- Tracked projects
- 10
- 2 rumored, 7 proposed, 1 operating
- Planned capacity
- 3.16 GW
- 8 projects publish a figure; 2 projects publish none
- Moratorium actions
- 8
- Upcoming hearings
- 0
Projects
| Project | Status | Planned capacity | Developer |
|---|---|---|---|
| Lake Mariner Somerset, Niagara County | 750 MW | TeraWulf | |
| North Country Colocation Services Massena Expansion Massena, St. Lawrence County | Proposed | 635 MW | North Country Colocation Services (NCCS), an affiliate of New York Digital Investment Group (NYDIG) |
| Stream Data Centers STAMP Campus Alabama, Genesee County | Proposed | 500 MW | Stream Data Centers (Stream U.S. Data Centers) |
| Lake Hawkeye Lansing, Tompkins County | Proposed | 300 MW | TeraWulf Inc. |
| Ranalli Lysander Data Center Lysander, Onondaga County | Rumored | 300 MW | Ranalli Super DC, LLC |
| Riverview Innovation & Technology Campus Tonawanda, Erie County | Proposed | 300 MW | Riverview Innovation & Technology Campus (site owners Jon Williams and John Yensan, with an unnamed data center developer) |
| Remington Site Data Center Ilion, Herkimer County | Proposed | 200 MW | Turin Hoefler Avenue LLC |
| WF Industrial Yaphank Data Center Yaphank, Suffolk County | Proposed | 176.6 MW | WF Industrial (Wildflower Ltd) |
| Eco-Yotta Oneonta Data Center Oneonta, Otsego County | Proposed | none published | Eco-Yotta Inc. |
| Treetop East Fishkill Data Center East Fishkill, Dutchess County | Rumored | none published | Treetop Companies |
Pauses and local rules
| Jurisdiction | Action | When | Length |
|---|---|---|---|
| Town of Massena[1] | Rejected | Sep 16, 2026 | — |
| Town of Brookhaven[2] | Adopted | Jul 17, 2026 | 18 months, until Jan 2028 |
| New York[3] | Adopted | Jul 14, 2026 | until the state completes a Generic Environmental Impact Statement |
| Town of East Fishkill[4] | Adopted | Jun 26, 2026 | 3 years, until Jul 1, 2029 |
| St. Lawrence County[5] | Rejected | Jun 1, 2026 | — |
| Town of Lysander[5] | Adopted | May 7, 2026 | 6 months |
2 more on the moratorium tracker.
Upcoming votes and hearings
No upcoming hearing on record. Agendas change; check with the body before attending.
Latest changes
- Sep 16, 2026 Massena Town Board votes 3-2 against a proposed six-month moratorium on data center development (North Country Colocation Services Massena Expansion)[1]
- Aug 27, 2026 Activists cite the East Fishkill fight in calling on the governor to sign the Responsible Data Center Development Act (Treetop East Fishkill Data Center)[6]
- Aug 4, 2026 Statewide reporting describes the project as facing legal challenges, with the town planning board requesting additional work (Lake Hawkeye)[7]
- Aug 2026 NCCS representatives tell the Massena Planning Board that planned on-site emergency generators have been cut from 314 to 68 to address noise concerns (North Country Colocation Services Massena Expansion)[8]
- Jul 17, 2026 Brookhaven Town Board votes unanimously for an 18-month moratorium on data centers, running to early 2028 while the town writes zoning rules defining data center use (WF Industrial Yaphank Data Center)[9]
- Jul 16, 2026 Brookhaven Town Board public hearing on the moratorium runs nearly six hours, with about 300 attending and some 60 speaking against data centers (WF Industrial Yaphank Data Center)[2]
Notes
Planned capacity adds each record’s first published figure for projects not cancelled or denied; projects that publish none are never estimated. IT load is the power reaching computing equipment, so a total that includes it understates total power. Locations may be approximate where a record gives only a town or county. Counts cover tracked projects, not every data center.
Sources
- WWNY 7 News, “Massena town board votes down data center moratorium”, Sep 17, 2026. https://www.wwnytv.com/2026/09/17/massena-town-board-votes-down-data-center-moratorium/
- Fire Island News, “Brookhaven approves 18-month data center moratorium after marathon hearing”, Jul 24, 2026. https://www.fireislandnews.com/suffolk-county/brookhaven-approves-18-month-data-center-moratorium-after-marathon-hearing/
- Office of the Governor of New York, “Executive Order No. 62: Establishing a Temporary Moratorium on Data Centers in New York While the State Develops Higher Standards”, Jul 14, 2026. https://www.governor.ny.gov/executive-order/no-62-establishing-temporary-moratorium-data-centers-new-york-while-state-develops
- DatacenterDynamics, “Three-year data center moratorium passed in town of East Fishkill, New York State, blocking planned campus”, Jun 26, 2026. https://www.datacenterdynamics.com/en/news/three-year-data-center-moratorium-passed-in-town-of-east-fishkill-new-york-state-blocking-planned-campus/
- Rockefeller Institute of Government, “Updates on the Cloud: More Moratoriums on Data Centers”, Jun 10, 2026. https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/
- Food & Water Watch, “Local activists highlight East Fishkill data center fight, call on Gov. Hochul to sign Responsible Data Center Development Act”, Aug 27, 2026. https://www.foodandwaterwatch.org/2026/08/27/local-activists-community-leaders-and-concerned-residents-highlight-east-fishkill-data-center-fight-call-on-gov-hochul-to-sign-responsible-data-center-development-act/
- Spectrum News / NY State of Politics, “Proposed data centers dividing New Yorkers”, Aug 4, 2026. https://nystateofpolitics.com/state-of-politics/new-york/environment/2026/07/07/proposed-data-centers-divide-new-yorkers
- NNY360 (Watertown Daily Times), “Massena Planning Board hears update from data center representatives”, Aug 21, 2026. https://www.nny360.com/top_stories/massena-planning-board-hears-update-from-data-center-representatives/article_2f0cd6b9-924e-55d5-958e-95b5e58ff06e.html
- News 12 Long Island, “Brookhaven Town Board approves 18-month moratorium on AI data centers”, Jul 17, 2026. https://longisland.news12.com/2026/07/17/brookhaven-votes-on-18-month-ai-data-center-moratorium/6YkzeNccge6U6eW4JZQqBv
Each project record lists all of its sources and excerpts. Cite as: Data Center Census, “Data center fact sheet: New York,” October 14, 2026, https://datacentercensus.com/fact-sheets/new-york.