U.S. data centers in August 2026

In August 2026, the Data Center Census recorded 66 dated changes at 54 tracked projects across 30 states.

Final report for August 2026, published September 1, 2026. Last data change: . Page rebuilt .

← July 2026 September 2026 → All reports · Monthly RSS

Dated changes
66
Projects with a first milestone
0
Moratorium actions
14
Court cases filed
1

The month in one paragraph

In August 2026, the Data Center Census recorded 66 dated changes at 54 tracked projects across 30 states. Events recorded include 5 approvals, 1 denial, 5 cancellations. 14 moratorium actions were recorded, 13 of them adopted, extended or announced. 1 court case was filed. That is 14 fewer than the 80 changes recorded in July 2026.

Counts describe what was recorded in this tracker, from published filings, notices and reports. They are not a measure of everything that happened in the industry, and a month’s counts can rise later if sources dated in it are added.

Compared with July 2026

MeasureAugust 2026July 2026Change
Dated changes recorded6680−14
Projects with a change5458−4
States3027+3
Projects with first milestone02−2
Approval events59−4
Denial events12−1
Cancellation events54+1
Construction or operations starts000
Moratorium actions149+5
Court cases filed14−3
Hearings and votes held01−1
Hearings and votes upcoming000

Every dated change

DateWhat changedProject
Aug 28, 2026NC DEQ announces final air quality permits for Amazon's 588 emergency engines and Duke Energy's 57 bridge power engines NC Department of Environmental QualityAmazon Web Services Richmond County data center campus
Hamlet, Richmond County, NC · Under construction
Aug 28, 2026County says Superior Court found moratorium findings insufficient and ordered it withdrawn County of Imperial
Cancellation
Imperial Data Center
Imperial, Imperial County, CA · Paused
Aug 27, 2026Cole County judge hears arguments on motion to dismiss the Preserve Montgomery County lawsuit KBIAAWS Project Green
New Florence, Montgomery County, MO · Approved
Aug 27, 2026Palm Beach County commissioners vote 7-0 on first reading for a one-year moratorium on large-scale data centers (an anticipated monthly peak load of 50 megawatts or more), with a final vote set for Sept. 24 NewsRadio WIODProject Tango
Loxahatchee, Palm Beach County, FL · Denied
Aug 27, 2026The borough planning committee's agenda included Switch's notice of intent to seek subdivision and land development approval. Big Beaver Borough
Approval
Switch Big Beaver data center campus
Big Beaver, Beaver County, PA · Proposed
Aug 27, 2026The borough meeting on Switch's plans moved outdoors because of the large turnout, and residents raised concerns about the project. Beaver County RadioSwitch Big Beaver data center campus
Big Beaver, Beaver County, PA · Proposed
Aug 27, 2026Activists cite the East Fishkill fight in calling on the governor to sign the Responsible Data Center Development Act Food & Water WatchTreetop East Fishkill Data Center
East Fishkill, Dutchess County, NY · Rumored
Aug 27, 2026SC Public Service Commission rules the utility siting law does not apply to the facility SC Daily GazetteValara Holdings High Performance Compute Center
Spartanburg, Spartanburg County, SC · Under construction
Aug 26, 2026Amazon withdraws its application to renew a DEQ groundwater permit for the campus and says it will seek other water sources Virginia Mercury
Cancellation
Amazon Data Services King George campus (former Birchwood power plant site)
King George County, VA · Paused
Aug 26, 2026Intermediate Court of Appeals dismisses environmental groups' appeals for lack of jurisdiction, finding good cause for late appeals to the WV Supreme Court WDTVRidgeline Facility
Thomas, Tucker County, WV · Approved
Aug 26, 2026Township issues second stop-work order pending Aqua confirmation of water availability MyChesCoSentinel / Green Fig Data Center
Malvern, Chester County, PA · Paused
Aug 24, 2026Council annexes three more parcels (6.55 acres) in CRG's plan, 5-2, days before a new state annexation law took effect Jefferson County LeaderCRG Festus Data Center
Festus, Jefferson County, MO · Approved
Aug 23, 2026NM Supreme Court stays air-permit proceeding and well drilling KVIAProject Jupiter
Santa Teresa, Doña Ana County, NM · Under construction
Aug 19, 2026At a county commissioners' work session, the county solicitor reported that the county planning commission had reviewed the application and was forwarding its recommendations to the borough. Beaver County RadioSwitch Big Beaver data center campus
Big Beaver, Beaver County, PA · Proposed
Aug 18, 2026Fiscal Court votes 5-4 to deny revised data center regulations and hire a consultant; Judge-Executive calls Aug. 24 special meeting for a new first reading The Oldham Era
Denial
Project Lincoln
Oldham County, KY · Cancelled
Aug 17, 2026Madison County Board of Supervisors upholds the tax assessor's valuation of five Canton data center buildings, rejecting Amazon's appeal Mississippi Free PressAmazon Web Services Madison County Mega Site campus
Canton, Madison County, MS · Operating
Aug 17, 2026City and developers' motions to dismiss set for a Sept. 8 hearing before Will County Judge Victoria Breslan Shaw Local (The Herald-News)Joliet Technology Center
