Data Center Census Near me

Louisiana

Data centers in Louisiana

The Census tracks 2 major data center projects in Louisiana, with 5.33 GW of planned capacity: 2 under construction.

How many data centers are in Louisiana?

The Census tracks 2 major data center projects in Louisiana as of Nov 6, 2026: 2 under construction. That covers major sourced projects, not every smaller facility. The largest by planned capacity is Meta Hyperion (5 GW). Latest change, at Meta Hyperion: LPSC votes 3-1 to reject an administrative law judge's recommendation to make Meta job and power-demand information available through subpoenas (Aug 12, 2026).

Projects tracked
2
Planned capacity, active projects
5.33GW
Under construction
2
Permanent jobs promised
1,075
RumoredProposedApprovedUnder constructionOperatingPausedCancelledDenied© OpenFreeMap © OpenStreetMap

Louisiana data center projects

ProjectStatusCapacityDeveloperLast update
Meta Hyperion
Holly Ridge, Richland Parish
Under construction 5 GW Meta Aug 12, 2026
Hut 8 River Bend Campus
St. Francisville, West Feliciana Parish
Under construction 330 MW Hut 8, Fluidstack Jun 15, 2026

Recent changes in Louisiana

  1. Meta Hyperion LA
    LPSC votes 3-1 to reject an administrative law judge's recommendation to make Meta job and power-demand information available through subpoenas WWNO
  2. Meta Hyperion LA
    Meta announces expansion to 5 GW and more than $50 billion investment Meta
  3. Hut 8 River Bend Campus LA
    West Feliciana Parish Council and Industrial Development Board accept an agreement for a $10 million PILOT prepayment from Hut 8 due July 1, 2026 WBRZ
  4. Meta Hyperion LA
    LPSC votes 4-1 to fast-track Entergy's plan for seven new gas plants for the campus Louisiana Radio Network
  5. Meta Hyperion LA
    LPSC declines to investigate Meta's financing arrangement with Blue Owl Capital for the data center Union of Concerned Scientists
  6. Meta Hyperion LA
    Alliance for Affordable Energy and Union of Concerned Scientists ask the LPSC to investigate Meta's new financing arrangement for Hyperion and review Entergy's prudence Alliance for Affordable Energy and Union of Concerned Scientists (Earthjustice)
  7. Hut 8 River Bend Campus LA
    Parish president says parish permitting is complete; construction already under way 10/12 Industry Report
  8. Hut 8 River Bend Campus LA
    Hut 8 signs 15-year, 245 MW lease with Fluidstack; state and Entergy announce $10 billion project Louisiana Economic Development
  9. Meta Hyperion LA
    LPSC approves Entergy Louisiana's three combined-cycle gas plants (~3,000 MW) and transmission for the data center Entergy
  10. Hut 8 River Bend Campus LA
    Hut 8 announces it has secured 592 acres in West Feliciana Parish for River Bend DatacenterDynamics

About this count

This page counts the major projects the Census has researched and sourced: 2 as of Nov 6, 2026. It does not yet include every smaller colocation or enterprise facility, so the total number of buildings in Louisiana is higher. We add projects as they are announced or found in public filings.

Counties with tracked projects

Richland Parish · West Feliciana Parish

AI data centers in Louisiana

2 tracked projects here are counted as AI data centers: Meta Hyperion (under construction), Hut 8 River Bend Campus (under construction). All AI data centers →

Utilities serving tracked projects in Louisiana

Entergy Louisiana. Will data centers raise electric bills here? →

Follow Louisiana

RSS feed of Louisiana changes · Printable fact sheet · Embed this tracker · Projects near a ZIP code · Data center jobs near you

Louisiana data centers: common questions

How many data centers are in Louisiana?

The Census tracks 2 major data center projects in Louisiana as of Nov 6, 2026: 2 under construction. This counts large projects the Census has researched and sourced, not every smaller colocation or enterprise facility, so the total number of data center buildings in Louisiana is higher.

What is the largest data center project in Louisiana?

By published planned capacity, the largest tracked project in Louisiana is Meta Hyperion in Holly Ridge, Richland Parish, LA, at 5 GW. Its status is under construction.

Are data centers being built in Louisiana right now?

Yes. 2 tracked projects are under construction in Louisiana: Meta Hyperion, Hut 8 River Bend Campus.

How many jobs will data centers create in Louisiana?

2 tracked projects in Louisiana have a published permanent-jobs figure, adding up to 1,075 permanent jobs as announced. Announced jobs are promises, not guarantees; construction employment is typically much larger but temporary.

How many AI data centers are in Louisiana?

The Census counts 2 tracked projects in Louisiana as AI data centers, because their own sources describe them as built for AI: Meta Hyperion (under construction), Hut 8 River Bend Campus (under construction). That is a floor; other campuses may run AI workloads without their sources saying so.

Answers are generated from the sourced project records above and update when a record changes. Open any project for its sources.

Louisiana data center report card

Louisiana data center report card: 2 tracked projects, 5.33 GW of published capacity, 2 under construction.
  • Tracked projects2
  • Published capacity5.33 GW
  • Under construction2
  • Moratorium actions in the tracker0
  • Largest: Meta Hyperion5 GW

A square image of these figures, sized for Instagram, LinkedIn and slides. It is redrawn whenever a record changes, so the link always shows today’s numbers.

Download the image

Free to use with credit to Data Center Census (CC BY 4.0).

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in Louisiana. Retrieved from https://datacentercensus.com/us/louisiana
MLA“Data centers in Louisiana.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/us/louisiana.
Linkhttps://datacentercensus.com/us/louisiana

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.