North Country Colocation Services Massena Expansion
Massena, St. Lawrence County, NY
Also known as NCCS Massena, NYDIG Massena expansion, Reynolds site data center
- Rumored
- Proposed
- Approved
- Under construction
- Operating
North Country Colocation Services, an affiliate of the New York Digital Investment Group, has operated at the former Reynolds Metals aluminum site in Massena since 2017 and proposes a 635-megawatt expansion on about 355 developable acres next to its existing 110-acre campus, powered by St. Lawrence River hydroelectricity. The plan was scaled back during review from three buildings totaling roughly 1.5 million square feet to two data halls of about 1.1 million square feet, with backup generators cut from 316 to 124 and cooling changed to a closed-loop system after an earlier version described withdrawing about 2.6 million gallons a day from the river. St. Lawrence County planners called an early site plan premature, and the Massena Town Board rejected a proposed moratorium in a split vote.
- Planned capacity
- 635 MW
- Permanent jobs (promised)
- 200
Key facts
Size & schedule
| Planned capacity | 635 MW [2]Source excerpt“Approximately 635 megawatts” |
|---|---|
| Site size | 355 acres [3] developable acres adjacent to the existing 110-acre site Source excerpt“355 developable acres adjacent to existing site” |
| Floor area | 1.1 million sq ft [3] two data halls in the revised plan, down about 400,000 sq ft from the original three-building proposal Source excerpt“Approximately 1.1 million sq ft” |
| Buildings | 2 [3] reduced from three during review |
| Permanent jobs (promised) | 200 [3]Source excerpt“approximately 200 permanent positions post-completion” |
| Construction jobs | 2,500 [3] peak construction workforce stated as 1,800 to 2,500 Source excerpt“Peak construction workforce of 1,800-2,500” |
Power
| Power supply | Hydroelectric power from the St. Lawrence River [3]Source excerpt“635MW, sourced from hydroelectric power on the St. Lawrence River” |
|---|---|
| Backup generators | 124, reduced from 316 during review [3]Source excerpt“reduced by approximately 61 percent (from 316 to 124)” |
Water
| Cooling | Closed-loop, with no withdrawals or discharges to local waterways for non-contact cooling in the revised plan [3] |
|---|
Local decisions & site
| Parcel / address | Former Reynolds Metals plant, built 1958, later owned by Alcoa, whose aluminum smelter closed in 2014 [3] |
|---|
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
NCCS begins operating at the Reynolds industrial site in Massena, on about 110 acres [3]
St. Lawrence County Planning Board chairman Vance Fleury calls the site plan premature, with too many unanswered questions; an earlier version described about 2.6 million gallons a day of river withdrawals and three buildings of 562,000, 612,000 and 400,000 sq ft [2]
Local reporting counts about ten data center proposals under discussion in the Massena area, with this one furthest along [1]
Massena Town Planning Board holds a pre-submission meeting to discuss consultants and determine the lead agency for environmental review [3]
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more [4]
Issues raised
- An earlier version of the plan described peak withdrawals of about 2.6 million gallons a day from the river, about 1.1 million gallons a day of liquid waste discharge and roughly 1.5 million gallons a day lost to evaporation; the revised plan describes closed-loop cooling [2][3]
- St. Lawrence County planners said the early site plan raised more questions than it answered [2]
- The Massena Town Board rejected a data center moratorium in a split vote, unlike several other upstate towns [5]
- St. Lawrence County passed a resolution in June 2026 affirming local authority and urging municipalities to consider moratoriums, but did not adopt one itself [6]
- Local reporting cautions that the roughly ten proposals under discussion in Massena represent prospective activity, not commitments [1]
Sources
- Massena sees 10 data center proposalsWWNY 7 News · May 27, 2026 · news
- County Planning Board: Massena data center site plan contains more questions than answersNNY360 / Watertown Daily Times · May 18, 2026 · news
- NYDIG looks to expand data center at Massena site, New YorkDatacenterDynamics · Jul 7, 2026 · news
- Executive Order No. 62: Establishing a Temporary Moratorium on Data Centers in New YorkOffice of the Governor of New York · Jul 14, 2026 · government
- Massena votes down proposed data center moratorium in split voteNorth Country Now · news
- Updates on the Cloud: More Moratoriums on Data CentersRockefeller Institute of Government · Jun 10, 2026 · other
- North Country Colocation ServicesNCCS · company
Cite this page
Last updated Sep 22, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). North Country Colocation Services Massena Expansion. Retrieved from https://datacentercensus.com/dc/nccs-massena-expansion-ny |
|---|---|
| MLA | “North Country Colocation Services Massena Expansion.” Data Center Census, Sep 22, 2026, https://datacentercensus.com/dc/nccs-massena-expansion-ny. |
| Link | https://datacentercensus.com/dc/nccs-massena-expansion-ny |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.