Joliet, Will County, IL · Approved
Aug 17, 2026Oracle moves to voluntarily drop its Ozaukee County Circuit Court lawsuit challenging the Wisconsin PSC's credit rating requirements for data center developers Wisconsin WatchPort Washington (Lighthouse) Data Center Campus
Port Washington, Ozaukee County, WI · Under construction
Aug 17, 2026OpenAI announces it has joined the project under a 20-year lease, with NVIDIA investing $1.5 billion OpenAIPORTS-Pike Technology Campus
Piketon, Pike County, OH · Under construction
Aug 17, 2026Judge James Kaste dismisses the petition, ruling the petitioners did not respond to a motion to dismiss in time and did not show how they would be personally harmed Cowboy State DailyPrometheus Hyperscale Evanston Campus
Evanston, Uinta County, WY · Approved
Aug 17, 2026With the company permitting disclosure, the county releases project details ahead of an Aug. 25 special meeting for the public to hear about the project Halifax County Board of Commissioners, via RRSpinQuiet Data Centers, Trestle Road
Enfield, Halifax County, NC · Proposed
Aug 13, 2026Verrus submits fifth site plan revision The Livingston PostProject Flex
New Hudson, Oakland County, MI · Approved
Aug 13, 2026County Planning Commission holds a hearing on the office complex conditional use permit Laramie CountyProject Tembo
Cheyenne, Laramie County, WY · Approved
Aug 13, 2026WVDEP determines Fundamental Data has demonstrated site control after company missed Aug 7 deadline and filed documents Aug 11 West Virginia WatchRidgeline Facility
Thomas, Tucker County, WV · Approved
Aug 12, 2026LPSC votes 3-1 to reject an administrative law judge's recommendation to make Meta job and power-demand information available through subpoenas WWNOMeta Hyperion
Holly Ridge, Richland Parish, LA · Under construction
Aug 12, 2026City issues two stop-construction orders over LNG tank and Bloom Energy fuel cell work done without permits WHYYNebius Vineland Data Center
Vineland, Cumberland County, NJ · Under construction
Aug 12, 2026The borough began posting the application and supporting studies online for public review. Big Beaver BoroughSwitch Big Beaver data center campus
Big Beaver, Beaver County, PA · Proposed
Aug 11, 2026Village voters answer No to an advisory, non-binding referendum question on whether the village should authorize or participate in public improvements connected to large data center projects Spectrum News 1 (Wisconsin)Cloverleaf, Village of Wrightstown
Wrightstown, Brown County, WI · Rumored
Aug 11, 2026Sailfish commits project to Governor Abbott's audit process and SB 6 interconnection requirements Sailfish Investors (via National Law Review)Comanche Circle
Tolar, Hood County, TX · Approved
Aug 11, 2026DC BLOX sues Metro in U.S. District Court for the Middle District of Tennessee over the moratorium Axios NashvilleDC BLOX Nashville Data Center
Nashville, Davidson County, TN · Proposed
Aug 10, 2026$6.5B, 15-year lease signed with TensorWave ABC 7 AmarilloFermi America Project Matador
Amarillo, Carson County, TX · Under construction
Aug 10, 2026Linn County drops proposal to allow large data centers co-located with nuclear plants in the EU-2 zoning district KCRGGoogle Palo data center campus
Palo, Linn County, IA · Proposed
Aug 10, 2026Council Republicans propose asking Amazon for $7 million; Amazon says it is not interested in revisiting the abatement WVPEProject Rainier (AWS New Carlisle campus)
New Carlisle, St. Joseph County, IN · Operating
Aug 10, 2026Nessel and environmental groups file initial briefs in consolidated appeal Michigan AdvanceSaline Township Stargate Data Center
Saline Township, Washtenaw County, MI · Under construction
Aug 7, 2026Utility information form filed estimating 894 MW electric load Spotsylvania CountyCrossroads Technology Campus
Spotsylvania County, VA · Proposed
Aug 7, 2026BLE Landholdings withdraws its rezoning application at the City of Pacific level, days after Pacific's mayor signs a one-year moratorium on new data-center applications; officials note the site sits in unincorporated Franklin County, where a separate county rezoning case remains open Yahoo News (KSDK)
Cancellation
Meramec Valley Technology Park
Pacific, Franklin County, MO · Approved
Aug 7, 2026PSC requires ATC to restart its application for the $1.3B+ transmission line and five substations serving the campus Wisconsin WatchPort Washington (Lighthouse) Data Center Campus
Port Washington, Ozaukee County, WI · Under construction
Aug 6, 2026PBA Holdings sues WPB Logistics and its attorneys Stet NewsProject Tango
Loxahatchee, Palm Beach County, FL · Denied
Aug 5, 2026Supervisors' vote postponed after overflow turnout created a fire hazard WHP 580Pennsylvania Digital 1 (PAX-1)
Middlesex Township, Cumberland County, PA · Approved
Aug 5, 2026Landowner PBA Holdings appeals the County Commission's July 15 denial under Florida's Land Use and Environmental Dispute Resolution Act, which leads to a hearing before a special magistrate Stet NewsProject Tango
Loxahatchee, Palm Beach County, FL · Denied
Aug 4, 2026Voters overturn the rezoning in a referendum, per unofficial results The Sun Times NewsAugusta Township Data Center (Thor Equities)
Augusta Township, Washtenaw County, MI · Denied
