Data Center Census Near me

Project Arrowhead

Irwin County, GA

Also known as Irwin Forward Tech Park, DRI 4689

ProposedIn state Development of Regional Impact review since April 2026; no county commission vote as of the last source; Georgia Power energy study under way
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

Project Arrowhead is a proposed 18-building, 4.22 million square foot data center campus in western Irwin County, Georgia, near Pinetta Church Road and Ponderosa Road. Irwin County filed it as a Development of Regional Impact on April 10, 2026, listing a peak electric load of 1.25 GW. The filing names no anchor tenant, and the regional commission recorded citizen comments that were all opposed.

Permanent jobs (promised)
200

Key facts

Size & schedule

Planned capacity1.25 GW [1]
peak electricity need in the DRI report; Georgia Power is conducting an energy study
Site size1,205 acres [1]
regional commission parcel list totals about 1,205 acres; the DRI application cites 1,066 acres (WWALS, Vesper)
Floor area4,220,000 sq ft [1]
Buildings18 [1]
Stated investment$6 billion [1]
estimated construction cost per regional commission report, which also prints it as $600,000,000 in one place
Permanent jobs (promised)200 [1]
Target completionPhase 1 in 2030 and full build-out in 2034, per Vesper OSINT reading of the DRI [3]

How big is that? Data center sizes compared with football fields and Central Park.

Power

UtilityGeorgia Power [1]

Water

Water use50,000 gpd [1]
0.05 million gallons per day from an on-site Floridan Aquifer well
Water sourceFloridan Aquifer, on-site well [1]

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Planned capacity1.25 GW [1]
UtilityGeorgia Power [1]

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Timeline

  1. Premier Data Center Development, LLC is formed with the Georgia Secretary of State [3]

  2. Ocilla-Irwin Planning Advisory Commission votes 4-0 to recommend a related special-use request; the applicant withdraws it March 2 [3]

  3. Irwin County submits the project as DRI #4689 to the Georgia Department of Community Affairs [2]

  4. Comment deadline for regional review [1]

Issues raised

  • Residents at a February hearing raised cooling water, noise and traffic concerns [3]
  • The regional commission reported that all fifteen citizen comments it received opposed the project [1]

Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.

Sources

  1. Project Arrowhead Data Center Irwin Co. DRI
    Southern Georgia Regional Commission (via WWALS) · Apr 24, 2026 · government
  2. Project Arrowhead Datacenter DRI application, Irwin County, GA
    WWALS Watershed Coalition · Apr 11, 2026 · other
  3. Project Arrowhead: Inside Irwin County, Georgia's Data Center Fight
    Vesper OSINT · Apr 2026 · other

Cite this page

Last updated Oct 15, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Project Arrowhead. Retrieved from https://datacentercensus.com/dc/project-arrowhead-irwin-county-ga
MLA“Project Arrowhead.” Data Center Census, Oct 15, 2026, https://datacentercensus.com/dc/project-arrowhead-irwin-county-ga.
Linkhttps://datacentercensus.com/dc/project-arrowhead-irwin-county-ga

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.