwood power plant site) VA
Supervisors unanimously ask the Planning Commission to reconsider the rezoning of more than 500 acres Fredericksburg Free Press -
Google Fort Wayne data center IN
Plans for the data center, known as Project Zodiac, are revealed DatacenterDynamics -
Project Mila OH
Prologis and the City of Trenton sign a purchase agreement for the land, listed at $55,000 per acre (about $7.7 million for 141 acres) WCPO (Journal-News story by Bryn Dippold) -
QTS Richmond campus expansion (RIC4 and RIC5) VA
QTS buys the RIC4 land from the Henrico Economic Development Authority for $43.8 million Richmond BizSense
Mar 2024
-
Tooele Valley data center (Burmester Road / I-80) UT
UIPA board unanimously creates the Tooele Valley Public Infrastructure District (Resolution 2024-04). Utah Inland Port Authority -
Google Kansas City Data Center (Hunt Midwest Business Center) MO
Google announces a $1 billion data center in Kansas City's Northland KSHB 41 -
Farmington Technology Park MN
City of Farmington EDA funds two AUAR environmental reviews and Council contracts a consultant for the data center development. City of Farmington -
Meta Rosemount Data Center MN
Governor Walz announces Meta will build an $800 million data center in Rosemount Office of Governor Tim Walz -
Brightseat Tech Park MD
Prince George's County Planning Board unanimously approves Lerner's application to develop data centers on the site DatacenterDynamics -
Google Kansas City Data Center (Hunt Midwest Business Center) MO
Google breaks ground on the data center east of Interstate 435 near Worlds of Fun KSHB 41 -
Meta Rosemount Data Center MN
Initial site work to begin, with foundation building in late summer or early fall, per an official quoted MPR News -
QTS Augusta Data Center Campus GA
Eagle South LLC files a state Development of Regional Impact application for an expanded campus called Project Eisenhower DatacenterDynamics -
Remington Site Data Center NY
Remington Arms closes the Ilion factory, which employed about 300 people; the property is later sold to Turin Hoefler Avenue LLC DatacenterDynamics -
Salem Township Innovation Campus PA
Amazon pays Talen Energy $650 million for its Cumulus data center campus Times Leader
Feb 2024
-
Menomonie Data Center (Balloonist LLC) WI
Menomonie's city administrator signs a nondisclosure agreement with Balloonist Next City
Jan 2024
-
Blueprint Taylor Data Center TX
Taylor City Council discusses the Blueprint data center project and incentives in executive session (no action). City of Taylor, TX -
Amazon Data Services King George campus (former Birchwood power plant site) VA
New board majority reverses the county's commitment GovTech (Richmond Times-Dispatch) -
Amazon Web Services Madison County Mega Site campus MS
AWS confirmed as company behind $10 billion 'Project Atlas' in Madison County; Legislature passes incentive package DatacenterDynamics
2024
-
Meta Lebanon Data Center IN
Lebanon City Council approves tax abatements for the project (codename Project Domino) City of Lebanon
Dec 2023
-
Amazon Data Services King George campus (former Birchwood power plant site) VA
Board approves the performance agreement; Amazon buys the property for almost $169 million GovTech (Richmond Times-Dispatch) -
Compass Datacenters Goodyear Campus AZ
Contractor Sundt marks completion of Building 3 on the campus Sundt Construction -
Tooele Valley data center (Burmester Road / I-80) UT
Utah Inland Port Authority board approves creation of the Tooele Valley Project Area and adopts its plan. Utah Inland Port Authority -
Google Fort Wayne data center IN
Allen County Commissioners vote 3-0 to approve annexation of 728 acres 21Alive (WPTA) -
Prince William Digital Gateway VA
Board of County Supervisors approves rezonings after marathon public hearing Virginia Business -
Remington Site Data Center NY
