40 headline numbers on tracked U.S. data center projects, computed from the Census records when this page is built. 170 projects, 126.07 GW of planned capacity and 112 moratorium actions as of October 14, 2026.

As of . Latest change in the record: . Rebuilt from the records on every deploy, daily.

The pipeline

  • Tracked projects

    170

    The Census holds a sourced record for 170 major U.S. data center projects in 36 states. It is not a count of every data center in the country.

    As of · All projects

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Tracked projects, 170. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-tracked-projects

    MLA “Data Center Statistics (2026): Tracked projects, 170.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-tracked-projects. Accessed 14 Oct. 2026.

  • States with a tracked project

    36

    36 states have at least one tracked project; the rest have none on record.

    As of · By state

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): States with a tracked project, 36. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-states-with-projects

    MLA “Data Center Statistics (2026): States with a tracked project, 36.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-states-with-projects. Accessed 14 Oct. 2026.

  • Operating projects

    13

    13 tracked projects are operating according to the latest cited sources.

    As of · Project register

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Operating projects, 13. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-status-operating

    MLA “Data Center Statistics (2026): Operating projects, 13.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-status-operating. Accessed 14 Oct. 2026.

  • Under construction projects

    46

    46 tracked projects are under construction according to the latest cited sources.

    As of · Project register

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Under construction projects, 46. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-status-under_construction

    MLA “Data Center Statistics (2026): Under construction projects, 46.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-status-under_construction. Accessed 14 Oct. 2026.

  • Approved projects

    44

    44 tracked projects are approved according to the latest cited sources.

    As of · Project register

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Approved projects, 44. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-status-approved

    MLA “Data Center Statistics (2026): Approved projects, 44.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-status-approved. Accessed 14 Oct. 2026.

  • Proposed projects

    34

    34 tracked projects are proposed according to the latest cited sources.

    As of · Project register

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Proposed projects, 34. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-status-proposed

    MLA “Data Center Statistics (2026): Proposed projects, 34.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-status-proposed. Accessed 14 Oct. 2026.

  • Rumored projects

    6

    6 tracked projects are reported but not yet formally filed or announced. They are in the project count but not in capacity totals.

    As of · Status definitions

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Rumored projects, 6. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-status-rumored

    MLA “Data Center Statistics (2026): Rumored projects, 6.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-status-rumored. Accessed 14 Oct. 2026.

  • Paused, cancelled or denied projects

    27

    8 paused, 12 cancelled and 7 denied. These stay in the record with their history.

    As of · Project register

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Paused, cancelled or denied projects, 27. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-status-stopped

    MLA “Data Center Statistics (2026): Paused, cancelled or denied projects, 27.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-status-stopped. Accessed 14 Oct. 2026.

  • Planned capacity in the pipeline

    126.07 GW

    83 proposed, approved, under-construction or operating projects publish a planned capacity, adding up to 126.07 GW; 54 active projects publish none and are not estimated.

    As of · Capacity meter

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Planned capacity in the pipeline, 126.07 GW. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-pipeline-capacity

    MLA “Data Center Statistics (2026): Planned capacity in the pipeline, 126.07 GW.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-pipeline-capacity. Accessed 14 Oct. 2026.

  • Capacity under construction

    70.16 GW

    46 projects under construction publish 70.16 GW of planned capacity, the full planned figure rather than what is built so far.

    As of · Project register

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Capacity under construction, 70.16 GW. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-uc-capacity

    MLA “Data Center Statistics (2026): Capacity under construction, 70.16 GW.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-uc-capacity. Accessed 14 Oct. 2026.

  • AI data center projects

    42

    42 tracked projects are shown by their own records to be built for AI and not paused, cancelled or denied. Each has the evidence listed.

    As of · AI data center count

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): AI data center projects, 42. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-ai-campuses

    MLA “Data Center Statistics (2026): AI data center projects, 42.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-ai-campuses. Accessed 14 Oct. 2026.

  • Planned capacity of AI projects

    68.38 GW

    Proposed, approved, under-construction and operating AI projects that publish a capacity add up to 68.38 GW, within the 126.07 GW pipeline total.

    As of · AI data center count

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Planned capacity of AI projects, 68.38 GW. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-ai-capacity

    MLA “Data Center Statistics (2026): Planned capacity of AI projects, 68.38 GW.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-ai-capacity. Accessed 14 Oct. 2026.

Projects and planned capacity by status

StatusProjectsCapacity published byPlanned capacity
Rumored61300 MW
Proposed341823.1 GW
Approved442428.64 GW
Under construction463370.16 GW
Operating1384.18 GW
Paused842.43 GW
Cancelled1252.22 GW
Denied71600 MW
Method: what is counted and what is not

Counts are of tracked projects: major U.S. projects with a sourced record. Smaller colocation and enterprise facilities are not included, so these are not national totals.

