Data centers in Beaver County, Pennsylvania

The Census tracks 2 data center projects in Beaver County, Pennsylvania, with 2 GW of published capacity: 1 proposed, 1 under construction.

Printable fact sheet

How many data centers are in Beaver County?

The Census tracks 2 major projects here as of Oct 13, 2026: 1 proposed, 1 under construction. They are in Shippingport, Big Beaver. The largest by published capacity is Project Phoenix (2 GW).

Projects

ProjectStatusCapacityDeveloper
Project Phoenix
Shippingport, Beaver County, PA
Under construction2 GWAligned Data Centers
Switch Big Beaver data center campus
Big Beaver, Beaver County, PA
Proposed—Switch

Recent changes

DateWhat changedProject
Sep 11, 2026The borough received preliminary design plans and posted a link to them. Big Beaver BoroughSwitch Big Beaver data center campus
Sep 10, 2026Aligned announces groundbreaking of the 2 GW Project Phoenix campus GlobeNewswire (Aligned Data Centers)Project Phoenix
Sep 4, 2026Revised land development plans, stormwater calculations and an acoustics study were submitted to the borough. Big Beaver BoroughSwitch Big Beaver data center campus
Aug 27, 2026The borough planning committee's agenda included Switch's notice of intent to seek subdivision and land development approval. Big Beaver BoroughSwitch Big Beaver data center campus
Aug 27, 2026The borough meeting on Switch's plans moved outdoors because of the large turnout, and residents raised concerns about the project. Beaver County RadioSwitch Big Beaver data center campus
Aug 19, 2026At a county commissioners' work session, the county solicitor reported that the county planning commission had reviewed the application and was forwarding its recommendations to the borough. Beaver County RadioSwitch Big Beaver data center campus
Aug 12, 2026The borough began posting the application and supporting studies online for public review. Big Beaver BoroughSwitch Big Beaver data center campus
Jul 7, 2026Engineering firm Atwell submitted the preliminary land development plan application to the borough on Switch's behalf. Big Beaver Borough (Atwell, LLC submission)Switch Big Beaver data center campus
Jul 2026Aligned closes purchase of a 650.89-acre property in Shippingport for $223,150,865.38 Beaver County RadioProject Phoenix
Jun 29, 2026Local groups opposed to the project held a community meeting attended by nearly 100 people. WPXISwitch Big Beaver data center campus
Jun 29, 2026Switch's general counsel signed the Beaver County land development application for 'Switch Pit 01-03'. Big Beaver BoroughSwitch Big Beaver data center campus
Jun 2, 2026Switch held a public town hall at the Big Beaver fire hall to present the three-building plan. Police provided security for a large crowd. Beaver County RadioSwitch Big Beaver data center campus

Beaver County data centers: common questions

How many data centers are in Beaver County, Pennsylvania?

The Census tracks 2 major data center projects in Beaver County as of Oct 13, 2026: 1 proposed, 1 under construction. That covers major sourced projects, not every smaller colocation or enterprise facility.

What is the biggest data center project in Beaver County?

By published planned capacity, Project Phoenix in Shippingport, at 2 GW. Its status is under construction.

This page collects the county-level record: every tracked project, moratorium and local rule we can source for Beaver County. See all Pennsylvania projects or look up projects near your ZIP code.

Cite this page

Last updated Oct 13, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in Beaver County, Pennsylvania. Retrieved from https://datacentercensus.com/us/pennsylvania/beaver-county
MLA“Data centers in Beaver County, Pennsylvania.” Data Center Census, Oct 13, 2026, https://datacentercensus.com/us/pennsylvania/beaver-county.
Linkhttps://datacentercensus.com/us/pennsylvania/beaver-county

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.