Remington announces it will close the Ilion plant, ending more than two centuries of arms manufacturing in the village WAMC Northeast Public Radio
Nov 2023
-
Devlin Technology Park VA
Board of County Supervisors approves the rezoning in a lame-duck vote, over opposition from Bristow residents Prince William Times -
Meta Rosemount Data Center MN
Rosemount Planning Commission unanimously approves the PUD final site and building plan for the Meta campus Sun ThisWeek (hometownsource.com) -
PowerCampus Dallas TX
Skybox and Bandera Ventures announce PowerCampus Dallas in Lancaster Data Center Frontier -
Amazon Data Services King George campus (former Birchwood power plant site) VA
County staff report on proposed $6 billion performance agreement with Amazon Data Services presented to Board of Supervisors King George County
Oct 2023
-
Quantum Frederick MD
Maryland PSC grants Aligned provisional authorization for up to 70 MW of diesel backup generation, denying exemption for the full build-out Maryland Public Service Commission
Sep 2023
-
QTS York County Data Center Campus SC
Governor's office announces QTS's $1 billion York County campus Office of S.C. Governor Henry McMaster
Aug 2023
-
Brightseat Tech Park MD
Reports say Lerner has filed a natural resources inventory for the former Landover Mall site, a first step toward a data center, while the site competes for the FBI headquarters NBC4 Washington -
Amazon Web Services Louisa County campuses VA
AWS announces plan for two campuses in Louisa County, $11 billion by 2040 DatacenterDynamics -
Project Borealis AZ
Novva wins a state land auction for about 165 acres in southeast Mesa with a $62.7 million bid ABC15 / Phoenix Business Journal
Jun 2023
-
Microsoft Fairwater Atlanta GA
Fayetteville City Council unanimously adopts development agreement with National Acquisition Company, LLC for the QTS data center The Citizen -
Polaris Forge 1 ND
North Dakota Public Service Commission unanimously approves Montana-Dakota Utilities' electric service agreement to serve Applied Digital's data center near Ellendale MDU Resources (PR Newswire)
May 2023
-
Prime Phoenix Campus AZ
Prime announces a five-building, 66.5-acre campus in Avondale Prime Data Centers -
Wilderness Crossing VA
American Battlefield Trust and allied groups file a legal challenge in Orange County Circuit Court American Battlefield Trust
Apr 2023
-
Wilderness Crossing VA
Orange County Board of Supervisors approves the rezoning 4-1 The Piedmont Environmental Council -
WF Industrial Yaphank Data Center NY
Brookhaven IDA approves benefits for Wildflower's $162 million Brookhaven Logistics Center, three industrial buildings totaling about 550,000 sq ft west of Sills Road on the LIE north service road Long Island Business News, via Wildflower Ltd
Mar 2023
-
Microsoft Fairwater WI
Village of Mount Pleasant approves purchase and sale, development and implementation agreements with Microsoft for about 315 acres in TID 5 Village of Mount Pleasant (via Urban Milwaukee) -
Amazon Web Services Warrenton Data Center VA
Citizens for Fauquier County and 10 residents sue in Fauquier Circuit Court to stop the data center Data Center Dynamics
Feb 2023
-
Amazon Web Services Warrenton Data Center VA
Warrenton Town Council approves Amazon Data Services' special use permit 4-3 Data Center Dynamics
2023
-
Monarch Compute Campus WV
State approves $62.5 million forgivable loan to affiliate Mountaineer GigaSystem LLC for a project originally planned around hydrogen production Charleston Gazette-Mail
Nov 2022
-
CloudHQ ORD Campus IL
Village Board takes up a resolution recommending future renewal of the Class 6B classification for the Mount Prospect Technology Campus Village of Mount Prospect, IL -
Prince William Digital Gateway VA
Board of County Supervisors adopts the comprehensive plan amendment for the Digital Gateway area Potomac Local
Sep 2022
Aug 2022
-
CloudHQ ORD Campus IL
