Rowan Digital Infrastructure Temple Campus

Temple, Bell County, TX[1]

Approved[1]Temple City Council approved the Bob White Road project in September 2025, per KBTX. A sixth Temple building, Lasso, awaits zoning, per KWTX.
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

Rowan Digital Infrastructure has a multi-building data center campus in Temple, Texas. Its Bob White Road project, about 700 acres and $700 million, won unanimous city council approval in September 2025. In August 2026 Rowan asked for approval of a sixth and final building, Lasso, as a relocated building; KWTX reports four of the six buildings are under construction. KWTX says residents have raised concerns about water, electricity, noise and infrastructure.

Stated investment
$700 million[1]
Bob White Road project, per KBTX
Site size
700 acres[1]
Bob White Road project

Key facts

Size & schedule

Site size700 acres [1]
Bob White Road project
Buildings6 [2]
planned across the Temple campus, with Lasso as the sixth, per KWTX
Stated investment$700 million [1]
Bob White Road project, per KBTX

How big is that? Data center sizes compared with football fields and Central Park.

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Not disclosed. No capacity or power-supply figure is on the record.

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Timeline

  1. Temple City Council unanimously approves Rowan's $700 million Bob White Road data center project [1]

  2. Rowan seeks approval of Lasso, a sixth and final Temple data center; Planning and Zoning review set for Aug 17 and council in September [2]

Issues raised

  • Residents have raised concerns about water, electricity, noise and infrastructure, per KWTX [2]

Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.

Sources

  1. New $700 million data center in Temple will be near Robinson Family Farm
    KBTX · Oct 7, 2025 · news
  2. Rowan Digital Infrastructure seeks approval for 6th and final data center in Temple
    KWTX · Aug 12, 2026 · news

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Rowan Digital Infrastructure Temple Campus. Retrieved from https://datacentercensus.com/dc/rowan-project-temple-tx
MLA“Rowan Digital Infrastructure Temple Campus.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/dc/rowan-project-temple-tx.
Linkhttps://datacentercensus.com/dc/rowan-project-temple-tx

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.