Storey County, NV
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge)
Also known as South Valley data center campus, Peru Ridge data center campus
- Rumored
- Proposed
- Approved
- Under construction
- Operating
Fleet Data Centers, a subsidiary of Tract Capital Management, is developing two data center campuses, South Valley and Peru Ridge, at the Tahoe Reno Industrial Center. It plans to power them for two to three years with private gas plants of more than 360 MW until NV Energy can provide permanent service; Nevada regulators approved the plants in September 2026. The project sits within a wider debate over northern Nevada power supply: NV Energy plans to stop supplying about 49,000 Liberty Utilities customers at Lake Tahoe once its Greenlink West line is built, and some coverage linked that to data center demand. NV Energy says data centers did not influence that decision.
Key facts
Size & schedule
| Planned capacity | 362 MW [5] Combined on-site gas generation (South Valley 144 MW + Peru Ridge 218 MW), temporary; not stated IT load |
|---|---|
| Site size | 1,600 acres at South Valley; 1,200 acres combined at Peru Ridge and Peru Shelf [8]Source excerpt“the company's expansive land position of 1,600 acres at South Valley is developable to a total of 1215MW.” |
Power
| Utility | NV Energy [7] Large load electric service agreement with Fleet subsidiary SV RNO Property Owner 1, LLC signed May 2026 |
|---|---|
| Power supply | Temporary private natural gas and diesel engine plants for 2–3 years, then NV Energy permanent service [5] |
| Air permit | Air quality permit applications for both gas plants submitted to the Nevada Division of Environmental Protection (as of April 2026) [5]Source excerpt“Air quality permit applications for the projects have already been submitted to the Nevada Division of Environmental Protection.” |
| Utility commission case | PUCN Docket 26-04026 (South Valley, 144 MW) and Docket 26-04027 (Peru Ridge, 218 MW) [5]Source excerpt“If approved, a temporary 144 MW plant would be built to power the South Valley data center campus, while a separate data center campus would be fueled by the 218 MW Peru Ridge Self-Generation Project, according to applications filed April 20 with state energy regulators.” |
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
CalMatters reports NV Energy will not renew power supply to Liberty Utilities' ~49,000 Lake Tahoe customers (contract ending May 2027), citing its own resource needs [1]
Fleet files PUCN applications for South Valley (Docket 26-04026) and Peru Ridge (Docket 26-04027) self-generation plants [5]
NV Energy enters large load electric service agreement with Fleet subsidiary SV RNO Property Owner 1, LLC [7]
Fortune publishes report linking NV Energy's Tahoe supply exit to data center demand [2]
NV Energy states data centers did not influence the Liberty decision and it will serve Liberty until Greenlink West is in place [3]
Fleet and Tract break ground on a 2 million sq ft data center along USA Parkway with Gov. Joe Lombardo in attendance [9]
Public Utilities Commission of Nevada approves the two gas plants, subject to environmental permits and Storey County approvals [6]
Issues raised
- Opponents cite air pollution, climate impacts, and bypassing Nevada's 50% by 2030 renewable portfolio standard; intervenor NCARE may appeal [6]
- An analysis cited by Nevada Current says the plants would burn about three times the gas used by NV Energy's entire northern Nevada residential and commercial customer base in 2025 [7]
- Lake Tahoe residents and officials worry about replacement power for Liberty customers; NV Energy says 'there is no scenario where Liberty customers will be left without service' [2][3]
Sources
- Nevada utility to Lake Tahoe: Find electricity elsewhereCalMatters · Mar 20, 2026 · news
- 'It's like we don't exist': Nearly 50,000 Lake Tahoe residents face power loss as utility redirects lines to data centersFortune · May 12, 2026 · news
- NV Energy responds to Fortune article about South Lake Tahoe's power supplyKTVN 2News · May 15, 2026 · news
- A Shock to the SystemMoonshine Ink · May 14, 2026 · news
- Why a Northern Nevada data center wants to build its own temporary natural gas power plantThe Nevada Independent · Apr 29, 2026 · news
- Public Utility Commission approves gas plants to power data centersNevada Current · Sep 18, 2026 · news
- Private gas plants to power data centers would skirt state's renewable energy lawThis Is Reno / Nevada Current · Sep 1, 2026 · news
- Fleet Data Centers breaks ground on 2 facilitiesNorthern Nevada Business Weekly · Jun 2, 2026 · news
- Gov. Lombardo, construction companies break ground on 2 million sq. ft. data center in Storey Co.KOLO 8 News Now · May 20, 2026 · news