CloudHQ breaks ground; ComEd says construction is underway on the first phase DatacenterDynamics -
Microsoft Fairwater Atlanta GA
QTS buys about 600 acres in Fayetteville for $153.8 million for a planned 250 MW campus DatacenterDynamics -
QTS Fayetteville data center campus GA
QTS confirmed as buyer of about 600 acres for $153.8 million for a 250 MW campus DatacenterDynamics
Jun 2022
-
CloudHQ ORD Campus IL
Village Board holds the first reading of an ordinance approving a conditional use for the final planned unit development, along with the final plat Village of Mount Prospect, IL
2022
-
QTS Augusta Data Center Campus GA
T5 Data Centers wins rezoning of the property to General Business (B-2) for a smaller data center The Augusta Press
Dec 2021
-
CloudHQ ORD Campus IL
Mount Prospect Village Board takes up a first reading of an ordinance granting a preliminary plat and conditional use, and a resolution supporting a Class 6b tax classification application Village of Mount Prospect, IL
Sep 2021
-
Amazon Web Services Warrenton Data Center VA
AWS buys a 41.7-acre site on Blackwell Road for $39.7 million Data Center Dynamics
Jul 2021
Jun 2021
-
Quantum Frederick MD
Maryland Commerce announces Quantum Loophole's plan for a 2,100-acre data center campus at the former Eastalco site Maryland Department of Commerce
Mar 2021
-
Wilderness Crossing VA
KEG Associates III submits the Wilderness Crossing application The Piedmont Environmental Council
2021
-
CloudHQ ORD Campus IL
CloudHQ acquires the site, planning to demolish large parts of the former airline campus and build three data center buildings DatacenterDynamics
2020
-
Prometheus Hyperscale Evanston Campus WY
The company initially planned a 120 MW campus on the site DatacenterDynamics
Jul 2019
-
Compass Datacenters Goodyear Campus AZ
Compass announces that construction has started on the campus's first two data centers Compass Datacenters -
Compass Datacenters Goodyear Campus AZ
Goodyear City Council unanimously approves an agreement for the 225-acre Compass campus Greater Phoenix Economic Council (GPEC)
Mar 2019
-
Compass Datacenters Goodyear Campus AZ
City of Goodyear agrees to rezone Compass's land from light industrial to light industrial park DatacenterDynamics
Jan 2019
-
Compass Datacenters Goodyear Campus AZ
Data Center Frontier reports Compass has quietly acquired more than 200 acres in Goodyear, Arizona. Data Center Frontier -
Compass Datacenters Goodyear Campus AZ
Data Center Frontier reports that Compass Datacenters has acquired more than 200 acres in Goodyear Data Center Frontier
2019
-
Riverview Innovation & Technology Campus NY
Jon Williams and John Yensan acquire the former Tonawanda Coke site at auction DatacenterDynamics
Feb 2018
-
Sentinel / Green Fig Data Center PA
Zoning Hearing Board decision permits data center use East Whiteland Township
2017
-
North Country Colocation Services Massena Expansion NY
NCCS begins operating at the Reynolds industrial site in Massena, on about 110 acres DatacenterDynamics
2016
-
Project Tango FL
Central Park Commerce Center receives initial approvals that include data center buildings WPTV
Aug 2014
-
Utah Data Center UT
Bluffdale records show the facility's monthly water usage peaked at 6.6 million gallons The Salt Lake Tribune
Oct 2013
-
Utah Data Center UT
NSA says failures that occurred during testing have been mitigated, after reports of electrical surges NPR
Mar 2011
-
Utah Data Center UT
Bluffdale City Council unanimously adopts annexation plan encompassing the data center and Camp Williams The Salt Lake Tribune
Jan 2011
Mar 2010
-
Utah Data Center UT
Utah Military Installation Development Authority (MIDA) creates the Utah Data Center Project Area Military Installation Development Authority (MIDA)
1999
-
Blueprint Taylor Data Center TX
Bonnibel Bland Cromwell and relatives convey the roughly 87-acre tract to the Texas Parks and Recreation Foundation Texas Scorecard