The Census tracks 2 major data center projects in Alabama, with 2.7 GW of planned capacity: 2 approved.

How many data centers are in Alabama?

The Census tracks 2 major data center projects in Alabama as of Nov 6, 2026: 2 approved. That covers major sourced projects, not every smaller facility. The largest by planned capacity is Project Red Clay (1.5 GW). Latest change, at Project Red Clay: Local TV reports residents' opposition after the approval; the commission chairman calls the deal a win for the county (Oct 15, 2026).

Projects tracked
2
Planned capacity, active projects
2.7GW
Under construction
0
Permanent jobs promised
225
RumoredProposedApprovedUnder constructionOperatingPausedCancelledDenied© OpenFreeMap © OpenStreetMap

Alabama data center projects

ProjectStatusCapacityDeveloperLast update
Project Red Clay
Hayneville, Lowndes County
Approved 1.5 GW Cloverleaf Infrastructure Oct 15, 2026
Project Marvel
Bessemer, Jefferson County
Approved 1.2 GW QTS Data Centers, TPA Group Sep 22, 2026

Recent changes in Alabama

  1. Project Red Clay AL
    Local TV reports residents' opposition after the approval; the commission chairman calls the deal a win for the county WAKA 8
  2. Project Red Clay AL
    Southern Environmental Law Center criticizes the vote for lacking public notice and comment and raises water, power and wastewater questions Southern Environmental Law Center
  3. Project Red Clay AL
    Lowndes County Commission votes 3-2 to approve tax abatements for the project in a short meeting; the item was not on the posted agenda GovTech (reprinting al.com)
  4. Project Marvel AL
    Mayor Kenneth Gulley, who backed Project Marvel, loses the mayoral runoff to former council member Louise Alexander, 54.53% to 45.47%, after an election season the Birmingham Free Press describes as dominated by the project Birmingham Free Press
  5. Project Marvel AL
    Two of the five Bessemer City Council members who voted for the Project Marvel rezoning lose their seats in the August municipal elections, according to the Birmingham Free Press Birmingham Free Press
  6. Project Marvel AL
    NDA released showing officials had to destroy confidential records when it expires or when the developer asks WBHM / Inside Climate News
  7. Project Marvel AL
    QTS confirms plans for the data center campus WBRC
  8. Project Marvel AL
    Judge David Hobdy dismisses the residents' rezoning lawsuit with prejudice WBRC
  9. Project Marvel AL
    Council approves rezoning of 914 acres, allowing 18 data center structures across an expanded footprint ABC 33/40
  10. Project Marvel AL
    Bessemer City Council gives final approval to the Project Marvel rezoning DatacenterDynamics

About this count

This page counts the major projects the Census has researched and sourced: 2 as of Nov 6, 2026. It does not yet include every smaller colocation or enterprise facility, so the total number of buildings in Alabama is higher. We add projects as they are announced or found in public filings.

Counties with tracked projects

Jefferson County · Lowndes County

Community concerns

3 concerns documented in public sources about 1 project here →

Water and power

1 of the 2 tracked projects here has a disclosed water figure (1 in all), with sources and what each figure measures.

Utilities serving tracked projects in Alabama

Alabama Power. Will data centers raise electric bills here? →

Follow Alabama

RSS feed of Alabama changes · Printable fact sheet · Embed this tracker · Projects near a ZIP code · Data center jobs near you

Alabama data centers: common questions

How many data centers are in Alabama?

The Census tracks 2 major data center projects in Alabama as of Nov 6, 2026: 2 approved. This counts large projects the Census has researched and sourced, not every smaller colocation or enterprise facility, so the total number of data center buildings in Alabama is higher.

What is the largest data center project in Alabama?

By published planned capacity, the largest tracked project in Alabama is Project Red Clay in Hayneville, Lowndes County, AL, at 1.5 GW. Its status is approved.

Are data centers being built in Alabama right now?

No tracked project in Alabama is currently recorded as under construction. 2 are proposed or approved.

How many jobs will data centers create in Alabama?

1 tracked project in Alabama has a published permanent-jobs figure, adding up to 225 permanent jobs as announced. Announced jobs are promises, not guarantees; construction employment is typically much larger but temporary.

Answers are generated from the sourced project records above and update when a record changes. Open any project for its sources.

Alabama data center report card

Alabama data center report card: 2 tracked projects, 2.7 GW of published capacity, 0 under construction.
  • Tracked projects2
  • Published capacity2.7 GW
  • Under construction0
  • Moratorium actions in the tracker0
  • Largest: Project Red Clay1.5 GW

A square image of these figures, sized for Instagram, LinkedIn and slides. It is redrawn whenever a record changes, so the link always shows today’s numbers.

Download the image

Free to use with credit to Data Center Census (CC BY 4.0).

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in Alabama. Retrieved from https://datacentercensus.com/us/alabama
MLA“Data centers in Alabama.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/us/alabama.
Linkhttps://datacentercensus.com/us/alabama

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.