Data center charts

9 charts drawn from the Census records on October 14, 2026, each free to download as PNG, SVG or CSV with the exact numbers. They redraw on every daily rebuild.

As of . Latest change in the record: . Rebuilt from the records on every deploy, daily.

Data center moratorium actions by month

Recorded pauses, extensions, rejections and reversals, last 24 months to Oct 14, 2026; the latest month is partial

Column chart: Data center moratorium actions by month. 24 months from Nov 24 to Oct 26; the latest month is 4, the highest is 24 in Sep 26.
Counts every recorded action by the vote date, else the date of its source; a month-only date counts in that month. One jurisdiction can appear more than once. Moratorium tracker. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
monthmoratorium actions
2024-110
2024-120
2025-010
2025-020
2025-031
2025-040
2025-051
2025-061
2025-071
2025-081
2025-091
2025-100
2025-111
2025-123
2026-011
2026-028
2026-039
2026-047
2026-055
2026-0620
2026-079
2026-0814
2026-0924
2026-104

Cite: Data Center Census. (2026, October 14). Data center moratorium actions by month [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#moratorium-actions-by-month

Tracked projects by month of first milestone

Projects whose earliest dated milestone falls in each month, last 24 months to Oct 14, 2026; the latest month is partial

Column chart: Tracked projects by month of first milestone. 24 months from Nov 24 to Oct 26; the latest month is 0, the highest is 14 in Mar 25.
A project is placed in the month of its earliest dated timeline entry. That is not always the month it was announced publicly. Projects whose earliest date is only a year are left out. Latest changes. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
monthprojects
2024-112
2024-122
2025-015
2025-022
2025-0314
2025-043
2025-053
2025-063
2025-075
2025-084
2025-098
2025-105
2025-116
2025-126
2026-0110
2026-027
2026-035
2026-046
2026-053
2026-062
2026-072
2026-080
2026-092
2026-100

Cite: Data Center Census. (2026, October 14). Tracked projects by month of first milestone [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#projects-by-first-milestone-month

Planned capacity by project status

Published capacity of 83 active projects, as of Oct 14, 2026

Horizontal bar chart: Planned capacity by project status. 4 bars from largest to smallest; the largest are Operating 4.18 GW, Under construction 70.16 GW, Approved 28.64 GW.
Proposed, approved, under-construction and operating projects that publish a capacity. 54 active projects publish none and are not estimated. Some figures are IT load, not total power. Capacity meter. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
statusplanned capacity mwprojects publishing capacity
operating4,1758
under_construction70,15633
approved28,64224
proposed23,100.618

Cite: Data Center Census. (2026, October 14). Planned capacity by project status [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#capacity-by-status

Tracked projects by state: top 15

Major U.S. data center projects with a sourced record, as of Oct 14, 2026

Horizontal bar chart: Tracked projects by state: top 15. 15 bars from largest to smallest; the largest are Texas 15, Virginia 14, Georgia 12.
Counts every status, including paused, cancelled and denied projects. It is a count of tracked projects, not of all data centers in a state. By state. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
statetracked projects
TX15
VA14
GA12
NY10
OH10
MI9
PA9
WI9
IL8
IN7
MO7
NC7
AZ4
FL4
MN4

Cite: Data Center Census. (2026, October 14). Tracked projects by state: top 15 [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#projects-by-state

Planned capacity by state: top 15

Published capacity of active projects, as of Oct 14, 2026

Horizontal bar chart: Planned capacity by state: top 15. 15 bars from largest to smallest; the largest are Texas 32.45 GW, West Virginia 11.76 GW, Ohio 11.49 GW.
Adds the first published capacity of each proposed, approved, under-construction and operating project. Projects that publish none are not estimated. Capacity meter. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
stateplanned capacity mwprojects publishing capacity
TX32,45012
WV11,7603
OH11,4904
UT9,0652
IL7,0647
PA6,7003
LA5,3302
GA4,3603
WY3,9502
MD3,2202
VA2,9045
NY2,861.67
OK2,7501
MO2,5003
NM2,4601

Cite: Data Center Census. (2026, October 14). Planned capacity by state: top 15 [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#capacity-by-state

Planned capacity: AI projects and all others

Published capacity of active projects, as of Oct 14, 2026

Horizontal bar chart: Planned capacity: AI projects and all others. 2 bars from largest to smallest; the largest are AI data center projects 68.38 GW, All other projects 57.69 GW.
AI projects are those whose own record shows they are built for AI (see the AI count page for the evidence). Active means proposed, approved, under construction or operating. AI data center count. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
groupplanned capacity mw
ai68,379.6
other57,694

Cite: Data Center Census. (2026, October 14). Planned capacity: AI projects and all others [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#ai-vs-other-capacity

Top developers by planned capacity

Active projects that publish a capacity, as of Oct 14, 2026

Horizontal bar chart: Top developers by planned capacity. 12 bars from largest to smallest; the largest are Fermi America 17 GW, SB Energy 11.2 GW, SoftBank 11.2 GW.
A joint project counts in full for each developer named, so these figures overlap and do not add up to the pipeline total. By company. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
developerplanned capacity mwprojects publishing capacity
fermi-america17,0001
sb-energy11,2002
softbank11,2002
oleary-digital9,0001
meta8,2205
nscale8,0001
sailfish-investors5,0001
homer-city-redevelopment4,4001
google3,7003
stack-infrastructure3,4602
openai3,2101
vantage-data-centers2,7002

Cite: Data Center Census. (2026, October 14). Top developers by planned capacity [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#top-developers-by-capacity

Tracked projects by status

All 170 tracked projects, as of Oct 14, 2026

Horizontal bar chart: Tracked projects by status. 8 bars from largest to smallest; the largest are Rumored 6, Proposed 34, Approved 44.
Status is the latest status shown by the cited sources. See the methodology for the definitions. Project register. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
statusprojects
rumored6
proposed34
approved44
under_construction46
operating13
paused8
cancelled12
denied7

Cite: Data Center Census. (2026, October 14). Tracked projects by status [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#projects-by-status

Moratorium actions by state: top 15

Recorded actions, all dates, as of Oct 14, 2026

Horizontal bar chart: Moratorium actions by state: top 15. 15 bars from largest to smallest; the largest are Ohio 15, North Carolina 13, Georgia 11.
One jurisdiction can appear more than once (adopted, then extended). Statewide actions count under their state. Moratorium tracker. Source: Data Center Census, as of . CC BY 4.0: reuse with credit to Data Center Census and a link to this page.

Download PNG Download SVG Download CSV

Data table
statemoratorium actions
OH15
NC13
GA11
CA8
MI8
NY8
MD5
IN4
MN4
SC4
TX4
FL3
IL3
KY3
WI3

Cite: Data Center Census. (2026, October 14). Moratorium actions by state: top 15 [Chart]. Retrieved Month D, YYYY, from https://datacentercensus.com/charts#moratorium-actions-by-state

Using these charts

Charts are licensed CC BY 4.0: use them in articles, slides and reports with the credit already printed in the image, “Data Center Census” and its web address. The PNG has a light background for print and slides; the SVG follows a reader’s light or dark setting. Each CSV holds the exact numbers drawn. Counts describe tracked projects with a sourced record, not every data center. For headline numbers see statistics; for a place, a fact sheet.

Cite this page

Last updated Oct 14, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data center charts. Retrieved from https://datacentercensus.com/charts
MLA“Data center charts.” Data Center Census, Oct 14, 2026, https://datacentercensus.com/charts.
Linkhttps://datacentercensus.com/charts

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.