Crossroads Technology Campus is a proposed data center campus of about 555 acres in Spotsylvania County's Lee Hill District, with seven 100-megawatt data center buildings totaling about 2.1 million square feet and three substation sites. The applicant is RCK Digital Crossroads LLC, and an attorney for the developers said Amazon is the end user. The Planning Commission voted 4-2 to recommend approval of the special use permit in September 2026 over resident objections.
- Site size
- 555.05 acres[1]
- Water use
- 1,000,000 gal/day
- reuse water for cooling
Key facts
Size & schedule
| Planned capacity | 894 MW [2] estimated electric load on utility information form Source excerpt“Estimated Electric Load (MW): 894MW” |
|---|---|
| Site size | 555.05 acres [1]Source excerpt“consisting of approximately 555.05 acres” |
| Floor area | 2.1 million sq ft [1]Source excerpt“approximately 2.1 million square-feet of data center buildings” |
| Buildings | 7 [1]Source excerpt“seven 100-megawatt data center buildings” |
How big is that? Data center sizes compared with football fields and Central Park.
Power
| Utility | Rappahannock Electric Cooperative (distribution); Dominion Energy (transmission) [2]Source excerpt“Anticipated Transmission Voltage: 230kV. The transmission provider for the Project Location is: Dominion Energy.” |
|---|
Water
| Water use | 1,000,000 gal/day [1] reuse water for cooling Source excerpt“1 million gallons of reuse water per day” |
|---|---|
| Water source | Reuse water; potable water not to be used for cooling [1]Source excerpt“potable water will not be used” |
Local decisions & site
| Zoning | Special use permit (SUP26-0003) [4]Source excerpt“SUP26-0003 Crossroads Technology Campus” |
|---|---|
| Parcel / address | Tax Map Parcels 37-A-20, 37-A-21 and 37-A-17D [1]Source excerpt“Tax Map Parcels 37-A-20, 37-A-21, and 37-A-17D” |
| Nearest homes or schools | Minimum 400-foot building setback from residentially zoned properties and 300-foot vegetated buffer (conditions) [3]Source excerpt“a minimum 400-foot building setback from residentially zoned properties” |
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Water and power
Water
Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.
Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →
Timeline
Issues raised
- Residents raised concerns about power, water, noise and pollution [5]
- A resident told commissioners they were "selling out your neighbors for projections, not actual numbers" [3]
Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.
Sources
- SUP26-0003 Crossroads Technology Campus: 5th Submission NarrativeSpotsylvania County · Aug 26, 2026 · government
- REC High Energy Use Facility (HEUF) Utility Information Form – Crossroads Technology CampusSpotsylvania County · Aug 7, 2026 · government
- Spotsylvania Planning Commission recommends approval of 555-acre data center campusFredericksburg Free Press · Sep 17, 2026 · news
- Data Center FAQsSpotsylvania County · government
- At a Crossroads: Spotsylvania residents pack meetings this week to challenge data center projectFredericksburg Free Press · Jul 16, 2026 · news
Cite this page
Last updated Sep 23, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Crossroads Technology Campus. Retrieved from https://datacentercensus.com/dc/crossroads-technology-campus-spotsylvania-county-va |
|---|---|
| MLA | “Crossroads Technology Campus.” Data Center Census, Sep 23, 2026, https://datacentercensus.com/dc/crossroads-technology-campus-spotsylvania-county-va. |
| Link | https://datacentercensus.com/dc/crossroads-technology-campus-spotsylvania-county-va |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.