Prime Phoenix Campus

Avondale, AZDeveloper: Prime Data Centers

Also known as Prime Phoenix

Under constructionGround broken on first three buildings in May 2026
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

Prime Data Centers is building a five-building hyperscale data center campus in Avondale; at full build-out it will cover 66.5 acres and 1.3 million square feet, with 240MW of total critical power. In May 2026 Prime broke ground on the first three buildings, each a 267,000 square-foot facility delivering 48MW of critical IT load, and a leading hyperscaler has secured Buildings 1–3. The campus is powered by a dedicated on-site substation and uses a closed-loop cooling system designed to use no process water during operations.

Planned capacity
240 MW[2]
total critical power at full build-out
Site size
66.5 acres[2]
Permanent jobs (promised)
150
around

Key facts

Size & schedule

Planned capacity240 MW [2]
total critical power at full build-out
Source excerpt
“the campus, which will ultimately span 66.5 acres, 1.3 million square feet and 240MW of total critical power across five hyperscale data centers”
Planned capacity210 MW [1]
differing figure: critical power stated at the May 2023 announcement
Source excerpt
“Prime Phoenix will feature 210 megawatts of critical power and 1.3 million square feet of space.”
Phase 1 capacity144 MW [3]
critical IT load across first three buildings
Source excerpt
“48MW of critical IT load, for a combined 144MW in the opening phase”
Site size66.5 acres [2]
Source excerpt
“the campus, which will ultimately span 66.5 acres, 1.3 million square feet and 240MW of total critical power across five hyperscale data centers”
Floor area1.3 million sq ft [2]
Source excerpt
“the campus, which will ultimately span 66.5 acres, 1.3 million square feet and 240MW of total critical power across five hyperscale data centers”
Buildings5 [2]
Source excerpt
“the campus, which will ultimately span 66.5 acres, 1.3 million square feet and 240MW of total critical power across five hyperscale data centers”
Stated investment$3 billion [2]
more than $3 billion by Prime; release says customers invest an average 2x more
Permanent jobs (promised)150 [4]
around
Source excerpt
“Around 150 high-tech, well-paid jobs will also be created.”

How big is that? Data center sizes compared with football fields and Central Park.

Power

Power supplyDedicated on-site substation [2]
Power supply250MW substation, Phase 1 commissioned [3]
Source excerpt
“Phase 1 of the campus's 250MW substation has already been commissioned.”

Water

Coolingclosed-loop cooling engineered for zero process water use during operations [2]

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Planned capacity240 MW [2]
Phase 1 capacity144 MW [3]
Power supplyDedicated on-site substation [2]

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Timeline

  1. Prime announces a five-building, 66.5-acre campus in Avondale [1]

  2. Prime breaks ground on three buildings; Buildings 1–3 secured by a leading hyperscaler [2]

Sources

  1. Prime Announces First Phoenix Data Center Campus
    Prime Data Centers · May 4, 2023 · company
  2. Prime Data Centers Breaks Ground on Three Buildings at its 240MW Campus in Phoenix, Advancing $3B Investment in Avondale
    Prime Data Centers · May 21, 2026 · company
  3. Prime Data Centers Breaks Ground on Three Buildings in Phoenix
    ConstructConnect · May 26, 2026 · news
  4. Avondale is getting its first data center. Here's what you need to know
    12News · news

Cite this page

Last updated Nov 5, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Prime Phoenix Campus. Retrieved from https://datacentercensus.com/dc/prime-phoenix-avondale-az
MLA“Prime Phoenix Campus.” Data Center Census, Nov 5, 2026, https://datacentercensus.com/dc/prime-phoenix-avondale-az.
Linkhttps://datacentercensus.com/dc/prime-phoenix-avondale-az

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.