Aug 4, 2026Calvert County government issues a news release saying Amazon Web Services is abandoning its plans for data centers on the Calvert Cliffs Nuclear Power Plant campus Maryland Matters
Cancellation
Calvert Technology Center
Lusby, Calvert County, MD · Cancelled
Aug 4, 2026Metro Council authorizes eminent domain acquisition of the site, 27-5 NewsChannel 5DC BLOX Nashville Data Center
Nashville, Davidson County, TN · Proposed
Aug 4, 2026City of Hermantown submits the updated AUAR to the Environmental Quality Board City of HermantownGoogle Hermantown Data Center
Hermantown, St. Louis County, MN · Proposed
Aug 4, 2026Statewide reporting describes the project as facing legal challenges, with the town planning board requesting additional work Spectrum News / NY State of PoliticsLake Hawkeye
Lansing, Tompkins County, NY · Proposed
Aug 4, 2026Effingham County commissioners approve Ordinance 2026-352 permitting data centers in industrial zones Effingham Herald
Approval
Project Camellia
Rincon, Effingham County, GA · Proposed
Aug 3, 2026Salem City Council unanimously votes to advance a data center development moratorium, with a Verrus application pending KATUOakline at Mill Creek
Salem, OR · Proposed
Aug 3, 2026Michigan Attorney General files brief opposing DTE's proposed 80% minimum billing demand Planet DetroitProject Cannoli
Van Buren Township, Wayne County, MI · Approved
Aug 3, 2026Developers withdraw offer to downsize to 536,000 sq ft and switch to air chillers The Philadelphia Inquirer
Cancellation
Sentinel / Green Fig Data Center
Malvern, Chester County, PA · Paused
Aug 1, 2026Virginia DEQ discharge (VPDES) permit for cooling water discharge into Sedges Creek takes effect Tammy Purcell (Substack)Amazon Web Services Louisa County campuses
Louisa, Louisa County, VA · Under construction
Aug 2026Madison Township trustees vote unanimously to reject Trenton's annexation petition WYSO (WVXU story)Amazon Web Services data center campus, Madison and St. Clair townships
Butler County, OH · Proposed
Aug 2026St. Clair Township also rejects the annexation WYSO (WVXU story)Amazon Web Services data center campus, Madison and St. Clair townships
Butler County, OH · Proposed
Aug 2026State regulators reviewing draft air permits for backup diesel generators after public hearings Inside Climate NewsAmazon Web Services Richmond County data center campus
Hamlet, Richmond County, NC · Under construction
Aug 2026Clinton County Board of Elections votes unanimously not to certify a citizen data center regulation initiative WKRC Local 12AWS Wilmington data center
Wilmington, Clinton County, OH · Approved
Aug 2026Residents' group appeals planning commission's conditional preliminary approval of a second Greenfield Road data center LancasterOnline
Approval
CoreWeave Lancaster data center
Lancaster, Lancaster County, PA · Under construction
Aug 2026Governor's executive order removes data centers, including Amazon's, from the state fast-track permitting program The Philadelphia InquirerFalls Township Innovation Campus
Falls Township, Bucks County, PA · Under construction
Aug 2026CRC holds informational meetings in Taft Taft Midway DrillerGolden Valley Technology Hub
Taft, Kern County, CA · Proposed
Aug 2026County issues grading plans and land disturbance permit Botetourt County, VAGoogle Botetourt County Data Center Campus
Botetourt County, VA · Approved
Aug 2026Google scales back the proposal from four data center buildings to three Red Lake Nation News (republished from the Minnesota Star Tribune)Google Hermantown Data Center
Hermantown, St. Louis County, MN · Proposed
Aug 2026Building 12 operating, per Epoch AI Epoch AIMeta Prometheus
New Albany, Franklin and Licking counties, OH · Operating
Aug 2026NCCS representatives tell the Massena Planning Board that planned on-site emergency generators have been cut from 314 to 68 to address noise concerns NNY360 (Watertown Daily Times)North Country Colocation Services Massena Expansion
Massena, St. Lawrence County, NY · Proposed
Aug 2026Mercer County Fiscal Court passes a temporary pause on data center construction that does not apply in Burgin Kentucky LanternProject Bluegrass
Burgin, Mercer County, KY · Proposed
Aug 2026Two of the five Bessemer City Council members who voted for the Project Marvel rezoning lose their seats in the August municipal elections, according to the Birmingham Free Press Birmingham Free PressProject Marvel
Bessemer, Jefferson County, AL · Approved
Aug 2026Nine Lake County residents and Preservation of Community Well-being Collective LLC file suit challenging the village's approvals Lake and McHenry County Scanner
Approval
T5 @ Chicago IV
Grayslake, Lake County, IL · Approved
Aug 2026Planning Commission tables the truck stop plat application pending a third-party study and tables the data center ordinance to include public comment in its report Utah Public RadioTooele Valley data center (Burmester Road / I-80)
Tooele County, UT · Paused
Aug 2026Economic Development Authority of Columbia County approves a memorandum of understanding for a $17 billion data center investment by Kinetic Infrastructure Solutions, an Alphabet subsidiary; county says Google will pay $40 million a year for seven years WRDW
Approval
White Oak Technology Park
Appling, Columbia County, GA · Approved

