Remington Site Data Center
Ilion, Herkimer County, NY
Also known as Turin Hoefler Avenue data center, Ilion Remington Site C
- Rumored
- Proposed
- Approved
- Under construction
- Operating
Turin Hoefler Avenue LLC proposes converting part of the former Remington Arms plant at 14 Hoefler Avenue in Ilion into AI data centers, after the 207-year-old gun factory closed in March 2024 and the 32-acre, 1.1-million-square-foot complex changed hands. Reporting describes two 250,000-square-foot data centers on Sites C and E totaling about 200 megawatts, with a substation planned on Site D and some existing buildings demolished, at an estimated cost of $2 billion to $3 billion. The developer has filed a Brownfield Cleanup Program application with the state Department of Environmental Conservation; an environmental assessment found contamination at the site.
- Planned capacity
- 200 MW
- combined across the two proposed buildings
- Site size
- 32 acres
Key facts
Size & schedule
| Planned capacity | 200 MW [1] combined across the two proposed buildings Source excerpt“Total capacity: 200 MW” |
|---|---|
| Site size | 32 acres [1]Source excerpt“Site size: 32 acres” |
| Floor area | 500,000 sq ft [1] two data centers of 250,000 sq ft each, on Sites C and E within a 1.1 million sq ft complex Source excerpt“Two 250,000 sq ft data centers (Sites C and E)” |
| Buildings | 2 [1] |
| Stated investment | $2.5 billion [1] reported estimate of $2 billion to $3 billion Source excerpt“$2-3 billion (estimated)” |
Local decisions & site
| Zoning | Brownfield Cleanup Program application filed with the New York State DEC [1]Source excerpt“Brownfield Cleanup Program (BCP) application filed with New York Department of Environmental Conservation” |
|---|---|
| Parcel / address | Former Remington Arms manufacturing plant, 14 Hoefler Avenue, Ilion [1]Source excerpt“14 Hoefler Avenue” |
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
Remington announces it will close the Ilion plant, ending more than two centuries of arms manufacturing in the village [4]
Remington Arms closes the Ilion factory, which employed about 300 people; the property is later sold to Turin Hoefler Avenue LLC [1]
An environmental assessment of the Remington Arms site finds contamination [3]
Reporting describes plans for two 250,000 sq ft data centers totaling 200 MW on the former plant site, with an online petition against the proposal gathering more than 150 signatures [1]
Gov. Kathy Hochul signs Executive Order No. 62, pausing state DEC permits for data centers of 50 MW or more [5]
Issues raised
- An environmental assessment of the former arms plant found contamination, and the developer has entered the state Brownfield Cleanup Program [1][3]
- A local online petition opposing the proposal had gathered more than 150 signatures by April 2026 [1]
- The closure of the Remington plant in March 2024 cost the village roughly 300 jobs, which frames the local economic argument for reuse [1][4]
- At 200 MW the project falls above the 50 MW threshold in the July 2026 state executive order pausing DEC permits [5]
Sources
- Former Remington gun factory in New York set to become 200MW data centerDatacenterDynamics · Apr 20, 2026 · news
- 250,000-square-foot AI data center planned for Ilion's Remington Site CWKTV · news
- Remington Arms environmental assessment finds contaminationNew York Almanack · Apr 2026 · news
- Remington to close Ilion facility in MarchWAMC Northeast Public Radio · Dec 1, 2023 · news
- Executive Order No. 62: Establishing a Temporary Moratorium on Data Centers in New YorkOffice of the Governor of New York · Jul 14, 2026 · government
- Proposed data center planned for former Remington site in IlionRome Sentinel · news
Cite this page
Last updated Sep 22, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Remington Site Data Center. Retrieved from https://datacentercensus.com/dc/remington-site-ilion-ny |
|---|---|
| MLA | “Remington Site Data Center.” Data Center Census, Sep 22, 2026, https://datacentercensus.com/dc/remington-site-ilion-ny. |
| Link | https://datacentercensus.com/dc/remington-site-ilion-ny |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.