Data centers in Colorado

The Census tracks 1 major data center project in Colorado, with 1 GW of planned capacity: 1 approved.

How many data centers are in Colorado?

The Census tracks 1 major data center project in Colorado as of Nov 6, 2026: 1 approved. That covers major sourced projects, not every smaller facility. The largest by planned capacity is Global AI Data Center (1 GW). Latest change, at Global AI Data Center: Board of County Commissioners votes 5-0 to approve Use by Special Review permit after eight-hour hearing (Sep 9, 2026).

Projects tracked
1
Planned capacity, active projects
1GW
Under construction
0
Permanent jobs promised
200
RumoredProposedApprovedUnder constructionOperatingPausedCancelledDenied© OpenFreeMap © OpenStreetMap

Colorado data center projects

ProjectStatusCapacityDeveloperLast update
Global AI Data Center
Windsor, Weld County
Approved 1 GW Global AI Sep 9, 2026

Recent changes in Colorado

  1. Global AI Data Center CO
    Board of County Commissioners votes 5-0 to approve Use by Special Review permit after eight-hour hearing Colorado Public Radio
  2. Global AI Data Center CO
    Weld County Planning Commission votes 7-0 to recommend approval Weld County
  3. Global AI Data Center CO
    County issues three stop-work orders and a Notice of Violation over unpermitted equipment installation (summer 2026) Colorado Public Radio
  4. Global AI Data Center CO
    Global AI buys 438-acre former Carestream property for $15.6 million KUNC

About this count

This page counts the major projects the Census has researched and sourced: 1 as of Nov 6, 2026. It does not yet include every smaller colocation or enterprise facility, so the total number of buildings in Colorado is higher. We add projects as they are announced or found in public filings.

Counties with tracked projects

Weld County

Utilities serving tracked projects in Colorado

Poudre Valley Rural Electric Association. Will data centers raise electric bills here? →

Follow Colorado

RSS feed of Colorado changes · Printable fact sheet · Embed this tracker · Projects near a ZIP code · Data center jobs near you

Colorado data centers: common questions

How many data centers are in Colorado?

The Census tracks 1 major data center project in Colorado as of Nov 6, 2026: 1 approved. This counts large projects the Census has researched and sourced, not every smaller colocation or enterprise facility, so the total number of data center buildings in Colorado is higher.

What is the largest data center project in Colorado?

By published planned capacity, the largest tracked project in Colorado is Global AI Data Center in Windsor, Weld County, CO, at 1 GW. Its status is approved.

Are data centers being built in Colorado right now?

No tracked project in Colorado is currently recorded as under construction. 1 is proposed or approved.

How many jobs will data centers create in Colorado?

1 tracked project in Colorado has a published permanent-jobs figure, adding up to 200 permanent jobs as announced. Announced jobs are promises, not guarantees; construction employment is typically much larger but temporary.

Answers are generated from the sourced project records above and update when a record changes. Open any project for its sources.

Colorado data center report card

Colorado data center report card: 1 tracked project, 1 GW of published capacity, 0 under construction.

A square image of these figures, sized for Instagram, LinkedIn and slides. It is redrawn whenever a record changes, so the link always shows today’s numbers.

Download the image

Free to use with credit to Data Center Census (CC BY 4.0).

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in Colorado. Retrieved from https://datacentercensus.com/us/colorado
MLA“Data centers in Colorado.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/us/colorado.
Linkhttps://datacentercensus.com/us/colorado

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.