The Census tracks 4 major data center projects in Arizona, with 1.04 GW of planned capacity: 1 approved, 3 under construction.

How many data centers are in Arizona?

The Census tracks 4 major data center projects in Arizona as of Nov 6, 2026: 1 approved, 3 under construction. That covers major sourced projects, not every smaller facility. The largest by planned capacity is Project Borealis (300 MW). Latest change, at Project Blue: Arizona water officials' approval of the two wells is reported (May 28, 2026).

Projects tracked
4
Planned capacity, active projects
1.04GW
Under construction
3
Permanent jobs promised
330
RumoredProposedApprovedUnder constructionOperatingPausedCancelledDenied© OpenFreeMap © OpenStreetMap

Arizona data center projects

ProjectStatusCapacityDeveloperLast update
Project Borealis
Mesa, Maricopa County
Approved 300 MW Novva Data Centers Feb 3, 2025
Project Blue
Tucson, Pima County
Under construction 286 MW Beale Infrastructure May 28, 2026
Prime Phoenix Campus
Avondale
Under construction 240 MW Prime Data Centers May 21, 2026
Compass Datacenters Goodyear Campus
Goodyear, Maricopa County
Under construction 212 MW Compass Datacenters Dec 8, 2023

Recent changes in Arizona

  1. Project Blue AZ
    Arizona water officials' approval of the two wells is reported AZPM
  2. Prime Phoenix Campus AZ
    Prime breaks ground on three buildings; Buildings 1–3 secured by a leading hyperscaler Prime Data Centers
  3. Project Blue AZ
    Construction underway as dozens protest at the site AZ Luminaria
  4. Project Blue AZ
    Superior Court Judge Brenden Griffin dismisses No Desert Data Center Coalition's open-meeting lawsuit; plaintiffs planned appeal AZPM
  5. Project Blue AZ
    Arizona Attorney General files appeal in Maricopa County Superior Court challenging the ACC's approval of the TEP–Beale agreement Arizona Attorney General's Office
  6. Project Blue AZ
    No Desert Data Center Coalition sues Pima County in Superior Court alleging Open Meeting Law violations in the rezoning AZPM
  7. Project Blue AZ
    Beale-affiliated Bobcat Tucson Water LLC applies to ADWR for two commercial groundwater wells AZPM
  8. Project Blue AZ
    Arizona Corporation Commission approves TEP agreement 4-1 AZ Luminaria
  9. Project Blue AZ
    Beale and TEP file special power agreement with Arizona Corporation Commission AZ Luminaria
  10. Project Blue AZ
    Tucson City Council votes to end annexation negotiations, cutting off Tucson Water AZ Luminaria

About this count

This page counts the major projects the Census has researched and sourced: 4 as of Nov 6, 2026. It does not yet include every smaller colocation or enterprise facility, so the total number of buildings in Arizona is higher. We add projects as they are announced or found in public filings.

Counties with tracked projects

Maricopa County · Pima County

Data center rules in Arizona

  • Phoenix: Zoning Ordinance update for data centersadopted
  • Chandler: Ordinance No. 5033 (data center zoning amendment)in effect
  • Tucson: Ordinance regulating large quantity water usersadopted

All local rules →

Utilities serving tracked projects in Arizona

Tucson Electric Power · Arizona Public Service (APS). Will data centers raise electric bills here? →

Follow Arizona

RSS feed of Arizona changes · Printable fact sheet · Embed this tracker · Projects near a ZIP code · Data center jobs near you

Arizona data centers: common questions

How many data centers are in Arizona?

The Census tracks 4 major data center projects in Arizona as of Nov 6, 2026: 1 approved, 3 under construction. This counts large projects the Census has researched and sourced, not every smaller colocation or enterprise facility, so the total number of data center buildings in Arizona is higher.

What is the largest data center project in Arizona?

By published planned capacity, the largest tracked project in Arizona is Project Borealis in Mesa, Maricopa County, AZ, at 300 MW. Its status is approved.

Are data centers being built in Arizona right now?

Yes. 3 tracked projects are under construction in Arizona: Project Blue, Prime Phoenix Campus, Compass Datacenters Goodyear Campus.

How many jobs will data centers create in Arizona?

2 tracked projects in Arizona have a published permanent-jobs figure, adding up to 330 permanent jobs as announced. Announced jobs are promises, not guarantees; construction employment is typically much larger but temporary.

Answers are generated from the sourced project records above and update when a record changes. Open any project for its sources.

Arizona data center report card

Arizona data center report card: 4 tracked projects, 1.04 GW of published capacity, 3 under construction.
  • Tracked projects4
  • Published capacity1.04 GW
  • Under construction3
  • Moratorium actions in the tracker1
  • Largest: Project Borealis300 MW

A square image of these figures, sized for Instagram, LinkedIn and slides. It is redrawn whenever a record changes, so the link always shows today’s numbers.

Download the image

Free to use with credit to Data Center Census (CC BY 4.0).

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in Arizona. Retrieved from https://datacentercensus.com/us/arizona
MLA“Data centers in Arizona.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/us/arizona.
Linkhttps://datacentercensus.com/us/arizona

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.