Project Phoenix

Shippingport, Beaver County, PA[6]Developer: Aligned Data Centers[4][6]

Under construction[4][6]Groundbreaking announced September 10, 2026
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

Aligned Data Centers is building Project Phoenix, a 2 GW data center campus spanning three facilities in the Shippingport Industrial Park, on the former site of the Bruce Mansfield coal-fired power plant in Beaver County. Aligned says the campus will be powered by its own dedicated onsite source instead of drawing from the local electrical grid, and will be cooled by a closed-loop system designed to need no water for operational cooling. Aligned closed on a 650.89-acre property in Shippingport in July 2026 and announced the groundbreaking on September 10, 2026.

Planned capacity
2 GW[1]
company-stated campus capacity
Site size
650.89 acres[3]
property purchased by Aligned
Permanent jobs (promised)
640
estimated

Key facts

Size & schedule

Planned capacity2 GW [1]
company-stated campus capacity
Source excerpt
“today announced the groundbreaking of "Project Phoenix," a new 2 GW data center campus located in Shippingport, Pennsylvania.”
Site size650.89 acres [3]
property purchased by Aligned
Source excerpt
“Aligned Data Centers, LLC closed the deal on a 650.89-acre property in Shippingport on Monday.”
Floor area2 million sq ft [3]
'nearly 2 million-square-foot' campus
Source excerpt
“a nearly 2 million-square-foot data center campus near the former Bruce Mansfield power plant for $223,150,865.38.”
Buildings3 [1]
Source excerpt
“Spanning three facilities, the development will meet robust regional demand for digital infrastructure while anchoring an estimated $10B in regional economic investment.”
Stated investmentAn estimated $10 billion in regional economic investment the campus would anchor (company-stated) [1]
regional economic investment, not the campus construction cost
Source excerpt
“Spanning three facilities, the development will meet robust regional demand for digital infrastructure while anchoring an estimated $10B in regional economic investment.”
Permanent jobs (promised)640 [1]
estimated
Construction jobs3,000 [1]
estimated

How big is that? Data center sizes compared with football fields and Central Park.

Power

Power supplyIts own dedicated onsite power instead of the local electrical grid [1]
Source excerpt
“Project Phoenix will use its own dedicated onsite power source rather than the local electrical grid.”
On-site generation typenatural gas-fired on-site power [6]
Source excerpt
“will run on its own on-site, natural gas-fired power rather than the PJM grid”

Water

Coolingclosed-loop system recycling deionized water; zero water for operational cooling (company-stated) [1]

Local decisions & site

Parcel / addressFormer Bruce Mansfield coal-fired power plant site, Shippingport Industrial Park [4]
Source excerpt
“the former Bruce Mansfield coal-fired power plant site in the Shippingport Industrial Park”

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Planned capacity2 GW [1]
Power supplyIts own dedicated onsite power instead of the local electrical grid [1]

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Timeline

  1. DCD reports Aligned plans natural gas-powered data center buildings at the 660-acre Shippingport Industrial Park owned by Frontier Group of Companies [5]

  2. Aligned closes purchase of a 650.89-acre property in Shippingport for $223,150,865.38 [3]

  3. Aligned announces groundbreaking of the 2 GW Project Phoenix campus [1]

Issues raised

  • The Borough of Shippingport council held a public hearing on Aligned's conditional use requests [5]
  • The adjacent Shippingport Power Station is being redeveloped into a natural gas energy campus with up to 3.6GW of behind-the-meter capacity [2]

Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.

Sources

  1. Aligned Data Centers and Shippingport Community Mark Revitalization of Legacy Energy Site with Groundbreaking of 2 GW "Project Phoenix" Campus
    GlobeNewswire (Aligned Data Centers) · Sep 10, 2026 · company
  2. Aligned breaks ground on gigawatt-scale data center campus in Pennsylvania
    DatacenterDynamics · Sep 17, 2026 · news
  3. Align Data Centers, LLC closes deal to build data center campus near former Bruce Mansfield power plant for just over $223 million
    Beaver County Radio · Jul 29, 2026 · news
  4. Groundbreaking held for "The Project Phoenix" data center complex in Shippingport
    Beaver County Radio · Sep 14, 2026 · news
  5. Aligned looks to Pennsylvania, eyes two natural gas-powered facilities outside Pittsburgh
    DatacenterDynamics · Feb 3, 2026 · news
  6. Aligned Breaks Ground on $10B, 2 GW Data Center in Beaver County
    Marcellus Drilling News · Sep 11, 2026 · news

Cite this page

Last updated Sep 23, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Project Phoenix. Retrieved from https://datacentercensus.com/dc/aligned-project-phoenix-shippingport-pa
MLA“Project Phoenix.” Data Center Census, Sep 23, 2026, https://datacentercensus.com/dc/aligned-project-phoenix-shippingport-pa.