Data centers in Nevada

The Census tracks 2 major data center projects in Nevada, with 362 MW of planned capacity: 2 proposed.

How many data centers are in Nevada?

The Census tracks 2 major data center projects in Nevada as of Nov 6, 2026: 2 proposed. That covers major sourced projects, not every smaller facility. The largest by planned capacity is Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) (362 MW). Latest change, at Switch Core 2.0 Phase 1 Campus: A city spokeswoman said the proposal had not yet been scheduled before the Planning Commission or City Council (Sep 25, 2026).

Projects tracked
2
Planned capacity, active projects
362MW
Under construction
0
Operating
0
RumoredProposedApprovedUnder constructionOperatingPausedCancelledDenied© OpenFreeMap © OpenStreetMap

Nevada data center projects

ProjectStatusCapacityDeveloperLast update
Fleet Data Centers TRIC campuses (South Valley and Peru Ridge)
Storey County
Proposed 362 MW Tract, Fleet Data Centers Sep 18, 2026
Switch Core 2.0 Phase 1 Campus
North Las Vegas, Clark County
Proposed — Switch Sep 25, 2026

Recent changes in Nevada

  1. Switch Core 2.0 Phase 1 Campus NV
    A city spokeswoman said the proposal had not yet been scheduled before the Planning Commission or City Council. 102.7 Coyote Country (Beasley Media)
  2. Switch Core 2.0 Phase 1 Campus NV
    KTNV reported Switch's letter of intent for a 175.8-acre campus, based on documents filed with the city in August. KTNV Channel 13 Las Vegas
  3. Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
    Public Utilities Commission of Nevada approves the two gas plants, subject to environmental permits and Storey County approvals Nevada Current
  4. Switch Core 2.0 Phase 1 Campus NV
    County records showed Switch had bought about 176 more acres at Apex for roughly $196 million, with no announced plans for that land. FOX5 Las Vegas (KVVU)
  5. Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
    California Public Utilities Commission unanimously authorizes Liberty Utilities to seek bids for a new Lake Tahoe power supplier CapRadio
  6. Switch Core 2.0 Phase 1 Campus NV
    KTNV reported, citing county assessor records, that Switch had bought more than 300 acres in the Apex area for about $200 million. The city said it had no plans to share. KTNV Channel 13 Las Vegas
  7. Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
    Fleet and Tract break ground on a 2 million sq ft data center along USA Parkway with Gov. Joe Lombardo in attendance KOLO 8 News Now
  8. Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
    NV Energy states data centers did not influence the Liberty decision and it will serve Liberty until Greenlink West is in place KTVN 2News
  9. Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
    Fortune publishes report linking NV Energy's Tahoe supply exit to data center demand Fortune
  10. Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) NV
    NV Energy enters large load electric service agreement with Fleet subsidiary SV RNO Property Owner 1, LLC This Is Reno / Nevada Current

About this count

This page counts the major projects the Census has researched and sourced: 2 as of Nov 6, 2026. It does not yet include every smaller colocation or enterprise facility, so the total number of buildings in Nevada is higher. We add projects as they are announced or found in public filings.

Counties with tracked projects

Clark County · Storey County

Utilities serving tracked projects in Nevada

NV Energy. Will data centers raise electric bills here? →

Follow Nevada

RSS feed of Nevada changes · Printable fact sheet · Embed this tracker · Projects near a ZIP code · Data center jobs near you

Nevada data centers: common questions

How many data centers are in Nevada?

The Census tracks 2 major data center projects in Nevada as of Nov 6, 2026: 2 proposed. This counts large projects the Census has researched and sourced, not every smaller colocation or enterprise facility, so the total number of data center buildings in Nevada is higher.

What is the largest data center project in Nevada?

By published planned capacity, the largest tracked project in Nevada is Fleet Data Centers TRIC campuses (South Valley and Peru Ridge) in Storey County, NV, at 362 MW. Its status is proposed.

Are data centers being built in Nevada right now?

No tracked project in Nevada is currently recorded as under construction. 2 are proposed or approved.

Answers are generated from the sourced project records above and update when a record changes. Open any project for its sources.

Nevada data center report card

Nevada data center report card: 2 tracked projects, 362 MW of published capacity, 0 under construction.

A square image of these figures, sized for Instagram, LinkedIn and slides. It is redrawn whenever a record changes, so the link always shows today’s numbers.

Download the image

Free to use with credit to Data Center Census (CC BY 4.0).

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in Nevada. Retrieved from https://datacentercensus.com/us/nevada
MLA“Data centers in Nevada.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/us/nevada.
Linkhttps://datacentercensus.com/us/nevada

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.