Prime Phoenix Campus
Avondale, AZDeveloper: Prime Data Centers
Also known as Prime Phoenix
- Rumored
- Proposed
- Approved
- Under construction
- Operating
Follow this project
New dated changes arrive in your feed reader or calendar. No account, no email address, no tracking.
- RSS feed for any feed reader
- Atom feed
- Hearings calendar (.ics, subscribes in Apple, Google or Outlook Calendar)
Prime Data Centers is building a five-building hyperscale data center campus in Avondale; at full build-out it will cover 66.5 acres and 1.3 million square feet, with 240MW of total critical power. In May 2026 Prime broke ground on the first three buildings, each a 267,000 square-foot facility delivering 48MW of critical IT load, and a leading hyperscaler has secured Buildings 1–3. The campus is powered by a dedicated on-site substation and uses a closed-loop cooling system designed to use no process water during operations.
- Site size
- 66.5 acres[2]
- Permanent jobs (promised)
- 150
- around
Key facts
Size & schedule
| Planned capacity | 240 MW [2] total critical power at full build-out Source excerpt“the campus, which will ultimately span 66.5 acres, 1.3 million square feet and 240MW of total critical power across five hyperscale data centers” |
|---|---|
| Planned capacity | 210 MW [1] differing figure: critical power stated at the May 2023 announcement Source excerpt“Prime Phoenix will feature 210 megawatts of critical power and 1.3 million square feet of space.” |
| Phase 1 capacity | 144 MW [3] critical IT load across first three buildings Source excerpt“48MW of critical IT load, for a combined 144MW in the opening phase” |
| Site size | 66.5 acres [2]Source excerpt“the campus, which will ultimately span 66.5 acres, 1.3 million square feet and 240MW of total critical power across five hyperscale data centers” |
| Floor area | 1.3 million sq ft [2]Source excerpt“the campus, which will ultimately span 66.5 acres, 1.3 million square feet and 240MW of total critical power across five hyperscale data centers” |
| Buildings | 5 [2]Source excerpt“the campus, which will ultimately span 66.5 acres, 1.3 million square feet and 240MW of total critical power across five hyperscale data centers” |
| Stated investment | $3 billion [2] more than $3 billion by Prime; release says customers invest an average 2x more |
| Permanent jobs (promised) | 150 [4] around Source excerpt“Around 150 high-tech, well-paid jobs will also be created.” |
How big is that? Data center sizes compared with football fields and Central Park.
Power
| Power supply | Dedicated on-site substation [2] |
|---|---|
| Power supply | 250MW substation, Phase 1 commissioned [3]Source excerpt“Phase 1 of the campus's 250MW substation has already been commissioned.” |
Water
| Cooling | closed-loop cooling engineered for zero process water use during operations [2] |
|---|
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Water and power
Water
Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.
Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →
Timeline
Sources
- Prime Announces First Phoenix Data Center CampusPrime Data Centers · May 4, 2023 · company
- Prime Data Centers Breaks Ground on Three Buildings at its 240MW Campus in Phoenix, Advancing $3B Investment in AvondalePrime Data Centers · May 21, 2026 · company
- Prime Data Centers Breaks Ground on Three Buildings in PhoenixConstructConnect · May 26, 2026 · news
- Avondale is getting its first data center. Here's what you need to know12News · news
Cite this page
Last updated Nov 5, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Prime Phoenix Campus. Retrieved from https://datacentercensus.com/dc/prime-phoenix-avondale-az |
|---|---|
| MLA | “Prime Phoenix Campus.” Data Center Census, Nov 5, 2026, https://datacentercensus.com/dc/prime-phoenix-avondale-az. |
| Link | https://datacentercensus.com/dc/prime-phoenix-avondale-az |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.