Compass Statesville

Statesville, Iredell County, NCDeveloper: Compass Datacenters

Also known as Stamey Farm Road data center

ApprovedRezoning approved September 2025; the city says it is exempt from the 180-day data center moratorium adopted in September 2026
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

Dallas-based Compass Datacenters plans five data center buildings totaling 1.34 million square feet on about 333 acres on Stamey Farm Road in Statesville, with power from a nearby Duke Energy substation. The Statesville City Council approved the rezoning 8-0 in September 2025. The city says the previously approved project is exempt from a moratorium on new data center applications; the council adopted a 180-day moratorium on Sept. 14, 2026, which WBTV reports does not affect previously approved data centers.

Permanent jobs (promised)
200
about 200

Key facts

Size & schedule

Planned capacity500 MW [1]
site marketed by JLL with up to 500MW of power capacity
Source excerpt
“up to 500MW of power capacity”
Floor area1,340,000 sq ft [1]
Source excerpt
“five data center buildings spanning a total of 1.34 million square feet”
Buildings5 [1]
Source excerpt
“five data center buildings spanning a total of 1.34 million square feet”
Permanent jobs (promised)200 [3]
about 200
Source excerpt
“The center will have about 200 well-paying engineering, electrical and other jobs”

How big is that? Data center sizes compared with football fields and Central Park.

Power

UtilityDuke Energy [1]
Source excerpt
“located nearby to a Duke Energy substation, which would provide power to the site”
Backup generators40 backup generators per building [3]
Source excerpt
“Each building would include 40 backup generators in case of power outages”

Water

Coolingair-cooled [1]
later reporting cites a closed-loop hybrid system
Source excerpt
“the data center will be air-cooled to reduce water usage”
Coolingclosed-loop hybrid cooling (developer-stated) [3]
differs from earlier air-cooled description
Source excerpt
“a closed-loop, hybrid cooling system that recycles the same water”

Local decisions & site

Deciding voteStatesville City Council approved rezoning 8-0 in September 2025 [3]
Source excerpt
“8-0 vote to rezone the land”
ZoningAnnexation into city limits and a site-specific conditional zoning district [4]
Source excerpt
“That project required annexation into the city limits and the establishment of a very specific conditional zoning district, including site-specific development standards.”

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Planned capacity500 MW [1]
UtilityDuke Energy [1]

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Timeline

  1. Statesville Planning Board votes 6-0 to recommend the rezoning [2]

  2. Compass proposes a five-building campus on Stamey Farm Road [1]

  3. Statesville City Council approves the rezoning 8-0 [3]

  4. Statesville City Council unanimously approves a 180-day moratorium on new data centers in the city; WBTV reports it will not affect previously approved data centers [5]

Issues raised

  • Residents at the public hearing raised concerns about environmental impact, noise and pollution [3]

Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.

Sources

  1. Compass Datacenters proposes 333-acre campus in Statesville, North Carolina
    DatacenterDynamics · Aug 18, 2025 · news
  2. Government Board Backs Massive Data Center in Rural N.C.
    GovTech (The Charlotte Observer) · Aug 27, 2025 · news
  3. Despite Protests, North Carolina City Approves Data Center
    GovTech (The Charlotte Observer) · Sep 16, 2025 · news
  4. Why the City of Statesville Is Considering a Proposed Data Center Moratorium
    City of Statesville · Aug 20, 2026 · government
  5. Statesville unanimously approves 180-day moratorium on data centers: What we know
    WBTV · Sep 15, 2026 · news

Cite this page

Last updated Sep 24, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Compass Statesville. Retrieved from https://datacentercensus.com/dc/compass-statesville-nc
MLA“Compass Statesville.” Data Center Census, Sep 24, 2026, https://datacentercensus.com/dc/compass-statesville-nc.
Linkhttps://datacentercensus.com/dc/compass-statesville-nc

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.