Planned capacity adds each record’s first published capacity figure (total power, else IT load) for proposed, approved, under-construction and operating projects. A project that publishes none is counted separately and never estimated. IT load is the power reaching computing equipment; total power also covers cooling and losses, so a total that mixes the two understates total power draw.

Rumored, paused, cancelled and denied projects are in project counts but not in capacity totals.

Local response

  • Moratorium and pause actions

    112

    The tracker records 112 local or state actions on data center moratoriums in 27 states, including rejections and reversals.

    As of · Moratorium tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Moratorium and pause actions, 112. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-moratorium-actions

    MLA “Data Center Statistics (2026): Moratorium and pause actions, 112.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-moratorium-actions. Accessed 14 Oct. 2026.

  • Adopted, extended or announced pauses

    103

    103 recorded actions adopted, extended or announced a pause. A pause may have ended since; each entry links to its source.

    As of · Moratorium tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Adopted, extended or announced pauses, 103. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-moratorium-in-force

    MLA “Data Center Statistics (2026): Adopted, extended or announced pauses, 103.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-moratorium-in-force. Accessed 14 Oct. 2026.

  • States with a recorded moratorium action

    27

    Actions are on record in 27 states; 3 statewide actions are included.

    As of · Moratoriums by state

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): States with a recorded moratorium action, 27. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-moratorium-states

    MLA “Data Center Statistics (2026): States with a recorded moratorium action, 27.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-moratorium-states. Accessed 14 Oct. 2026.

  • Rejected, lifted or set-aside pauses

    7

    7 recorded actions rejected a pause, lifted one or had one set aside by a court.

    As of · Moratorium tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Rejected, lifted or set-aside pauses, 7. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-moratorium-reversed

    MLA “Data Center Statistics (2026): Rejected, lifted or set-aside pauses, 7.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-moratorium-reversed. Accessed 14 Oct. 2026.

  • Court cases over tracked projects

    38

    38 cases on record, 30 pending. Allegations are not findings unless a court has ruled.

    As of · Lawsuit tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Court cases over tracked projects, 38. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-lawsuits

    MLA “Data Center Statistics (2026): Court cases over tracked projects, 38.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-lawsuits. Accessed 14 Oct. 2026.

  • Pending court cases

    30

    30 cases had no recorded final ruling at the date of its latest source.

    As of · Lawsuit tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Pending court cases, 30. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-lawsuits-pending

    MLA “Data Center Statistics (2026): Pending court cases, 30.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-lawsuits-pending. Accessed 14 Oct. 2026.

  • Cancelled projects

    12

    12 tracked projects were withdrawn or cancelled by the developer or the host community.

    As of · Project register

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Cancelled projects, 12. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-cancelled-projects

    MLA “Data Center Statistics (2026): Cancelled projects, 12.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-cancelled-projects. Accessed 14 Oct. 2026.

  • Denied projects

    7

    7 tracked projects were denied a required approval.

    As of · Project register

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Denied projects, 7. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-denied-projects

    MLA “Data Center Statistics (2026): Denied projects, 7.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-denied-projects. Accessed 14 Oct. 2026.

Moratorium actions by type

ActionRecorded
Adopted94
Extended8
Rejected6
Set aside by court1
Vote to draft a pause1
Announced1
Extension recommended1
Method: what is counted and what is not

Moratorium actions are every pause, extension, rejection, lift or court reversal confirmed in a published notice or report; one jurisdiction can appear more than once. Statewide actions are included and counted once each.

Court cases are those confirmed against a filing or news report. Status is as of each source’s date. Cancelled and denied are project statuses, counted once per project.

Economics

  • Announced investment

    $769.2 billion

    78 proposed, approved, under-construction or operating projects state an investment figure; they add up to $769.2 billion. These are announced figures, some covering several phases or sites.

    As of · Ranked by investment

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Announced investment, $769.2 billion. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-investment

    MLA “Data Center Statistics (2026): Announced investment, $769.2 billion.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-investment. Accessed 14 Oct. 2026.

  • Announced permanent jobs

    27,193

    70 active projects announce a permanent jobs figure, 27,193 in all. Announced, not realized; ranges and text figures are not added.

    As of · Jobs near a ZIP code

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Announced permanent jobs, 27,193. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-jobs-permanent

    MLA “Data Center Statistics (2026): Announced permanent jobs, 27,193.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-jobs-permanent. Accessed 14 Oct. 2026.

  • Projects announcing construction jobs

    53

    53 projects announce a construction jobs figure. Construction jobs are temporary and overlap in time, so they are never added together.

    As of · Jobs near a ZIP code

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Projects announcing construction jobs, 53. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-jobs-construction-projects

    MLA “Data Center Statistics (2026): Projects announcing construction jobs, 53.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-jobs-construction-projects. Accessed 14 Oct. 2026.

