Project Spalding is a data center campus proposed by Montana Property Group LLC on two adjoining properties owned by Alan R. Mobley on the north side of High Falls Road and Alicia Drive in Spalding County, Georgia, totaling 132.9 acres. The Griffin Daily News lists it at 2,559,500 square feet in three two-story buildings, plus two administrative and management facilities, a power substation and a proposed solar farm, with build-out scheduled for 2030. The Spalding County Board of Commissioners approved rezonings and special exceptions with conditions in July 2025; in September 2026 the county said it had received no Land Disturbance Permit submittals for the approved data center sites.
Key facts
Size & schedule
| Site size | 132.9 acres [5] described as approximately 133 acres in April 2025 [1] Source excerpt“on two adjoining pieces of property on the north side of High Falls Road and Alicia Drive, totaling 132.9 acres” |
|---|---|
| Floor area | 2,559,500 sq ft [5] two buildings of 936,460 sq ft and one of 686,737 sq ft; WSB-TV reported nearly 2.6 million sq ft [2] and DatacenterDynamics 2.55 million sq ft [4] Source excerpt“The data center campus is listed as being a total of 2,559,500 square feet, with three large buildings housing the computing equipment.” |
| Buildings | 3 [5] two-story data center buildings; the site also includes two detached administrative and management facilities and a power substation Source excerpt“All three are two-story buildings, with two listed at 936,460 square feet each and the third at 686,737 square feet.” |
| Stated investment | $1.88 billion [1] estimated value at build-out from the Development of Regional Impact (DRI #4425) additional information form, which also estimated $26.859 million in annual local tax revenues; WSB-TV reported proposal documents putting the value at more than $1.8 billion upon completion Source excerpt“the estimated value at buildout is $1.875 billion” |
| Target completion | Build-out scheduled for 2030 [5]Source excerpt“Build out is scheduled for 2030.” |
How big is that? Data center sizes compared with football fields and Central Park.
Power
| On-site generation type | Proposed solar farm on the property [2]Source excerpt“Additionally, there would be two detached administrative and management facilities, a power substation, proposed solar farm for power generation” |
|---|
Water
| Cooling | Closed-loop water system (county requirement for data centers) [5] the developers of all three approved Spalding County data center campuses agreed to follow the county's data center regulations [5] Source excerpt“One of the requirements developed for data centers in the county stipulates that that the facilities can only use closed-loop water systems.” |
|---|
Local decisions & site
| Deciding vote | Spalding County Board of Commissioners approved rezonings and special exceptions with conditions in July 2025 [5] also reported by The Griffin Daily News in December 2025 [3] |
|---|---|
| Zoning | Data center rezoning to C-1C (Manufacturing-Light) from R-2 (Single Family Residential) and AR-1 (Agricultural-Residential), with special exceptions [1] as requested in April 2025 Source excerpt“The rezonings would be from AR-1 (Agricultural-Residential) and R-2 (Single Family Residential) to C-1C (Manufacturing-Light) for a data center.” |
| Parcel / address | Two adjoining properties owned by Alan R. Mobley: 86.81 acres on High Falls Road and 46.1 acres on Alicia Drive [1]Source excerpt“Mobley, who owns 86.81 acres on High Falls Road and 46.1 acres on Alicia Drive” |
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Timeline
The Data Center Construction Channel reports that Montana Property Group LLC filed a Development of Regional Impact application with the Georgia Department of Community Affairs for a campus known as Project Spalding [1]
Resident Greg Berns speaks against the proposed data center during citizen comment at a Spalding County Board of Commissioners meeting [1]
Spalding County Board of Commissioners approves rezonings and special exceptions with conditions for the campus [5]
Spalding County Board of Commissioners holds a hearing on the application [2]
Issues raised
- At an April 2025 commission meeting, resident Greg Berns said the project would consume more power and water than the entire county and produce significant noise, and called the rezoning request questionable spot zoning [1]
- In September 2026 the county's community development director said no Land Disturbance Permit filings of any kind had come in, and the county had no paperwork showing the approved projects were advancing [5]
- Commissioner James Dutton said the county's strict data center rules have discouraged developers from coming to the county [5]
- The DRI form estimated $26.859 million in annual local tax revenues at build-out [1]; WSB-TV reported $26.86 million per year [2]
- The Griffin Daily News reported the county's closed-loop requirement carries a maximum estimated water use of 25,000 gallons per day [5]
Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.
Sources
- Spalding County resident raises alarm about a proposed data center on High Falls RoadThe Griffin Daily News · Apr 10, 2025 · news
- Spalding County commissioners hold hearing on data center developmentWSB-TV Channel 2 · Jul 15, 2025 · news
- Third data center campus rezoning tabled until JanuaryThe Griffin Daily News · Dec 2, 2025 · news
- Application filed for 5 million sq ft data center campus outside Atlanta, GeorgiaDatacenterDynamics · Jan 7, 2026 · news
- Are data centers dead in Spalding County?The Griffin Daily News · Sep 3, 2026 · news
Cite this page
Last updated Sep 24, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Project Spalding. Retrieved from https://datacentercensus.com/dc/project-spalding-high-falls-road-ga |
|---|---|
| MLA | “Project Spalding.” Data Center Census, Sep 24, 2026, https://datacentercensus.com/dc/project-spalding-high-falls-road-ga. |
| Link | https://datacentercensus.com/dc/project-spalding-high-falls-road-ga |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.