Data center jobs: pay, where they are, and how many are created

Tracker data as of Nov 6, 2026 · federal wage data, state audits and every jobs promise in the Census

Short answer

Data centers create many construction jobs but relatively few permanent ones. Virginia’s legislative auditors report that a typical 250,000-square-foot facility may have about 50 full-time workers, about half of them contractors, while about 1,500 workers are on site at the height of construction[1]. Pay for the core occupations ranges from about $38,000 for security guards to about $99,000 for network and systems administrators (May 2025 federal medians)[3][4].

full-time workers at a typical 250,000 sq ft data center, per JLARC[1]
~50
workers on site at the peak of construction, per JLARC[1]
~1,500
U.S. jobs in data processing and hosting (NAICS 518), August 2026, preliminary[2]
453,300

Data center technician salary and pay by role

Federal wage statistics don’t have a separate category for “data center technician.” The work is split across several occupations, from network support and systems administration to the electricians and HVAC mechanics who keep power and cooling running, so the table below shows national median pay for the occupations data centers commonly hire, from the Bureau of Labor Statistics (May 2025). Data center technician: the job, the pay and how to get one covers the duties, shifts, certifications and training programs.

OccupationSOC codeMedian annual pay
Network and computer systems administrators15-1244$99,130[4]
Computer network support specialists15-1231$76,220[5]
Industrial machinery mechanics, maintenance workers and millwrights49-904x$64,100[6]
Electricians47-2111$63,190[7]
Computer user support specialists15-1232$61,860[5]
HVAC and refrigeration mechanics and installers49-9021$61,010[8]
Security guards33-9032$38,020[3]

Electricians and the trades. The largest hiring on a data center site is electrical: power distribution, switchgear, generators and the substation work that connects a campus to the grid. BLS puts the median wage for electricians at $63,190 a year (May 2025), across 821,000 jobs[7], and says AI and demand for data centers are expected to contribute to rising electricity demand in its outlook for the trade[7]. Most of that work is done by contractors hired by the project’s builder rather than by the data center operator, so openings appear with electrical contractors and unions in the area, not only with the company whose name is on the building.

For where these jobs are, see jobs by state below. BLS says AI and data center demand are expected to contribute to rising electricity demand in its outlook for electricians[7], and that commercial construction including data centers will drive job growth for HVAC mechanics[8]. Within the data processing and hosting industry, BLS estimated a median wage of $49.20 an hour and an annual mean of $116,230 across all occupations in May 2023[9].

How many jobs does a data center create?

Construction is where most of the jobs are. JLARC reports, based on data center representatives, that about 1,500 workers are on site at the height of building a data center, which usually takes 12 to 18 months[1], while a typical 250,000-square-foot facility may then have about 50 full-time workers, roughly half of them contractors[1]. Georgia’s 2022 tax incentive evaluation modeled a hypothetical $800 million data center with 50 employees, versus about 4,200 construction jobs over two years[10].

Statewide totals can still be large. JLARC estimated Virginia’s data centers directly supported over 8,000 full-time jobs in fiscal 2023[11], with employees and contractors earning about $100,000 a year on average[11], and the industry contributing 74,000 jobs to the state economy, mostly from construction[1]. Georgia projected 1,873 permanent full-time data center jobs in 2025[12].

Jobs and tax incentives

Official evaluations have weighed jobs against tax breaks. JLARC found Virginia’s exemption returned 48 cents in state revenue per dollar and added 84 jobs per $1 million spent, compared with 58 for the average Virginia incentive[11], while saving data centers $928 million in fiscal 2023[1]. Georgia’s 2025 evaluation estimated 30% of data center activity in the state was attributable to its incentive[12], with forgone state revenue of $474.2 million in fiscal 2025[13].

Industry figures run higher. A study commissioned by the Data Center Coalition and prepared by PwC says the U.S. industry directly employed 1,005,080 people in 2024 under its own definition, and that each direct job supports more than 4.5 others[14].

Data center jobs by state

Construction hiring follows the projects that are actually being built, and permanent hiring follows the ones that open. The table below shows, by state, the tracked projects now under construction, the permanent jobs their developers or officials have announced, and how many projects publish a construction figure. Hiring is done by each project’s developer, operator and contractors; open a state to see who is building where, or search announced jobs near your ZIP code.

