Data Center Census Near me

xAI Colossus

Memphis, Shelby County, TNDeveloper: xAI

Also known as Colossus 1, SpaceXAI Colossus

OperatingOperating since 2024 (Musk says July 2024). Anthropic agreed in May 2026 to use all of Colossus 1's compute; appeal of 15-turbine permit dismissed as moot Dec. 2025
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

xAI's first Colossus AI supercomputer, at a former Electrolux plant on Paul R. Lowry Road in South Memphis, where Musk said in July 2024 that the first 100,000-GPU cluster was online. Anthropic announced on May 6, 2026 that it would use all of the site's compute. The site draws grid power via MLGW/TVA and on-site gas turbines; the Shelby County Health Department permitted 15 turbines in July 2025 after advocates documented up to 35 operating, and the NAACP and others appealed; the Memphis and Shelby County Air Pollution Control Board dismissed the appeals as moot in December 2025. A separate, larger Colossus 2 site in Memphis's Whitehaven area is tracked as its own record.

Key facts

Size & schedule

Planned capacity300 MW [1]
Anthropic says its agreement adds more than 300 MW of capacity at Colossus 1 (company claim); FOX13 reports xAI saying the site has more than 220,000 NVIDIA GPUs

Power

UtilityMemphis Light, Gas and Water (MLGW) / TVA [5]
Power supplyMLGW/TVA grid plus on-site gas turbines (15 permitted, 247.2 MW) and Tesla Megapacks [2]

Water

Water permitTDEC Division of Water Resources operating permit issued to CTC Property LLC for the Colossus Water Recycling Plant, 3231 Paul R. Lowry Road (up to 13 million gallons per day of aquifer water preserved) [9]
TDEC described CTC Property LLC as a separate legal entity from the xAI data center
Source excerpt
“A state operating permit has been issued for the Colossus Water Recycling Plant located on 3231 Paul R. Lowry Road. The permit was issued to CTC Property LLC by the Tennessee's Department of Environment and Conservation's Division of Water Resources(TDEC).”

Money & incentives

Payments / community benefitsMemphis Community Benefit Ordinance data center property tax: 25% spent on communities within five miles of data centers; $3.28 million in FY2026 revenue proposed for the area near Colossus I [8]
Source excerpt
“Twenty-five percent will be spent directly on the communities that lie within a five-mile radius of data centers.”

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Planned capacity300 MW [1]
UtilityMemphis Light, Gas and Water (MLGW) / TVA [5]
Power supplyMLGW/TVA grid plus on-site gas turbines (15 permitted, 247.2 MW) and Tesla Megapacks [2]

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Timeline

  1. xAI announces 'world's largest supercomputer' in Memphis and begins installing gas turbines [4]

  2. Elon Musk says on X that the 100,000-H100 Colossus cluster is online in Memphis, built in 122 days (company claim as reported by Converge Digest on Sep 2, 2024; the Census found no primary record for the Sept 2024 start date seen elsewhere) [11]

  3. xAI announces Colossus 2 expansion at Tulane Road site in Whitehaven [4]

  4. Aerial imaging shows 35 turbines operating, per SELC [4]

  5. Shelby County Health Department approves permit for 15 gas turbines through Jan. 1, 2027 (DCD reports July 1 meeting) [3]

  6. SELC, on behalf of NAACP Memphis and Young, Gifted & Green, appeals permit to Memphis and Shelby County Air Pollution Control Board [3]

  7. Memphis and Shelby County Air Pollution Control Board dismisses appeals of the turbine permit as moot [7]

  8. Anthropic announces an agreement with SpaceX to use all of the compute capacity at Colossus 1, which it says adds more than 300 MW and over 220,000 NVIDIA GPUs; FOX13 Memphis reports the same agreement [1]

Issues raised

  • Advocates say xAI ran up to 35 unpermitted turbines producing over 420 MW near frontline South Memphis neighborhoods [3][4]
  • SELC says the permit ignored hundreds of residents' objections and disputes Clean Air Act compliance [2]

Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.

Sources

  1. Higher usage limits and a SpaceX compute deal
    Anthropic · May 6, 2026 · company
  2. xAI granted permits for 15 gas turbines at Memphis data center
    DatacenterDynamics · Jul 3, 2025 · news
  3. NAACP, others appeal xAI turbine permits for Memphis data center
    Tennessee Lookout · Jul 17, 2025 · news
  4. Inside Memphis' fight against xAI
    Southern Environmental Law Center · May 8, 2026 · other
  5. Memphis | SpaceXAI Memphis
    SpaceXAI · company
  6. The data center backlash comes for SpaceXAI's Colossus
    Scientific American · Sep 9, 2026 · news
  7. Shelby Co. Air Pollution Control Board denies appeal over xAI's turbine use, citing 'mootness'
    Action News 5 · Dec 16, 2025 · news
  8. Memphis data center tax revenue to fund $3.28 million in community investments near xAI facilities
    Tri-State Defender · Jul 24, 2026 · news
  9. State Issues Operating Permit for Colossus Water Plant
    Memphis Flyer · Jan 28, 2026 · news
  10. xAI announces agreement with Anthropic parent company for Claude to use data center in Memphis
    FOX13 Memphis · May 6, 2026 · news
  11. xAI activates Project Colossus in Memphis with 100K H100 GPUs
    Converge Digest · Sep 2, 2024 · news

Cite this page

Last updated Nov 5, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). xAI Colossus. Retrieved from https://datacentercensus.com/dc/xai-colossus-memphis-tn
MLA“xAI Colossus.” Data Center Census, Nov 5, 2026, https://datacentercensus.com/dc/xai-colossus-memphis-tn.
Linkhttps://datacentercensus.com/dc/xai-colossus-memphis-tn

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.