Data Center Census Near me

Mississippi

Data centers in Mississippi

The Census tracks 1 major data center project in Mississippi: 1 operating.

How many data centers are in Mississippi?

The Census tracks 1 major data center project in Mississippi as of Nov 6, 2026: 1 operating. That covers major sourced projects, not every smaller facility. Latest change, at Amazon Web Services Madison County Mega Site campus: Madison County Board of Supervisors upholds the tax assessor's valuation of five Canton data center buildings, rejecting Amazon's appeal (Aug 17, 2026).

Projects tracked
1
Planned capacity, active projects
—
Under construction
0
Permanent jobs promised
1,000
RumoredProposedApprovedUnder constructionOperatingPausedCancelledDenied© OpenFreeMap © OpenStreetMap

Mississippi data center projects

ProjectStatusCapacityDeveloperLast update
Amazon Web Services Madison County Mega Site campus
Canton, Madison County
Operating — Amazon (AWS) Aug 17, 2026

Recent changes in Mississippi

  1. Amazon Web Services Madison County Mega Site campus MS
    Madison County Board of Supervisors upholds the tax assessor's valuation of five Canton data center buildings, rejecting Amazon's appeal Mississippi Free Press
  2. Amazon Web Services Madison County Mega Site campus MS
    Amazon says it plans to at least double its presence at the Canton campus Mississippi Today
  3. Amazon Web Services Madison County Mega Site campus MS
    Five buildings reported operating at the Mega Site; Veolia wastewater partnership for cooling described WLBT
  4. Amazon Web Services Madison County Mega Site campus MS
    Gov. Tate Reeves announces $11 billion AWS expansion in Madison County, part of $25 billion statewide Office of Governor Tate Reeves
  5. Amazon Web Services Madison County Mega Site campus MS
    Site work and building pad construction under way at the Madison County campuses Magnolia Tribune
  6. Amazon Web Services Madison County Mega Site campus MS
    AWS confirmed as company behind $10 billion 'Project Atlas' in Madison County; Legislature passes incentive package DatacenterDynamics

About this count

This page counts the major projects the Census has researched and sourced: 1 as of Nov 6, 2026. It does not yet include every smaller colocation or enterprise facility, so the total number of buildings in Mississippi is higher. We add projects as they are announced or found in public filings.

Counties with tracked projects

Madison County

AI data centers in Mississippi

1 tracked project here is counted as AI data centers: Amazon Web Services Madison County Mega Site campus (operating). All AI data centers →

Utilities serving tracked projects in Mississippi

Entergy Mississippi. Will data centers raise electric bills here? →

Follow Mississippi

RSS feed of Mississippi changes · Printable fact sheet · Embed this tracker · Projects near a ZIP code · Data center jobs near you

Mississippi data centers: common questions

How many data centers are in Mississippi?

The Census tracks 1 major data center project in Mississippi as of Nov 6, 2026: 1 operating. This counts large projects the Census has researched and sourced, not every smaller colocation or enterprise facility, so the total number of data center buildings in Mississippi is higher.

Are data centers being built in Mississippi right now?

No tracked project in Mississippi is currently recorded as under construction.

How many jobs will data centers create in Mississippi?

1 tracked project in Mississippi has a published permanent-jobs figure, adding up to 1,000 permanent jobs as announced. Announced jobs are promises, not guarantees; construction employment is typically much larger but temporary.

How many AI data centers are in Mississippi?

The Census counts 1 tracked project in Mississippi as AI data centers, because their own sources describe them as built for AI: Amazon Web Services Madison County Mega Site campus (operating). That is a floor; other campuses may run AI workloads without their sources saying so.

Answers are generated from the sourced project records above and update when a record changes. Open any project for its sources.

Mississippi data center report card

Mississippi data center report card: 1 tracked project, 0 under construction.
  • Tracked projects1
  • Published capacityNone published
  • Under construction0
  • Moratorium actions in the tracker0

A square image of these figures, sized for Instagram, LinkedIn and slides. It is redrawn whenever a record changes, so the link always shows today’s numbers.

Download the image

Free to use with credit to Data Center Census (CC BY 4.0).

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in Mississippi. Retrieved from https://datacentercensus.com/us/mississippi
MLA“Data centers in Mississippi.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/us/mississippi.
Linkhttps://datacentercensus.com/us/mississippi

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.