Sentinel / Green Fig Data Center
Malvern, Chester County, PADeveloper: Sentinel Data Centers
Also known as East Whiteland Data Center, Project Forge PA
- Rumored
- Proposed
- Approved
- Under construction
- Operating
Follow this project
New dated changes arrive in your feed reader or calendar. No account, no email address, no tracking.
- RSS feed for any feed reader
- Atom feed
- Hearings calendar (.ics, subscribes in Apple, Google or Outlook Calendar)
Green Fig LLC and Sentinel Data Centers plan a 1.5 million-square-foot data center at 13 S. Bacton Hill Road in East Whiteland Township, on 79 acres of the former Foote Mineral Co. Superfund site. The project holds 2018 zoning and 2024 land development approvals, which a county judge upheld in June 2026, but construction has been halted twice by township stop-work orders. The township is also pursuing a municipal curative zoning amendment on data centers.
- Site size
- 79 acres[4]
Key facts
Size & schedule
| Site size | 79 acres [4] |
|---|---|
| Floor area | 1.5 million sq ft [3] two buildings of about 772,000 sq ft each as approved; developers briefly offered a 536,000 sq ft air-cooled alternative, then withdrew it |
| Buildings | 2 [3] |
How big is that? Data center sizes compared with football fields and Central Park.
Power
| Utility | PECO (electric); Aqua (water) [1] Utility pages: PECO · data centers and bills |
|---|---|
| Backup generators | Diesel standby generators [7]Source excerpt“Your responses also indicated that the proposed reuse will involve the use of materials including diesel for standby generators, oils/refrigerants, and batteries.” |
Local decisions & site
| Parcel / address | 13 South Bacton Hill Road, near the intersection of Swedesford Road and South Bacton Hill Road, adjacent to the PECO Planebrook Substation [7]Source excerpt“The site is located at 13 South Bacton Hill Road, near the intersection of Swedesford Road and South Bacton Hill Road adjacent to the PECO Planebrook Substation.” |
|---|
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Water and power
Water
Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.
Power
| Utility | PECO (electric); Aqua (water) [1] |
|---|
Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →
Lawsuits
| Residents' land use appeals of Sentinel/Green Fig approvals (2018 zoning hearing board decision and 2024 final land development approval) | dismissed [2] Judge Anthony Verwey quashed/denied two appeals by nearby residents challenging the 2018 zoning permit and the 2024 land development approval. Chester County Court of Common Pleas Source excerpt“Calling it "frivolous," a Chester County judge on Thursday quashed a land use appeal seeking to halt the construction of a 1.5 million-square-foot data center proposed for East Whiteland Township. It's the second time this week Court of Common Pleas Judge Anthony Verwey has denied appeals challenging approvals” |
|---|
Timeline
Zoning Hearing Board decision permits data center use [1]
Board of Supervisors grants preliminary land development approval (Resolution 26-2024). [1]
Board of Supervisors grants final land development approval (Resolution 30-2024) [1]
Board of Supervisors votes unanimously to begin a curative amendment process for data center zoning, which does not affect this pending project. [8]
Chester County judge denies residents' appeals of project approvals [2]
Township issues first stop-work order over soil and health/safety plans; work resumes by end of July [3]
Developers withdraw offer to downsize to 536,000 sq ft and switch to air chillers [3]
Township issues second stop-work order pending Aqua confirmation of water availability [5]
Issues raised
- Residents object to building on the Foote Mineral Superfund site, contaminated with lithium, arsenic, hexavalent chromium and low-level radiation [4]
- Neighbors in Malvern Hunt cite proximity to homes and the Chester Valley Trail [2]
- Township requires confirmation that sufficient water is committed to the project [3][5]
Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.
Sources
- Sentinel, Green Fig Data Center on Swedesford RoadEast Whiteland Township · Sep 2026 · government
- Judge denies challenges to a 1.5 million-square-foot East Whiteland data center projectThe Philadelphia Inquirer · Jun 11, 2026 · news
- The controversial East Whiteland data center project has been issued its second stop-work orderThe Philadelphia Inquirer · Aug 27, 2026 · news
- East Whiteland Data Center Construction Halted Over Superfund Site ConcernsVISTA Today · Aug 1, 2026 · news
- East Whiteland Halts Data Center Work Over Water ApprovalMyChesCo · Aug 28, 2026 · news
- Cure Timeline UpdatedEast Whiteland Township · Sep 2026 · government
- FAQ from the East Whiteland Township Board of Supervisors Regarding the Sentinel, Green Fig Data CenterEast Whiteland Township · government
- East Whiteland will revise its data center zoning ordinance, as the public pushes back on a 1.6 million-square-foot proposalThe Philadelphia Inquirer · Apr 1, 2026 · news
Cite this page
Last updated Sep 22, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Sentinel / Green Fig Data Center. Retrieved from https://datacentercensus.com/dc/sentinel-green-fig-east-whiteland-pa |
|---|---|
| MLA | “Sentinel / Green Fig Data Center.” Data Center Census, Sep 22, 2026, https://datacentercensus.com/dc/sentinel-green-fig-east-whiteland-pa. |
| Link | https://datacentercensus.com/dc/sentinel-green-fig-east-whiteland-pa |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.