Statesville, Iredell County, NC
Compass Statesville
Also known as Stamey Farm Road data center
ApprovedRezoning approved September 2025; exempt from Statesville's proposed 2026 data center moratorium
- Rumored
- Proposed
- Approved
- Under construction
- Operating
Dallas-based Compass Datacenters plans five data center buildings totaling 1.34 million square feet on about 333 acres on Stamey Farm Road in Statesville, with power from a nearby Duke Energy substation. The Statesville City Council approved the rezoning 8-0 in September 2025. The city says the previously approved project is exempt from a proposed 150-day moratorium on new data center applications.
Key facts
Size & schedule
| Planned capacity | 500 MW [1] site marketed by JLL with up to 500MW of power capacity Source excerpt“up to 500MW of power capacity” |
|---|---|
| Floor area | 1.3 million sq ft [1]Source excerpt“five data center buildings spanning a total of 1.34 million square feet” |
| Buildings | 5 [1]Source excerpt“five data center buildings spanning a total of 1.34 million square feet” |
| Permanent jobs (promised) | 200 [3] about 200 Source excerpt“The center will have about 200 well-paying engineering, electrical and other jobs” |
Power
| Utility | Duke Energy [1]Source excerpt“located nearby to a Duke Energy substation, which would provide power to the site” |
|---|---|
| Backup generators | 40 backup generators per building [3]Source excerpt“Each building would include 40 backup generators in case of power outages” |
Water
| Cooling | air-cooled [1] later reporting cites a closed-loop hybrid system Source excerpt“the data center will be air-cooled to reduce water usage” |
|---|---|
| Cooling | closed-loop hybrid cooling (developer-stated) [3] differs from earlier air-cooled description Source excerpt“a closed-loop, hybrid cooling system that recycles the same water” |
Local decisions & site
| Deciding vote | Statesville City Council approved rezoning 8-0 in September 2025 [3]Source excerpt“8-0 vote to rezone the land” |
|---|---|
| Zoning | Annexation into city limits and a site-specific conditional zoning district [4]Source excerpt“That project required annexation into the city limits and the establishment of a very specific conditional zoning district, including site-specific development standards.” |
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
Issues raised
- Residents at the public hearing raised concerns about environmental impact, noise and pollution [3]
Sources
- Compass Datacenters proposes 333-acre campus in Statesville, North CarolinaDatacenterDynamics · Aug 18, 2025 · news
- Government Board Backs Massive Data Center in Rural N.C.GovTech (The Charlotte Observer) · Aug 27, 2025 · news
- Despite Protests, North Carolina City Approves Data CenterGovTech (The Charlotte Observer) · Sep 16, 2025 · news
- Why the City of Statesville Is Considering a Proposed Data Center MoratoriumCity of Statesville · Aug 20, 2026 · government