Data Center Census Near me

Utility

Georgia Power and data centers

2 tracked data center projects in Georgia, 3.46 GW of planned capacity, large-load tariff approved.

Part of Southern Company.

Tracked data center projects

ProjectStatusPlanned capacity
Project Camellia
Georgia
Proposed3.21 GW
QTS Fayetteville data center campus
Georgia
Operating250 MW

Capacity is the planned figure each project publishes (utility load or IT load as the record notes). Total for proposed, approved, under-construction and operating projects: 3.46 GW. A project served by two utilities counts in full for each.

Large-load tariff and rules

Status
Large-load tariff or rules approved (2025-01-23)
Tariff
Georgia Power large-load rule (new customers above 100 MW)
What it says
The PSC says it unanimously approved a rule letting Georgia Power bill new customers above 100 MW on additional terms, including contract lengths of up to 15 years, minimum billing requirements, and PSC review of each such contract. (Georgia Public Service Commission)
Source excerpt
“The new Georgia Power rule states that any new customers using more than 100 megawatts of energy can be billed using terms and conditions beyond those used for standard customers to address risks associated with these large-load users.”

Official forecasts of data center load

  • Georgia Power's 2025 IRP, approved by the PSC in July 2025, anticipates about 8,500 MW of load growth over six years, with the company and PSC staff disagreeing on how much large-load energy use to expect. (Utility Dive, 2025-07-16)
    Source excerpt
    “anticipates approximately 8,500 MW of load growth over the next six years”
  • The PSC says it approved certification of 9,885 MW of new Georgia Power production, most of it to serve new large customers such as data centers. (Georgia Public Service Commission, 2025-12-19)
    Source excerpt
    “allow Georgia Power to produce 9,885 megawatts of new energy. Most of this new energy will serve new large customers such as data centers.”

What sources say about customer bills

Sources warning that other customers’ costs could rise

  • Georgia PSC Public Interest Advocacy Staff (as reported by the PSC): The PSC release says its staff worried that new facilities could become stranded assets if expected data center load did not materialize, which the backstop in the agreement is meant to address. (Georgia Public Service Commission, 2025-12-19)
    Source excerpt
    “Should the need for additional power not materialize, staff was concerned that the newly constructed facilities could become stranded assets.”
  • Southern Environmental Law Center: SELC argues the 2025 IRP's reliance on fossil fuels leaves customers exposed to bill spikes and that the data center demand behind the plan had not yet materialized. (Southern Environmental Law Center, 2025-07-15)
    Source excerpt
    “Fossil fuels, like coal and methane gas, leave customers vulnerable to costly utility bill spikes.”

Sources saying customers are protected, or bills are lower than they would be

  • Georgia PSC: The PSC says its December 2025 stipulated agreement ensures serving new data center customers will not raise rates for current customers. (Georgia Public Service Commission, 2025-12-19)
    Source excerpt
    “the stipulated agreement insures that serving those new customers will not raise the rates for current Georgia Power customers.”
  • Georgia PSC: The PSC says its July 2025 agreement freezes Georgia Power base rates at current levels for at least three years. (Georgia Public Service Commission, 2025-07-01)
    Source excerpt
    “The agreement passed Tuesday leaves base rates at the current level.”

These are statements by regulators, utilities, advocates and researchers about this utility or its region. They are not a prediction of any customer’s bill, which depends on rates, usage and regulator decisions.

More

States: Georgia. Look up another utility · All utilities · Power tracker · Energy news · Tax breaks tracker

Cite this page

Last updated Oct 13, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Georgia Power and data centers. Retrieved from https://datacentercensus.com/utilities/georgia-power
MLA“Georgia Power and data centers.” Data Center Census, Oct 13, 2026, https://datacentercensus.com/utilities/georgia-power.
Linkhttps://datacentercensus.com/utilities/georgia-power

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.