Cologix Johnstown Campus

Johnstown, Licking County, OH[1][2]

Proposed[1][3]Announced November 2024 with construction expected to start in 2025; no start or local approval has been confirmed in the sources reviewed
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

Cologix, a Denver-based data center provider that already runs four facilities in Columbus, announced an eight-building AI-ready campus on 154 acres at Johnstown in western Licking County. The company put the investment at $7 billion and the scale at up to 800 MW, in about 2 million square feet. Cologix said first-phase construction would begin in 2025. Local reporting in June 2025 still described work as expected to begin later that year.

Site size
154 acres[2]

Key facts

Size & schedule

Planned capacity800 MW [1]
up to, scalable capacity, as stated by Cologix
Source excerpt
“up to 800 MW of scalable capacity”
Site size154 acres [2]
Floor area2 million sq ft [1]
operating space, as stated by Cologix
Buildings8 [1]
Stated investment$7 billion [1]
company-stated plan for the eight-building campus
Target completionFirst-phase construction expected to begin in 2025 [1]

How big is that? Data center sizes compared with football fields and Central Park.

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Planned capacity800 MW [1]

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Timeline

  1. Cologix announces a $7 billion, eight-building campus of up to 800 MW on 154 acres in Johnstown [1]

  2. Local television reports the campus location in Johnstown, Licking County, and the 154-acre size [2]

  3. Trade report says work on the Johnstown campus is expected to begin later in 2025 [3]

Sources

  1. Cologix plans $7 billion, 800-MW data center complex in Ohio
    POWER Magazine · Nov 20, 2024 · news
  2. Data center company Cologix buys land in Licking County
    WSYX / ABC 6 (myfox28columbus.com) · Nov 21, 2024 · news
  3. Cologix breaks ground on $1 billion datacenter in Central Ohio
    Columbus Construction · Jun 23, 2025 · news

Cite this page

Last updated Nov 5, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Cologix Johnstown Campus. Retrieved from https://datacentercensus.com/dc/cologix-johnstown-campus-licking-county-oh
MLA“Cologix Johnstown Campus.” Data Center Census, Nov 5, 2026, https://datacentercensus.com/dc/cologix-johnstown-campus-licking-county-oh.
Linkhttps://datacentercensus.com/dc/cologix-johnstown-campus-licking-county-oh

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.