StateBuilding nowAnnounced permanent jobsProjects with a construction figure
Pennsylvania53,3154
Ohio43,0955
Wisconsin22,5005
Utah12,0001
Texas81,5804
Indiana21,5253
North Carolina11,250—
Georgia11,1502
Louisiana21,0752
Illinois21,0003
Missouri21,0006
Kentucky01,0002
Mississippi01,0001
West Virginia19452
Arkansas18501
New Mexico17501
Michigan17113
South Carolina26971
Oklahoma06001
Wyoming15503
Minnesota15402
Florida0500—
Virginia34901
New York04753
California03502
Arizona33301
Alabama02251
New Jersey12001
Colorado02001
Oregon075—
Iowa1301
Maryland1——
Tennessee1——

Permanent-job totals add the first published figure for each tracked project in the state, as announced. Construction figures are counted by project and not added, because they mix peak headcount and totals over a multi-year build. Many projects publish no jobs figure, and announced jobs are promises, not guarantees.

Jobs promised by tracked projects

96 projects in the Census have a published jobs figure. Together, their stated permanent jobs add up to 30,008, as announced; promises are not guarantees, and each record notes how the figure was described.

ProjectStatusPermanent jobsConstruction jobs
PORTS-Pike Technology Campus
Piketon, Pike County, OH
Under construction2,50035,000 at full build-out
Stratos Project
Box Elder County, UT
Proposed2,000—
Meta Hyperion
Holly Ridge, Richland Parish, LA
Under construction1,0007,500 at peak
Homer City Energy Campus
Homer City, Indiana County, PA
Under construction1,000more than 10,000 over five-year build
Port Washington (Lighthouse) Data Center Campus
Port Washington, Ozaukee County, WI
Under construction1,000more than 4,000 over three-year build
Amazon Web Services Madison County Mega Site campus
Canton, Madison County, MS
Operating1,0006,000–7,000
Project Rainier (AWS New Carlisle campus)
New Carlisle, St. Joseph County, IN
Operating1,000600
Salem Township Innovation Campus
Salem Township, Luzerne County, PA
Under construction1,000—
Microsoft Fairwater
Mount Pleasant, Racine County, WI
Operating800more than 3,000 at peak
Project Jupiter
Santa Teresa, Doña Ana County, NM
Under construction750more than 2,500
Joliet Technology Center
Joliet, Will County, IL
Approved7007,000–10,000
Monarch Compute Campus
Point Pleasant, Mason County, WV
Under construction6454,375
Project Phoenix
Shippingport, Beaver County, PA
Under construction6403,000
Project Thunderbird
Enid, Garfield County, OK
Proposed600up to 4,000
Paducah Site AI campus
Paducah, McCracken County, KY
Proposed6008,000
Viridian Data Center Campus (former GM/JATCO site)
Janesville, Rock County, WI
Cancelled6001,200
Amazon Web Services Butts County data center campus
Jackson, Butts County, GA
Approved550—
Fort Meade Hyperscale Data Center
Fort Meade, Polk County, FL
Approved500—
Amazon Web Services Richmond County data center campus
Hamlet, Richmond County, NC
Under construction500—
AVAIO Digital Leo
Little Rock, Pulaski County, AR
Proposed500thousands
Pennsylvania Digital 1 (PAX-1)
Middlesex Township, Cumberland County, PA
Approved500—
Project Delta
Walnut Cove, Stokes County, NC
Approved500—
Comanche Circle
Tolar, Hood County, TX
Approved450—
Saline Township Stargate Data Center
Saline Township, Washtenaw County, MI
Under construction4502,500
Project Boulder
Walterboro, Colleton County, SC
Proposed450—
Project Camellia
Rincon, Effingham County, GA
Proposed400—
Meta Maysville campus
Maysville, Mason County, KY
Approved4004,000 at peak
AWS Project Green
New Florence, Montgomery County, MO
Approved400—
Balico data center campus and gas plant
Chatham, Pittsylvania County, VA
Denied390—
Project Tamarack
West Columbia, Mason County, WV
Approved300more than 1,000
Meta El Paso Data Center
El Paso, El Paso County, TX
Under construction300more than 4,000 at peak
Meta Lebanon Data Center
Lebanon, Boone County, IN
Under construction3004,000 at peak
Farmington Technology Park
Farmington, Dakota County, MN
Approved300—
Core Scientific Denton Data Center
Denton, Denton County, TX
Operating300—
Google West Memphis Data Center
West Memphis, Crittenden County, AR
Under construction300—
Project Tembo
Cheyenne, Laramie County, WY
Approved2502,500 at peak
Vantage Frontier Campus
Albany, Shackelford County, TX
Under construction250up to 6,500 at peak
Golden Valley Technology Hub
Taft, Kern County, CA
Proposed2501,500 at peak
Gateway Digital Campus
Villa Ridge, Franklin County, MO
Approved2502,000
Project Red Clay
Hayneville, Lowndes County, AL
Approved225more than 1,000