  • Projects with documented tax incentive terms

    81

    81 tracked projects have a tax abatement, exemption, payment-in-lieu or similar term on record.

    As of · Tax breaks tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Projects with documented tax incentive terms, 81. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-incentives

    MLA “Data Center Statistics (2026): Projects with documented tax incentive terms, 81.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-incentives. Accessed 14 Oct. 2026.

  • Stated abatement value

    $12.1 billion

    6 active projects state a dollar value for an abatement, $12.1 billion in all. Terms differ by deal, so the total is a sum of stated figures, not a cost to taxpayers.

    As of · Tax breaks tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Stated abatement value, $12.1 billion. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-abatement-value

    MLA “Data Center Statistics (2026): Stated abatement value, $12.1 billion.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-abatement-value. Accessed 14 Oct. 2026.

Method: what is counted and what is not

Investment, jobs and abatement values are the first figure each record publishes, as stated by its source, for proposed, approved, under-construction and operating projects. They are announcements, not outcomes, and some cover several phases or sites.

Permanent jobs are summed only where the figure is a single number. Construction jobs are never summed: they are temporary and overlap. Ranges and text figures are shown on project pages and not added.

Water and power

  • Projects publishing a daily water figure

    32

    32 active projects publish a per-day water use figure. Most publish none.

    As of · Water use tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Projects publishing a daily water figure, 32. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-water-projects

    MLA “Data Center Statistics (2026): Projects publishing a daily water figure, 32.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-water-projects. Accessed 14 Oct. 2026.

  • Published water use, per day

    46.3 million gal

    The published per-day figures add up to 46.3 million gallons a day. Some are maximums or full build-out figures, so the sum is a ceiling.

    As of · Water use tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Published water use, per day, 46.3 million gal. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-water-total

    MLA “Data Center Statistics (2026): Published water use, per day, 46.3 million gal.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-water-total. Accessed 14 Oct. 2026.

  • Projects with a documented power arrangement

    116

    116 tracked projects have a documented utility, grid operator, generation plan or permit.

    As of · Power tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Projects with a documented power arrangement, 116. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-power-documented

    MLA “Data Center Statistics (2026): Projects with a documented power arrangement, 116.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-power-documented. Accessed 14 Oct. 2026.

  • Projects with on-site or dedicated generation

    15

    15 projects include on-site or dedicated power generation in the cited sources.

    As of · Power tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Projects with on-site or dedicated generation, 15. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-onsite-generation

    MLA “Data Center Statistics (2026): Projects with on-site or dedicated generation, 15.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-onsite-generation. Accessed 14 Oct. 2026.

  • Capacity figures that are IT load

    4

    4 projects publish IT load rather than total facility power, so their capacity understates total power draw. Totals above mix both.

    As of · Methodology

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Capacity figures that are IT load, 4. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-it-load-basis

    MLA “Data Center Statistics (2026): Capacity figures that are IT load, 4.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-it-load-basis. Accessed 14 Oct. 2026.

Method: what is counted and what is not

Water counts the first per-day figure a record publishes for active projects. Annual or per-phase figures are not converted. Published figures are often maximums.

Power counts projects whose sources document a utility, grid operator, generation plan or permit. A project not counted has no such document in the sources reviewed, which is not the same as having none.

Geography

  • State with the most tracked projects

    Texas

    Texas has 15 tracked projects, the most of any state.

    As of · Texas

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): State with the most tracked projects, Texas. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-top-state-projects

    MLA “Data Center Statistics (2026): State with the most tracked projects, Texas.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-top-state-projects. Accessed 14 Oct. 2026.

  • State with the most pipeline capacity

    Texas

    Texas has 32.45 GW of published capacity in active projects, the most of any state.

    As of · Texas

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): State with the most pipeline capacity, Texas. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-top-state-capacity

    MLA “Data Center Statistics (2026): State with the most pipeline capacity, Texas.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-top-state-capacity. Accessed 14 Oct. 2026.

  • Counties with a tracked project

    145

    145 countys host at least one tracked project. Locations are approximate where a record gives only a town or county.

    As of · County fact sheets

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Counties with a tracked project, 145. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-counties

    MLA “Data Center Statistics (2026): Counties with a tracked project, 145.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-counties. Accessed 14 Oct. 2026.

  • Largest project by published capacity

    17 GW

    Fermi America Project Matador in Amarillo, Carson County, TX publishes the largest planned capacity of any tracked project.

    As of · Fermi America Project Matador

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Largest project by published capacity, 17 GW. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-largest-project

    MLA “Data Center Statistics (2026): Largest project by published capacity, 17 GW.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-largest-project. Accessed 14 Oct. 2026.

