Indianapolis, Marion County, IN[3][1]Developer: DC BLOX[1][3]

Also known as Thunderbird Commerce Center

Approved[2]The Metropolitan Development Commission approved the project 6-1 in July 2026; on Nov. 9, 2026 a City-County Council committee voted 11-2 to recommend rejecting the proposed tax abatements (not binding), and The Weekly View reports the full council vote is set for Dec. 7
  1. Rumored
  2. Proposed
  3. Approved
  4. Under construction
  5. Operating

DC Blox, an Atlanta-based developer, plans a data center campus on the former Ford Visteon factory site at 305 Fintail Drive in Warren Township on the east side of Indianapolis. After resident pushback the company cut one of three planned buildings, 28 MW of critical IT load and 25 backup generators; the Metropolitan Development Commission approved the plan in July 2026. On Nov. 9, 2026 the City-County Council's Metropolitan and Economic Development Committee voted 11-2 to recommend that the full council turn down two proposed tax abatements worth about $113 million. The recommendation does not bind the council, which WFYI expects to vote in December; The Weekly View gives the date as Dec. 7.

Key facts

Size & schedule

Stated investment$2 billion [3]
as reported by WFYI in May 2026; WFYI's Nov. 9, 2026 report calls it a $1.8 billion project [5], and DC Blox's project page gives an estimate of $1.8 to 2 billion
Source excerpt
“wants to build a $2 billion data center campus on Indianapolis' east side”
Construction jobs600 [1]
at the peak of construction, per DC Blox
Source excerpt
“The DC BLOX data center will employ 600 workers at the peak of construction.”

Water

Coolingclosed-loop, per DC Blox [1]
Source excerpt
“closed-loop cooling systems and ongoing operations require no more water than a typical commercial building”

Money & incentives

Tax incentivesTwo proposed 10-year abatements worth about $113 million in all: 50% on real property and 85% on personal property. A council committee recommended rejecting them on Nov. 9, 2026 (11-2, not binding); the full council is expected to vote in December [5]
Dec. 7 vote date per The Weekly View [4]
Source excerpt
“is expected to vote in December”

Figures are as stated by the cited source. Where sources disagree, each figure is shown.

Water and power

Water

Not disclosed. No source reviewed gives a water figure for this site. The Census does not estimate one.

Power

Not disclosed. No capacity or power-supply figure is on the record.

Disclosed figures only, each as the cited source states it. Many are projections or permit limits, not metered use. How data center water and power use is measured, and every disclosed figure →

Upcoming hearings

  • Dec 7, 2026 — Indianapolis City-County Council: Full council vote on the two proposed tax abatements (date per The Weekly View; WFYI says December); no public comment at this meeting [4]

Timeline

  1. DC Blox submits a plan of operation for a three-building data center campus on the former Ford Visteon site [2]

  2. Warren Township residents question the proposal at a community meeting [3]

  3. Metropolitan Development Commission approves the project 6-1 after DC Blox drops one building, 28 MW of critical IT load and 25 backup generators [2]

  4. City-County Council's Metropolitan and Economic Development Committee votes 11-2 to recommend that the full council reject the two abatements, about $113 million; the recommendation is not binding [5]

Issues raised

  • Residents raised concerns about the campus at a Warren Township community meeting in May 2026 [3]

Issues are concerns and claims raised by the parties, officials or residents named in the cited sources. They are reported as attributed, not as findings by the Census.

Sources

  1. DC BLOX Thunderbird Data Center in Indianapolis
    DC Blox · Nov 17, 2026 · company
  2. Georgia developer finalizes plans to downsize $2 billion data center on Indy's east side; cites community feedback
    FOX59 · Jul 15, 2026 · news
  3. Residents push back on a $2 billion data center proposal on Indy's east side
    WFYI · May 22, 2026 · news
  4. DC Blox data center tax abatements up for discussion
    The Weekly View · Nov 5, 2026 · news
  5. Committee recommends no tax break for controversial Indianapolis data center
    WFYI · Nov 9, 2026 · news

Cite this page

Last updated Nov 17, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). DC Blox Thunderbird data center campus. Retrieved from https://datacentercensus.com/dc/dc-blox-thunderbird-indianapolis-in
MLA“DC Blox Thunderbird data center campus.” Data Center Census, Nov 17, 2026, https://datacentercensus.com/dc/dc-blox-thunderbird-indianapolis-in.
Linkhttps://datacentercensus.com/dc/dc-blox-thunderbird-indianapolis-in

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.