Project Flex
New Hudson, Oakland County, MI
Approved2101,500–2,000
IREN Sweetwater data center campus
Sweetwater, Fisher County, TX
Under construction200—
Project Arrowhead
Irwin County, GA
Proposed200—
Prometheus Hyperscale Evanston Campus
Evanston, Uinta County, WY
Approved2003,800
Global AI Data Center
Windsor, Weld County, CO
Approved2001,500
North Country Colocation Services Massena Expansion
Massena, St. Lawrence County, NY
Proposed2001,800–2,500 at peak
CRG Festus Data Center
Festus, Jefferson County, MO
Approved2001,000 at peak
Compass Statesville
Statesville, Iredell County, NC
Approved200—
Logan Prairie Data Center
Latham, Logan County, IL
Proposed2001,500 over 18-month build
Nebius Vineland Data Center
Vineland, Cumberland County, NJ
Under construction2001,000
QTS Van Wert Data Center Campus
Van Wert, Van Wert County, OH
Approved200more than 1,500
QTS York County Data Center Campus
Lake Wylie, York County, SC
Under construction2001,000
Project Blue
Tucson, Pima County, AZ
Under construction180more than 3,000 over 2026-2028
CoreWeave Lancaster data center
Lancaster, Lancaster County, PA
Under construction175600
Lake Mariner
Somerset, Niagara County, NY
Operating150—
Prime Phoenix Campus
Avondale, AZ
Under construction150—
Project Cumulus
St. Charles, St. Charles County, MO
Cancelled150700–1,000
Stream Data Centers STAMP Campus
Alabama, Genesee County, NY
Proposed1251,000
Project Mila
Trenton, Butler County, OH
Under construction120—
CyrusOne Sangamon County Data Center
Waverly, Sangamon County, IL
Approved100500
Amazon Becker Data Center
Becker, Sherburne County, MN
Paused1001,200
Imperial Data Center
Imperial, Imperial County, CA
Paused1002,500
Meta Beaver Dam Data Center
Beaver Dam, Dodge County, WI
Under construction100more than 1,000 at peak
Amazon Data Services King George campus (former Birchwood power plant site)
King George County, VA
Paused100—
AWS Fayette County Data Center Campus
Jeffersonville, Fayette County, OH
Approved100up to 1,500
AWS Wilmington data center
Wilmington, Clinton County, OH
Approved100over 200
Google Morgan County Data Center
Monrovia, Morgan County, IN
Under construction100—
Meta Cheyenne Data Center
Cheyenne, Laramie County, WY
Under construction100more than 1,000
Meta Rosemount Data Center
Rosemount, Dakota County, MN
Under construction100at least 1,000 at peak
Goodnight Campus
Claude, Armstrong County, TX
Under construction80—
Hut 8 River Bend Campus
St. Francisville, West Feliciana Parish, LA
Under construction751,000 at peak
Sabey Decatur Technology Park
Indianapolis, Marion County, IN
Approved75300
Oakline at Mill Creek
Salem, OR
Proposed75—
Project Galaxy (AWS Sidney data center)
Sidney, Shelby County, OH
Approved75—
Project Cannoli
Van Buren Township, Wayne County, MI
Approved51—
Quiet Data Centers, Trestle Road
Enfield, Halifax County, NC
Proposed50—
Google Franklin Township data center
Indianapolis, Marion County, IN
Cancelled50—
Little Rock Port data center
Little Rock, Pulaski County, AR
Proposed50—
Google Hermantown Data Center
Hermantown, St. Louis County, MN
Proposed40—
QTS Cedar Rapids Data Center Campus
Cedar Rapids, Linn County, IA
Under construction301,200
Valara Holdings High Performance Compute Center
Spartanburg, Spartanburg County, SC
Under construction27—
Project Liberty
Marion, Marion County, SC
Cancelled20—
Project Kilby
Pecos, Reeves County, TX
Proposed—over 6,000
Meramec Valley Technology Park
Pacific, Franklin County, MO
Approved—1,000 per year
Stargate Abilene
Abilene, Taylor County, TX
Operating—9,000 on site daily
Stafford Technology Campus
Stafford County, VA
Under construction—more than 1,000 at peak
Project Mica
Kansas City, Clay County, MO
Under construction—more than 1,000
Perry Township Data Center
Canton, Stark County, OH
Under construction—670
WF Industrial Yaphank Data Center
Yaphank, Suffolk County, NY
Proposed—1,000
Utah Data Center
Bluffdale, Utah County, UT
Operating—5,000–10,000
Google Kansas City Data Center (Hunt Midwest Business Center)
Kansas City, Clay County, MO
Under construction—more than 1,000
Menomonie Data Center (Balloonist LLC)
Menomonie, Dunn County, WI
Paused—up to 1,000
Project Cherry Blossom
Frenchtown Township, Monroe County, MI
Proposed—over 1,000
Pumpkin Technology Campus
Harlem, Columbia County, GA
Approved—1,500
QTS Augusta Data Center Campus
Augusta, Augusta-Richmond County, GA
Under construction—1,000 over several years
Switch Big Beaver data center campus
Big Beaver, Beaver County, PA
Proposed—1,500–2,000