Top states by tracked projects

Top states by pipeline capacity

StatePlanned capacity
Texas32.45 GW
West Virginia11.76 GW
Ohio11.49 GW
Utah9.07 GW
Illinois7.06 GW
Pennsylvania6.7 GW
Louisiana5.33 GW
Georgia4.36 GW
Wyoming3.95 GW
Maryland3.22 GW
Method: what is counted and what is not

Locations are approximate where a record gives only a town or county. State and county rankings use the tracked projects only; a county is counted if it hosts at least one.

What changed recently

  • New projects, last 30 days

    0

    0 tracked projects have their earliest dated milestone in the 30 days to October 14, 2026.

    As of · Latest changes

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): New projects, last 30 days, 0. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-new-projects-30

    MLA “Data Center Statistics (2026): New projects, last 30 days, 0.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-new-projects-30. Accessed 14 Oct. 2026.

  • New projects, last 90 days

    4

    4 tracked projects have their earliest dated milestone in the 90 days to October 14, 2026.

    As of · Latest changes

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): New projects, last 90 days, 4. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-new-projects-90

    MLA “Data Center Statistics (2026): New projects, last 90 days, 4.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-new-projects-90. Accessed 14 Oct. 2026.

  • New moratorium actions, last 30 days

    21

    21 adopted, extended or announced pauses dated in the 30 days to October 14, 2026.

    As of · Moratorium tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): New moratorium actions, last 30 days, 21. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-new-moratoriums-30

    MLA “Data Center Statistics (2026): New moratorium actions, last 30 days, 21.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-new-moratoriums-30. Accessed 14 Oct. 2026.

  • New moratorium actions, last 90 days

    45

    45 adopted, extended or announced pauses dated in the 90 days to October 14, 2026.

    As of · Moratorium tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): New moratorium actions, last 90 days, 45. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-new-moratoriums-90

    MLA “Data Center Statistics (2026): New moratorium actions, last 90 days, 45.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-new-moratoriums-90. Accessed 14 Oct. 2026.

  • Dated changes recorded, last 30 days

    55

    55 dated changes in project timelines in the 30 days to October 14, 2026, each with its source.

    As of · Latest changes

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Dated changes recorded, last 30 days, 55. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-changes-30

    MLA “Data Center Statistics (2026): Dated changes recorded, last 30 days, 55.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-changes-30. Accessed 14 Oct. 2026.

  • Court cases filed, last 90 days

    6

    6 cases filed in the 90 days to October 14, 2026.

    As of · Lawsuit tracker

    Cite

    APA Data Center Census. (2026, October 14). Data Center Statistics (2026): Court cases filed, last 90 days, 6. Retrieved October 14, 2026, from https://datacentercensus.com/statistics#stat-lawsuits-90

    MLA “Data Center Statistics (2026): Court cases filed, last 90 days, 6.” Data Center Census, 14 Oct. 2026, https://datacentercensus.com/statistics#stat-lawsuits-90. Accessed 14 Oct. 2026.

Method: what is counted and what is not

Windows count back from the build date. A project is “new” when its earliest dated milestone falls in the window; an earlier year-only milestone keeps it out. Moratorium actions use the vote date, else the date of the source. A date known only to the month counts as the last day of that month, so it enters a window when the month ends.

Data center statistics: common questions

How many data centers are being built in the U.S.?

As of October 14, 2026, the Data Center Census tracks 170 major U.S. data center projects: 46 under construction, 44 approved, 34 proposed and 13 operating. The count covers projects with a sourced record, not every data center in the country.

How much power are tracked data center projects planning?

126.07 GW of planned capacity is published across the proposed, approved, under-construction and operating projects that state one. 54 active projects publish none. Some figures are IT load rather than total power.

How many data center moratoriums are there?

The tracker records 112 moratorium and pause actions in 27 states, 103 of them adopted, extended or announced, as of October 14, 2026.

How many data center projects have been cancelled or denied?

12 tracked projects are cancelled and 7 denied; 38 court cases are on record.

How many jobs do announced data center projects promise?

Active projects that state a single permanent jobs figure announce 27,193 permanent jobs in total. These are announced numbers, and construction jobs are not added up.

Where are the most data centers being built?

By tracked project count, Texas leads; by published pipeline capacity, Texas leads.

Use these numbers

Every figure is free to reuse with attribution under CC BY 4.0. Use the Cite button under a number for a ready citation with your retrieval date. The records behind each figure are linked beside it; the data is downloadable as CSV, JSON and GeoJSON, and charts, state and county fact sheets and monthly reports use the same records. Counts describe what the Census has recorded, not everything that exists.

Cite this page

Last updated Oct 14, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data Center Statistics (2026). Retrieved from https://datacentercensus.com/statistics
MLA“Data Center Statistics (2026).” Data Center Census, Oct 14, 2026, https://datacentercensus.com/statistics.
Linkhttps://datacentercensus.com/statistics

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.