Project Mica
Kansas City, Clay County, MODeveloper: Google
Also known as Google Project Mica
- Rumored
- Proposed
- Approved
- Under construction
- Operating
Project Mica is Google's second Kansas City-area data center campus, planned as five hyperscale buildings on nearly 500 acres at the northeast corner of Interstate 435 and Highway 169 in the Northland. Port KC authorized up to $10 billion in taxable revenue bonds for the project in July 2025, along with a 25-year, 75% property tax exemption. Google confirmed in February 2026 that construction is underway.
- Site size
- 500 acres
- nearly 500 acres
Key facts
Size & schedule
| Planned capacity | 700 MW [1] nearly 700 MW at full development, per Port KC Source excerpt“The full development will draw nearly 700 MW of power” |
|---|---|
| Planned capacity | 500 MW [2] up to 500 MW at full capacity, per Axios; differs from Port KC figure Source excerpt“At full capacity, the data center campus could require up to 500 megawatts of power, enough to supply roughly 400,000 homes.” |
| Site size | 500 acres [1] nearly 500 acres Source excerpt“Spanning nearly 500 acres at the northeast corner of Interstate 435 and Highway 169” |
| Floor area | 1.6 million sq ft [1] five hyperscale data center buildings totaling 1.56 million square feet Source excerpt“five hyperscale data center buildings, totaling 1.56 million square feet” |
| Buildings | 5 [1]Source excerpt“the project will include the construction of five hyperscale data center buildings, totaling 1.56 million square feet” |
| Stated investment | $10 billion [2] reported as a $10 billion, 500-acre campus; Port KC approved the funds in revenue bonds Source excerpt“One of the biggest tech investments in Kansas City history is coming to the Northland in the form of a $10 billion, 500-acre data center campus.” |
| Construction jobs | 1,000 [2] more than 1,000 skilled tradespeople over time Source excerpt“More than 1,000 skilled tradespeople will be employed over time as the campus is built.” |
Power
| Power supply | Adjacent Nashua Power Station and onsite substations [1]Source excerpt“supplied by the adjacent Nashua Power Station and onsite substations.” |
|---|
Money & incentives
| Tax incentives | 25-year, 75% property tax exemption and 100% exemptions on local and state sales taxes for construction materials and equipment [1]Source excerpt“a 25-year, 75% exemption on property taxes, as well as 100% exemptions on local and state sales taxes for construction materials and equipment.” |
|---|---|
| Abatement term | 25 years [1] 75% property tax exemption Source excerpt“a 25-year, 75% exemption on property taxes” |
| Payments / community benefits | $1.75 million in upfront funding for local workforce development [2]Source excerpt“Project Mica will bring $1.75 million in upfront funding for local workforce development.” |
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
Issues raised
- Reported power demand differs: Port KC says nearly 700 MW, Axios reported up to 500 MW [1][2]
- Google says it will cover the full energy costs of powering its Kansas City-area campuses under an agreement with Evergy [4]
- KC Water reviews projected water usage from large developments; Google says site-level water use will be reported in its Environmental Report once the campus is operational [5]
Sources
- Project MicaPort KC · Aug 11, 2025 · government
- Port KC backs $10B data hub that could reshape Kansas City's NorthlandAxios Kansas City · Jul 29, 2025 · news
- $10B, 500-acre Google campus gets stamp of approval near SmithvilleKCTV5 · Jul 29, 2025 · news
- Google announces construction underway for second data center campus in Kansas CityKSHB 41 · Feb 12, 2026 · news
- Google confirms $10B Project Mica in KCAxios Kansas City · Feb 12, 2026 · news
- Kansas City's AI data center building boom could hurt regional job market in the long termKCUR · Mar 22, 2026 · news
Cite this page
Last updated Sep 22, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Project Mica. Retrieved from https://datacentercensus.com/dc/google-project-mica-kansas-city-mo |
|---|---|
| MLA | “Project Mica.” Data Center Census, Sep 22, 2026, https://datacentercensus.com/dc/google-project-mica-kansas-city-mo. |
| Link | https://datacentercensus.com/dc/google-project-mica-kansas-city-mo |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.