Common questions

How many jobs does a data center create?

Virginia’s JLARC reports that a typical 250,000-square-foot facility may have about 50 full-time workers, about half of them contractors, while about 1,500 workers are on site at the height of construction.

How much do data center technicians make?

BLS doesn’t publish a separate category for data center technicians. For related occupations, May 2025 national medians were $76,220 for computer network support specialists, $63,190 for electricians and $61,010 for HVAC mechanics.

Do data centers hire electricians?

Yes — electrical work is among the largest trades on a data center project, covering power distribution, switchgear, generators and substation connections. BLS reports a median wage of $63,190 a year for electricians (May 2025) and says AI and data center demand are expected to contribute to rising electricity demand in its outlook for the trade. Most site electrical work is contracted, so hiring runs through electrical contractors working for the builder.

Where are data center jobs near me?

Jobs come from projects being built or operated nearby. The Census lists tracked projects by state, with announced permanent and construction jobs and which ones are under construction; its ZIP code lookup shows projects near you. Hiring is done by each project’s developer, operator and contractors.

Do data centers create permanent jobs?

Yes, but relatively few per facility compared with construction. Georgia’s 2022 evaluation modeled a $800 million data center with 50 employees versus about 4,200 construction jobs.

Sources

  1. Data Centers in Virginia (Report Summary)
    Joint Legislative Audit and Review Commission (JLARC), Virginia General Assembly · 2024-12-09
    4 source excerpts
    “Data center jobs tend to be high paying. Several data center representatives indicated that a typical 250,000-square-foot data center may have approximately 50 full-time workers, about half of which are contract workers.”
    “Construction of an individual data center building usually takes about 12 to 18 months, and data center representatives indicated that, at the height of construction, approximately 1,500 workers are on site from various construction-related industries.”
    “Overall, the data center industry is estimated to contribute 74,000 jobs, $5.5 billion in labor income, and $9.1 billion in GDP to Virginia's economy annually. ... Most of these economic benefits derive from the construction phase rather than data centers' ongoing operations.”
    “the exemption is valuable to the industry (providing $928 million in tax savings in FY23)”
  2. Data Processing, Hosting, and Related Services: NAICS 518 (Industries at a Glance)
    U.S. Bureau of Labor Statistics · 2026-08
    Source excerpt
    “Employment, all employees | 465.7 | 460.0 | (p)461.0 | (p)453.3 [May-Aug. 2026] ... Average hourly earnings | $59.01 | $59.88 | $59.63 | (p)$60.25 [Apr.-Jul. 2026]”
  3. Security Guards and Gambling Surveillance Officers, Occupational Outlook Handbook
    U.S. Bureau of Labor Statistics · 2025-05
    Source excerpt
    “The median annual wage for security guards was $38,020 in May 2025.”
  4. Network and Computer Systems Administrators, Occupational Outlook Handbook
    U.S. Bureau of Labor Statistics · 2025-05
    Source excerpt
    “The median annual wage for network and computer systems administrators was $99,130 in May 2025. ... Number of Jobs, 2025 | 323,600”
  5. Computer Support Specialists, Occupational Outlook Handbook
    U.S. Bureau of Labor Statistics · 2025-05
    2 source excerpts
    “The median annual wage for computer network support specialists was $76,220 in May 2025.”
    “The median annual wage for computer user support specialists was $61,860 in May 2025.”
  6. Industrial Machinery Mechanics, Machinery Maintenance Workers, and Millwrights, Occupational Outlook Handbook
    U.S. Bureau of Labor Statistics · 2025-05
    Source excerpt
