Data Center Census Near me

Missouri

Data centers in Missouri

The Census tracks 7 major data center projects in Missouri, with 2.5 GW of planned capacity: 4 approved, 2 under construction, 1 cancelled.

How many data centers are in Missouri?

The Census tracks 7 major data center projects in Missouri as of Nov 6, 2026: 4 approved, 2 under construction, 1 cancelled. That covers major sourced projects, not every smaller facility. The largest by planned capacity is Meramec Valley Technology Park (1.2 GW). Latest change, at AWS Project Green: Cole County Circuit Judge Cotton Walker denies most of the motion to dismiss and finds the group has standing (Sep 18, 2026).

Projects tracked
7
Planned capacity, active projects
2.5GW
Under construction
2
Permanent jobs promised
1,000
RumoredProposedApprovedUnder constructionOperatingPausedCancelledDenied© OpenFreeMap © OpenStreetMap

Missouri data center projects

ProjectStatusCapacityDeveloperLast update
Meramec Valley Technology Park
Pacific, Franklin County
Approved 1.2 GW BLE Landholdings, LLC (Beltline Energy) Sep 15, 2026
Project Mica
Kansas City, Clay County
Under construction 700 MW Google Mar 22, 2026
CRG Festus Data Center
Festus, Jefferson County
Approved 600 MW CRG (Clayco) Aug 24, 2026
AWS Project Green
New Florence, Montgomery County
Approved — Amazon (AWS) Sep 18, 2026
Gateway Digital Campus
Villa Ridge, Franklin County
Approved — Provident Data Centers Sep 15, 2026
Google Kansas City Data Center (Hunt Midwest Business Center)
Kansas City, Clay County
Under construction — Google Mar 22, 2026
Project Cumulus
St. Charles, St. Charles County
Cancelled — CRG (Clayco) May 19, 2026

Recent changes in Missouri

  1. AWS Project Green MO
    Cole County Circuit Judge Cotton Walker denies most of the motion to dismiss and finds the group has standing KBIA / Columbia Missourian
  2. Gateway Digital Campus MO
    The Franklin County Commission votes to approve the Diamond 66 and Diamond Farms rezoning requests (Commission Orders 2026-255 and 2026-256), rezoning the site from its prior districts to industrial (A district) use, and separately adopts new countywide data-center regulations First Alert 4 (KMOV)
  3. Meramec Valley Technology Park MO
    The Franklin County Commission votes to approve BLE Landholdings' rezoning request (Commission Order 2026-257), reversing the Planning and Zoning Commission's April recommendation against it, and separately adopts new countywide data-center regulations First Alert 4 (KMOV)
  4. AWS Project Green MO
    Cole County judge hears arguments on motion to dismiss the Preserve Montgomery County lawsuit KBIA
  5. CRG Festus Data Center MO
    Council annexes three more parcels (6.55 acres) in CRG's plan, 5-2, days before a new state annexation law took effect Jefferson County Leader
  6. Meramec Valley Technology Park MO
    BLE Landholdings withdraws its rezoning application at the City of Pacific level, days after Pacific's mayor signs a one-year moratorium on new data-center applications; officials note the site sits in unincorporated Franklin County, where a separate county rezoning case remains open Yahoo News (KSDK)
  7. CRG Festus Data Center MO
    St. Louis County Circuit Judge Ellen W. Dunne denies plaintiffs' motion for default judgment in the residents' lawsuit Leader (Jefferson County, MO)
  8. CRG Festus Data Center MO
    CRG unveils refined design: four single-story buildings, ~600 MW, closed-loop cooling The Missouri Times (CRG release)
  9. AWS Project Green MO
    Amazon and Gov. Mike Kehoe announce a $10 billion data center campus in Montgomery County Office of Missouri Governor Mike Kehoe
  10. CRG Festus Data Center MO
    Council rejects recall petitions, 4-3 Jefferson County Leader

About this count

This page counts the major projects the Census has researched and sourced: 7 as of Nov 6, 2026, including 1 cancelled or denied. It does not yet include every smaller colocation or enterprise facility, so the total number of buildings in Missouri is higher. We add projects as they are announced or found in public filings.

Counties with tracked projects

Clay County · Franklin County · Jefferson County · Montgomery County · St. Charles County

Moratoriums

  1. Meramec Valley Technology Park MO
    BLE Landholdings withdraws its rezoning application at the City of Pacific level, days after Pacific's mayor signs a one-year moratorium on new data-center applications; officials note the site sits in unincorporated Franklin County, where a separate county rezoning case remains open Yahoo News (KSDK)
  2. Project Cumulus MO
    City Council unanimously adopts one-year citywide moratorium on data center applications Spectrum News

All 3 moratorium actions in Missouri →

Utilities serving tracked projects in Missouri

Ameren Missouri · Evergy. Will data centers raise electric bills here? →

Follow Missouri

RSS feed of Missouri changes · Printable fact sheet · Embed this tracker · Projects near a ZIP code · Data center jobs near you

Missouri data centers: common questions

How many data centers are in Missouri?

The Census tracks 7 major data center projects in Missouri as of Nov 6, 2026: 4 approved, 2 under construction, 1 cancelled. This counts large projects the Census has researched and sourced, not every smaller colocation or enterprise facility, so the total number of data center buildings in Missouri is higher.

What is the largest data center project in Missouri?

By published planned capacity, the largest tracked project in Missouri is Meramec Valley Technology Park in Pacific, Franklin County, MO, at 1.2 GW. Its status is approved.

Are data centers being built in Missouri right now?

Yes. 2 tracked projects are under construction in Missouri: Project Mica, Google Kansas City Data Center (Hunt Midwest Business Center).

How many jobs will data centers create in Missouri?

4 tracked projects in Missouri have a published permanent-jobs figure, adding up to 1,000 permanent jobs as announced. Announced jobs are promises, not guarantees; construction employment is typically much larger but temporary.

Are there data center moratoriums in Missouri?

The Census moratorium tracker records 3 moratorium actions in 3 jurisdictions in Missouri, most recently in Nodaway County (Jul 21, 2026). Each one, with its source, is on the Missouri moratorium page.

Answers are generated from the sourced project records above and update when a record changes. Open any project for its sources.

Missouri data center report card

Missouri data center report card: 7 tracked projects, 2.5 GW of published capacity, 2 under construction.

A square image of these figures, sized for Instagram, LinkedIn and slides. It is redrawn whenever a record changes, so the link always shows today’s numbers.

Download the image

Free to use with credit to Data Center Census (CC BY 4.0).

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in Missouri. Retrieved from https://datacentercensus.com/us/missouri
MLA“Data centers in Missouri.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/us/missouri.
Linkhttps://datacentercensus.com/us/missouri

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.