Moratorium actions

JurisdictionActionDateSource
Imperial County
California · ten months and fifteen days
Extendedreported Aug 28, 2026 County of Imperial
Imperial County
California
Set aside by courtreported Aug 28, 2026 County of Imperial
City of Elkhart
Indiana
AdoptedAug 27, 2026 WNDU
Town of Cary
North Carolina · 18 months
AdoptedAug 27, 2026 WRAL
City of Indianapolis
Indiana
AdoptedAug 19, 2026 Axios Indianapolis
Spokane County
Washington · 4 months
AdoptedAug 18, 2026 Spokane County Board of County Commissioners
Metropolitan Government of Nashville and Davidson County
Tennessee
Adoptedreported Aug 11, 2026 Axios Nashville
Edgecombe County
North Carolina · two years
AdoptedAug 3, 2026 WRAL
Anderson County
South Carolina · six months
AdoptedAug 2026 FOX Carolina
Durham County
North Carolina · nine months
AdoptedAug 2026 WUNC
Gregg Township
Pennsylvania
AdoptedAug 2026 NorthcentralPA.com
Mercer County
Kentucky · one year
AdoptedAug 2026 Louisville Public Media
Montgomery County
Maryland · 18 months
ExtendedAug 2026 Maryland Matters
Texas
Texas
AnnouncedAug 2026 The Texas Tribune

Full moratorium tracker →

Court cases filed

CaseProjectStatus
DCB Nashville, LLC v. The Metropolitan Government of Nashville and Davidson County, No. 3:26-cv-01143
U.S. District Court for the Middle District of Tennessee · filed Aug 11, 2026 U.S. District Court for the Middle District of Tennessee (via WKRN)
DC BLOX Nashville Data Centerpending

How this report is made

Generated from the Census records at build time. It lists dated timeline events, hearings, lawsuit filing dates and moratorium actions that fall in the month; each links to its project record and source. A month-only date belongs to its month. Entries dated only to a year are not placed in a month. Approval, denial, cancellation and construction counts are made by reading the wording of each dated event, so one event can count in more than one group, and a vote on a related item can be miscounted; open the linked record to read the source. Nothing is estimated.

The same data is behind the statistics page, the charts and the downloads.

Cite this page

Last updated Oct 14, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). U.S. data centers in August 2026. Retrieved from https://datacentercensus.com/reports/2026-08
MLA“U.S. data centers in August 2026.” Data Center Census, Oct 14, 2026, https://datacentercensus.com/reports/2026-08.
Linkhttps://datacentercensus.com/reports/2026-08

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.