    “The median annual wage for industrial machinery mechanics, machinery maintenance workers, and millwrights was $64,100 in May 2025. ... Number of Jobs, 2025 | 547,300”
  7. Electricians, Occupational Outlook Handbook
    U.S. Bureau of Labor Statistics · 2025-05
    2 source excerpts
    “The median annual wage for electricians was $63,190 in May 2025. ... Number of Jobs, 2025 | 821,000”
    “the increasing use of artificial intelligence (AI) technologies and demand for data centers to support this growth are expected to contribute to rising electricity demand.”
  8. Heating, Air Conditioning, and Refrigeration Mechanics and Installers, Occupational Outlook Handbook
    U.S. Bureau of Labor Statistics · 2025-05
    2 source excerpts
    “The median annual wage for heating, air conditioning, and refrigeration mechanics and installers was $61,010 in May 2025. ... Number of Jobs, 2025 | 440,900”
    “Commercial construction, including data centers, and residential building construction are expected to drive employment growth.”
  9. May 2023 National Industry-Specific Occupational Employment and Wage Estimates: NAICS 518200 - Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services
    U.S. Bureau of Labor Statistics · 2023-05
    Source excerpt
    “00-0000 | All Occupations | total | 482,080 | 0.0% | 100.00% | $49.20 | $55.88 | $116,230”
  10. Tax Incentive Evaluation: High-Tech Data Center Sales Tax Exemption (Summary)
    Georgia Department of Audits and Accounts · 2022-12
    Source excerpt
    “50 HTDC employees and an additional 217 jobs would be supported by the center's existence each year. ... Approximately 4,200 construction jobs and 7,300 total jobs would be created during an approximate two-year construction phase.”
  11. Data Centers in Virginia
    Joint Legislative Audit and Review Commission (JLARC), Virginia General Assembly · 2024-12-09
    3 source excerpts
    “Data center direct employees and contract workers accounted for, by JLARC staff estimates, over 8,000 full-time jobs in FY23.”
    “On average, data center employees and contractors earn about $100,000 per year, varying based on job role and area of the state.”
    “Return in revenue per $1 spent 48¢ ... Jobs added 84 jobs [data center exemption] ... Jobs added 58 jobs [average Virginia incentive]”
  12. Tax Incentive Evaluation: Georgia Data Center Sales & Use Tax Exemption
    Carl Vinson Institute of Government, University of Georgia (for Georgia Department of Audits and Accounts) · 2025-12
    2 source excerpts
    “Institute researchers projected permanent, full-time employment in data centers in Georgia to be 1,873 in 2025.”
    “Institute researchers estimated that 30% of data center activity in Georgia was attributable to the presence of the tax incentive, and that the remainder (70%) of data center activity likely occurring without it.”
  13. Georgia Data Center Sales & Use Tax Exemption (Summary, Revised)
    Georgia Department of Audits and Accounts · 2026-01
    Source excerpt
    “The Institute estimated forgone state tax revenue of $474.2 million in FY 2025.”
  14. 2026 PwC Report: Economic contributions of U.S. data centers, 2023-2024
    Data Center Coalition (industry-commissioned, prepared by PwC) · 2026
    2 source excerpts
    “The Data Center Coalition (DCC) engaged independent consultant PwC to quantify the economic contributions of the U.S. data center industry between 2023 and 2024. ... In 2024, the U.S. data center industry directly employed 1,005,080 people.”
    “From 2023 to 2024, the data center industry's total annual employment contribution grew from 4.7 million jobs to 5.5 million jobs—a 17% increase. ... At the national level, each direct job in the data center industry supports more than 4.5 jobs elsewhere in the U.S. economy.”

Each source was opened and checked against the excerpt shown. Company statements are identified as such. Figures are as published; where sources differ, each is shown.