Crusoe is linked to 2 tracked projects in Texas, totaling 2.23 GW of planned capacity. Role: developer.
- Under construction 1
- Operating 1
Ranked #18 of 59 developers by the published capacity of its tracked projects that are proposed, approved, under construction or operating, as developer or operator (2.23 GW). See the ranking →
| Project | Status | Capacity | Developer | Last update |
|---|---|---|---|---|
| Goodnight Campus Claude, Armstrong County, TX |
Under construction | 1.03 GW | Crusoe | Sep 2026 |
| Stargate Abilene Abilene, Taylor County, TX |
1.2 GW | Crusoe, Oracle | Nov 1, 2026 |
Latest Crusoe data center news
The newest dated changes at Crusoe’s tracked projects, each from the filing, notice or report linked beside it.
-
Stargate Abilene TX
Epoch AI estimates all 8 buildings (7-8 estimated) operational, for 824 MW of IT power (Epoch AI estimate) Epoch AI -
Stargate Abilene TX
On Oracle's Q1 FY2027 earnings call, its CEO said 6 of the 8 Abilene buildings, 618 MW or 75% of total capacity, had been delivered to the customer, and that Oracle delivered about 131,000 GPUs there in the quarter The Motley Fool -
Stargate Abilene TX
Chamber panel addresses resident concerns over housing, power, water and noise KACU -
Goodnight Campus TX
At a Google and Crusoe community open house in Claude, Crusoe says the campus will include six buildings; KFDA reports Google is expected to receive the first buildings in early 2027, with construction wrapping up by the end of 2027 KFDA NewsChannel 10 -
Goodnight Campus TX
Filings with the Texas Department of Licensing and Regulation cover Buildings 3 and 4, each with an estimated construction cost of $500 million DatacenterDynamics -
Goodnight Campus TX
PUCT approves net metering application in Docket No. 59220 for the co-located Armstrong County data center load, with ERCOT curtailment obligations White & Case LLP -
Stargate Abilene TX
Buildings 3-4 become operational, bringing IT power to 412 MW at 4 buildings (Epoch AI estimate from satellite analysis) Epoch AI -
Stargate Abilene TX
Lancium and Crusoe brief Abilene leaders; construction expected to run through Q1 2027 KTXS