A 1,500-acre, roughly 4 million-square-foot Meta data center campus in the LEAP Innovation and Research District in Lebanon, Indiana, which Meta says represents more than $10 billion of investment. DCD reports it as a 1 GW campus using closed-loop liquid cooling. Construction began in February 2026, with the first phase targeted for late 2027 or early 2028.
- Site size
- 1,500 acres[1]
- Permanent jobs (promised)
- 300
Key facts
Size & schedule
| Planned capacity | 1 GW [5] 1 GW, per DCD |
|---|---|
| Site size | 1,500 acres [1] |
| Floor area | 4 million sq ft [3] roughly 4 million sq ft |
| Buildings | 13 [1] 10 data center buildings plus logistics, warehousing and administrative buildings (Feb 2026); the Aug 2025 city plan listed 15 buildings including 12 data centers |
| Stated investment | $10 billion [3] more than $10 billion, per Meta |
| Permanent jobs (promised) | 300 [3] |
| Construction jobs | 4,000 [3] at peak |
| Target completion | First phase late 2027 or early 2028 [1] |
How big is that? Data center sizes compared with football fields and Central Park.
Power
| On-site generation | 134 MW [8] temporary gas-fired generation by Life Cycle Power, expected through end of 2027 Source excerpt“Texas-based Life Cycle Power submitted an air emissions permit to the Indiana Department of Environmental Management in February detailing plans to supply 134 megawatts of power via gas-fired generators to the data facility.” |
|---|---|
| On-site generation type | temporary natural gas-fired generators (65 requested in permit application; company expects about 32) [8]Source excerpt“LCP's permit application requests placing 65 generators on site, but Bland told IndyStar there will likely only be 32 generators because the data center is closer than anticipated to hooking up to the regional power grid.” |
| Air permit | Life Cycle Power submitted an IDEM air emissions permit application in February for gas-fired generators [8] |
Water
| Water use | 3,000,000 gal/day [6] 2031 average allocation projection (8 million peak); current allocation 320,000 gal/day average |
|---|---|
| Water source | Eagle Creek Reservoir and other sources piped to LEAP district, per News and Tribune [6] |
| Cooling | closed-loop, direct-to-chip liquid cooling with dry coolers [6] |
Money & incentives
| Tax incentives | 10-year, 50% real property tax abatement and 35-year, 100% personal property tax abatement (city); state sales tax exemption [4] |
|---|---|
| Payments / community benefits | Yearly $1.5 million community impact payment (reported) [4]Source excerpt“META will reportedly pay a yearly $1.5 million community impact payment.” |
Local decisions & site
| Parcel / address | North and south of State Road 32 between County Roads 250 West and 400 West [4]Source excerpt“north and south of State Road 32 between County Roads 250 West and 400 West” |
|---|
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Water and power
Water
Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.
Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →
Timeline
Lebanon City Council approves tax abatements for the project (codename Project Domino) [4]
City reports planning commission approval of the 1,500-acre, 15-building plan [4]
Meta confirms the project and holds groundbreaking; investment stated as more than $10 billion [2]
Meta announces its next data center will be in Lebanon, Indiana. [3]
Issues raised
- Nearby residents and water researchers have raised concerns about water depletion and the load shifted to power providers [6]
- Meta says it will pay full energy and water/wastewater costs and restore 100% of consumed water to local watersheds [2][3]
Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.
Sources
- Details on long-expected Meta data center campus unveiledIndiana Capital Chronicle · Feb 11, 2026 · news
- Meta Makes Lebanon Data Center Announcement OfficialCity of Lebanon · Feb 11, 2026 · government
- Hello, Lebanon!Meta · Feb 11, 2026 · company
- Meta Moves Forward in LebanonCity of Lebanon · Aug 21, 2025 · government
- Meta announces 1GW data center campus in IndianaDatacenterDynamics · Feb 11, 2026 · news
- Meta's Lebanon data center to use less water than expected, but concerns persistNews and Tribune · news
- Meta breaks ground on new $10B data center campus at LEAP in LebanonThe Reporter · Feb 11, 2026 · news
- Meta data center in Lebanon plans temporary off-grid gas facilityIndyStar (via AOL) · Jul 16, 2026 · news
Cite this page
Last updated Sep 23, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Meta Lebanon Data Center. Retrieved from https://datacentercensus.com/dc/meta-lebanon-in |
|---|---|
| MLA | “Meta Lebanon Data Center.” Data Center Census, Sep 23, 2026, https://datacentercensus.com/dc/meta-lebanon-in. |
| Link | https://datacentercensus.com/dc/meta-lebanon-in |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.