ProposedDevelopers selected by DOE in July 2026; power service agreement still needs Kentucky PSC approval and definitive agreements are pending
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

Brookfield and NextEra Energy plan a 1.8 GW AI and high-performance computing campus on part of the Department of Energy's former Paducah uranium enrichment site in western Kentucky. NextEra would build about 2 GW of new gas-fired generation and up to 2.6 GW of battery storage. The Energy Department announced the partnership on July 29, 2026, and the power service agreement still needs approval from the Kentucky Public Service Commission.

Permanent jobs (promised)
600
about

Key facts

Size & schedule

Planned capacity1.8 GW [1]
campus size per DOE; utility-delivered capacity targeted for 2032 per Data Center Knowledge
IT load1.2 GW [2]
"more than 1.2 GW" of AI compute capacity (Data Center Knowledge)
Stated investment$100 billion [2]
"roughly $100 billion over time", privately funded
Permanent jobs (promised)600 [1]
about
Construction jobs8,000 [1]
about
Target completionDOE and WBKO: construction expected complete in 2031; Data Center Knowledge: 1.8 GW by 2032 [3]

Power

Power supplyAbout 2 GW of new gas-fired generation and up to 2.6 GW of battery storage by NextEra; surplus to the regional grid. Big Rivers Electric Power Corporation (wholesale) and Jackson Purchase Energy Cooperative (retail) would serve the campus, with Paducah Power System as a community partner [1]
an analyst quoted by Data Center Knowledge cautions against adding generation and storage figures together

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Planned capacity1.8 GW [1]
IT load1.2 GW [2]
Power supplyAbout 2 GW of new gas-fired generation and up to 2.6 GW of battery storage by NextEra; surplus to the regional grid. Big Rivers Electric Power Corporation (wholesale) and Jackson Purchase Energy Cooperative (retail) would serve the campus, with Paducah Power System as a community partner [1]

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Timeline

  1. Energy Department issues a Request for Offers for AI data center and energy development at the Paducah Site [1]

  2. DOE announces Brookfield and NextEra as partners for a 1.8 GW AI campus with new generation and storage at the Paducah Site [1]

Issues raised

  • The power service agreement requires Kentucky Public Service Commission approval [1]

Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.

Sources

  1. Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky
    U.S. Department of Energy · Jul 29, 2026 · government
  2. Brookfield, NextEra Launch $100B AI Campus at DOE's Paducah Site
    Data Center Knowledge · Jul 29, 2026 · news
  3. AI data center coming to Western Kentucky
    WBKO · Jul 29, 2026 · news
  4. DOE announces Paducah data center campus with $100B private investment
    Spectrum News 1 Kentucky · Jul 29, 2026 · news

Cite this page

Last updated Oct 15, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Paducah Site AI campus. Retrieved from https://datacentercensus.com/dc/paducah-site-data-center-campus-ky
MLA“Paducah Site AI campus.” Data Center Census, Oct 15, 2026, https://datacentercensus.com/dc/paducah-site-data-center-campus-ky.
Linkhttps://datacentercensus.com/dc/paducah-site-data-center-campus-ky

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.