Shippingport, Beaver County, PA[6]Developer: Aligned Data Centers[4][6]
- Rumored
- Proposed
- Approved
- Under construction
- Operating
Follow this project
New dated changes arrive in your feed reader or calendar. No account, no email address, no tracking.
- RSS feed for any feed reader
- Atom feed
- Hearings calendar (.ics, subscribes in Apple, Google or Outlook Calendar)
Aligned Data Centers is building Project Phoenix, a 2 GW data center campus spanning three facilities in the Shippingport Industrial Park, on the former site of the Bruce Mansfield coal-fired power plant in Beaver County. Aligned says the campus will be powered by its own dedicated onsite source instead of drawing from the local electrical grid, and will be cooled by a closed-loop system designed to need no water for operational cooling. Aligned closed on a 650.89-acre property in Shippingport in July 2026 and announced the groundbreaking on September 10, 2026.
- Permanent jobs (promised)
- 640
- estimated
Key facts
Size & schedule
| Planned capacity | 2 GW [1] company-stated campus capacity Source excerpt“today announced the groundbreaking of "Project Phoenix," a new 2 GW data center campus located in Shippingport, Pennsylvania.” |
|---|---|
| Site size | 650.89 acres [3] property purchased by Aligned Source excerpt“Aligned Data Centers, LLC closed the deal on a 650.89-acre property in Shippingport on Monday.” |
| Floor area | 2 million sq ft [3] 'nearly 2 million-square-foot' campus Source excerpt“a nearly 2 million-square-foot data center campus near the former Bruce Mansfield power plant for $223,150,865.38.” |
| Buildings | 3 [1]Source excerpt“Spanning three facilities, the development will meet robust regional demand for digital infrastructure while anchoring an estimated $10B in regional economic investment.” |
| Stated investment | An estimated $10 billion in regional economic investment the campus would anchor (company-stated) [1] regional economic investment, not the campus construction cost Source excerpt“Spanning three facilities, the development will meet robust regional demand for digital infrastructure while anchoring an estimated $10B in regional economic investment.” |
| Permanent jobs (promised) | 640 [1] estimated |
| Construction jobs | 3,000 [1] estimated |
How big is that? Data center sizes compared with football fields and Central Park.
Power
| Power supply | Its own dedicated onsite power instead of the local electrical grid [1]Source excerpt“Project Phoenix will use its own dedicated onsite power source rather than the local electrical grid.” |
|---|---|
| On-site generation type | natural gas-fired on-site power [6]Source excerpt“will run on its own on-site, natural gas-fired power rather than the PJM grid” |
Water
| Cooling | closed-loop system recycling deionized water; zero water for operational cooling (company-stated) [1] |
|---|
Local decisions & site
| Parcel / address | Former Bruce Mansfield coal-fired power plant site, Shippingport Industrial Park [4]Source excerpt“the former Bruce Mansfield coal-fired power plant site in the Shippingport Industrial Park” |
|---|
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Water and power
Water
Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.
Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →
Timeline
DCD reports Aligned plans natural gas-powered data center buildings at the 660-acre Shippingport Industrial Park owned by Frontier Group of Companies [5]
Aligned closes purchase of a 650.89-acre property in Shippingport for $223,150,865.38 [3]
Aligned announces groundbreaking of the 2 GW Project Phoenix campus [1]
Issues raised
- The Borough of Shippingport council held a public hearing on Aligned's conditional use requests [5]
- The adjacent Shippingport Power Station is being redeveloped into a natural gas energy campus with up to 3.6GW of behind-the-meter capacity [2]
Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.
Sources
- Aligned Data Centers and Shippingport Community Mark Revitalization of Legacy Energy Site with Groundbreaking of 2 GW "Project Phoenix" CampusGlobeNewswire (Aligned Data Centers) · Sep 10, 2026 · company
- Aligned breaks ground on gigawatt-scale data center campus in PennsylvaniaDatacenterDynamics · Sep 17, 2026 · news
- Align Data Centers, LLC closes deal to build data center campus near former Bruce Mansfield power plant for just over $223 millionBeaver County Radio · Jul 29, 2026 · news
- Groundbreaking held for "The Project Phoenix" data center complex in ShippingportBeaver County Radio · Sep 14, 2026 · news
- Aligned looks to Pennsylvania, eyes two natural gas-powered facilities outside PittsburghDatacenterDynamics · Feb 3, 2026 · news
- Aligned Breaks Ground on $10B, 2 GW Data Center in Beaver CountyMarcellus Drilling News · Sep 11, 2026 · news
Cite this page
Last updated Sep 23, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Project Phoenix. Retrieved from https://datacentercensus.com/dc/aligned-project-phoenix-shippingport-pa |
|---|---|
| MLA | “Project Phoenix.” Data Center Census, Sep 23, 2026, https://datacentercensus.com/dc/aligned-project-phoenix-shippingport-pa. |
| Link | https://datacentercensus.com/dc/aligned-project-phoenix-shippingport-pa |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.