Cologix Johnstown Campus
Johnstown, Licking County, OH[1][2]
- Rumored
- Proposed
- Approved
- Under construction
- Operating
Follow this project
New dated changes arrive in your feed reader or calendar. No account, no email address, no tracking.
- RSS feed for any feed reader
- Atom feed
- Hearings calendar (.ics, subscribes in Apple, Google or Outlook Calendar)
Cologix, a Denver-based data center provider that already runs four facilities in Columbus, announced an eight-building AI-ready campus on 154 acres at Johnstown in western Licking County. The company put the investment at $7 billion and the scale at up to 800 MW, in about 2 million square feet. Cologix said first-phase construction would begin in 2025. Local reporting in June 2025 still described work as expected to begin later that year.
- Site size
- 154 acres[2]
Key facts
Size & schedule
| Planned capacity | 800 MW [1] up to, scalable capacity, as stated by Cologix Source excerpt“up to 800 MW of scalable capacity” |
|---|---|
| Site size | 154 acres [2] |
| Floor area | 2 million sq ft [1] operating space, as stated by Cologix |
| Buildings | 8 [1] |
| Stated investment | $7 billion [1] company-stated plan for the eight-building campus |
| Target completion | First-phase construction expected to begin in 2025 [1] |
How big is that? Data center sizes compared with football fields and Central Park.
Figures are as stated by the cited source. Where sources disagree, each figure is shown.
Water and power
Water
Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.
Power
| Planned capacity | 800 MW [1] |
|---|
Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →
Timeline
Sources
- Cologix plans $7 billion, 800-MW data center complex in OhioPOWER Magazine · Nov 20, 2024 · news
- Data center company Cologix buys land in Licking CountyWSYX / ABC 6 (myfox28columbus.com) · Nov 21, 2024 · news
- Cologix breaks ground on $1 billion datacenter in Central OhioColumbus Construction · Jun 23, 2025 · news
Cite this page
Last updated Nov 5, 2026. Figures may change as records are updated — include the date you retrieved them.
| APA | Data Center Census. (2026). Cologix Johnstown Campus. Retrieved from https://datacentercensus.com/dc/cologix-johnstown-campus-licking-county-oh |
|---|---|
| MLA | “Cologix Johnstown Campus.” Data Center Census, Nov 5, 2026, https://datacentercensus.com/dc/cologix-johnstown-campus-licking-county-oh. |
| Link | https://datacentercensus.com/dc/cologix-johnstown-campus-licking-county-oh |
Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.