Tracked projects
9
1 rumored, 1 proposed, 2 under construction, 1 operating, 1 paused, 3 cancelled
Planned capacity
1.52 GW
2 projects publish a figure; 4 projects publish none; 3 cancelled or denied not counted
Moratorium actions
3
Upcoming hearings
0

Projects

ProjectStatusPlanned capacityDeveloper
Port Washington (Lighthouse) Data Center Campus
Port Washington, Ozaukee County
Under construction1.3 GWVantage Data Centers
Viridian Data Center Campus (former GM/JATCO site)
Janesville, Rock County
Cancelled800 MWViridian Partners (Viridian Acquisitions LLC)
Meta Beaver Dam Data Center
Beaver Dam, Dodge County
Under construction220 MWMeta
Cloverleaf, Greenleaf
Greenleaf, Brown County
Cancellednone publishedCloverleaf Infrastructure
Cloverleaf, Village of Wrightstown
Wrightstown, Brown County
Rumorednone publishedCloverleaf Infrastructure
Menomonie Data Center (Balloonist LLC)
Menomonie, Dunn County
Pausednone publishedBalloonist LLC
Microsoft Fairwater
Mount Pleasant, Racine County
Operatingnone publishedMicrosoft
Project Cornmaze
Beloit, Rock County
Proposednone publishedPanattoni
QTS DeForest Data Center Campus
DeForest, Dane County
Cancellednone publishedQTS Data Centers

Pauses and local rules

JurisdictionActionWhenLength
Village of Wrightstown[1]AdoptedJul 2026one year
Dane County[2]AdoptedJun 2026—, until Dec 2027
Manitowoc County[3]AdoptedApr 202618 months
  • Dane County: Sub 1 to 2026 RES-039, 18-month moratorium on hyperscale data center zoning permits (adopted, Jun 4, 2026)
  • Wausau: Wausau data center zoning ordinance (adopted, Jul 14, 2026)

Upcoming votes and hearings

No upcoming hearing on record. Agendas change; check with the body before attending.

Latest changes

Notes

Planned capacity adds each record’s first published figure for projects not cancelled or denied; projects that publish none are never estimated. IT load is the power reaching computing equipment, so a total that includes it understates total power. Locations may be approximate where a record gives only a town or county. Counts cover tracked projects, not every data center.

Sources

  1. NBC 26, “Wrightstown adopts a one-year moratorium on data center projects”, Jul 8, 2026. https://www.nbc26.com/news/local-news/wrightstown-adopts-a-one-year-moratorium-on-data-center-projects
  2. Isthmus, “Dane County Board approves data center moratorium”, Jun 5, 2026. https://isthmus.com/news/news/dane-county-board-approves-data-center-moratorium/
  3. WPR, “Manitowoc County Board approves 18-month data center moratorium”, Apr 30, 2026. https://www.wpr.org/news/manitowoc-county-board-approves-18-month-data-center-moratorium
  4. Wisconsin Watch, “ATC restarts push for grid upgrades serving Port Washington data center”, Sep 15, 2026. https://wisconsinwatch.org/2026/09/wisconsin-port-washington-data-center-atc-restarts-push-grid-upgrades-transmission-utility/
  5. Wisconsin Watch, “Oracle drops lawsuit challenging Wisconsin data center credit rules”, Aug 17, 2026. https://wisconsinwatch.org/2026/08/oracle-drops-lawsuit-challenging-wisconsin-data-center-credit-rules/
  6. Spectrum News 1 (Wisconsin), “Voters in Wrightstown don't want large data center developments”, Aug 12, 2026. https://spectrumnews1.com/wi/milwaukee/news/2026/08/12/voters-wrightstown-referendum-large-data-center-developments
  7. Wisconsin Watch, “Wisconsin regulators send ATC back to the drawing board on data center connection project”, Aug 7, 2026. https://wisconsinwatch.org/2026/08/wisconsin-psc-regulators-data-center-connection-project-atc-back-to-drawing-board-port-washington/
  8. Wisconsin Watch, “Microsoft-We Energies contract retains provision PSC struck down”, Aug 6, 2026. https://wisconsinwatch.org/2026/08/wisconsin-we-energies-microsoft-data-center-contract-terms-conflict-psc-regulators-electricity/
  9. WPR, “Microsoft sued over noise complaints at new Mount Pleasant data center facility”, Jul 2, 2026. https://www.wpr.org/news/microsoft-sued-noise-complaints-at-new-mount-pleasant-data-center

Each project record lists all of its sources and excerpts. Cite as: Data Center Census, “Data center fact sheet: Wisconsin,” October 14, 2026, https://datacentercensus.com/fact-sheets/wisconsin.