Compass Statesville

Also known as Stamey Farm Road data center

ApprovedRezoning approved September 2025; exempt from Statesville's proposed 2026 data center moratorium
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

Dallas-based Compass Datacenters plans five data center buildings totaling 1.34 million square feet on about 333 acres on Stamey Farm Road in Statesville, with power from a nearby Duke Energy substation. The Statesville City Council approved the rezoning 8-0 in September 2025. The city says the previously approved project is exempt from a proposed 150-day moratorium on new data center applications.

Key facts

Size & schedule

Planned capacity500 MW [1]
site marketed by JLL with up to 500MW of power capacity
Source excerpt
“up to 500MW of power capacity”
Floor area1.3 million sq ft [1]
Source excerpt
“five data center buildings spanning a total of 1.34 million square feet”
Buildings5 [1]
Source excerpt
“five data center buildings spanning a total of 1.34 million square feet”
Permanent jobs (promised)200 [3]
about 200
Source excerpt
“The center will have about 200 well-paying engineering, electrical and other jobs”

Power

UtilityDuke Energy [1]
Source excerpt
“located nearby to a Duke Energy substation, which would provide power to the site”
Backup generators40 backup generators per building [3]
Source excerpt
“Each building would include 40 backup generators in case of power outages”

Water

Coolingair-cooled [1]
later reporting cites a closed-loop hybrid system
Source excerpt
“the data center will be air-cooled to reduce water usage”
Coolingclosed-loop hybrid cooling (developer-stated) [3]
differs from earlier air-cooled description
Source excerpt
“a closed-loop, hybrid cooling system that recycles the same water”

Local decisions & site

Deciding voteStatesville City Council approved rezoning 8-0 in September 2025 [3]
Source excerpt
“8-0 vote to rezone the land”
ZoningAnnexation into city limits and a site-specific conditional zoning district [4]
Source excerpt
“That project required annexation into the city limits and the establishment of a very specific conditional zoning district, including site-specific development standards.”

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Timeline

  1. Statesville Planning Board votes 6-0 to recommend the rezoning [2]

  2. Compass proposes a five-building campus on Stamey Farm Road [1]

  3. Statesville City Council approves the rezoning 8-0 [3]

Issues raised

  • Residents at the public hearing raised concerns about environmental impact, noise and pollution [3]

Sources

  1. Compass Datacenters proposes 333-acre campus in Statesville, North Carolina
    DatacenterDynamics · Aug 18, 2025 · news
  2. Government Board Backs Massive Data Center in Rural N.C.
    GovTech (The Charlotte Observer) · Aug 27, 2025 · news
  3. Despite Protests, North Carolina City Approves Data Center
    GovTech (The Charlotte Observer) · Sep 16, 2025 · news
  4. Why the City of Statesville Is Considering a Proposed Data Center Moratorium