Data Center Census Near me

Utility

Consumers Energy and data centers

1 tracked data center project in Michigan, large-load tariff approved.

Part of CMS Energy.

Tracked data center projects

ProjectStatusPlanned capacity
Microsoft Gaines Township data center
Michigan
Proposed—

Capacity is the planned figure each project publishes (utility load or IT load as the record notes). Total for proposed, approved, under-construction and operating projects: no single figure, plus 1 with no single capacity figure. A project served by two utilities counts in full for each.

Large-load tariff and rules

Status
Large-load tariff or rules approved (2025-11-06)
Tariff
Consumers Energy large-load (data center) tariff provisions
Docket
U-21859, Michigan Public Service Commission
What it says
The MPSC approved with modifications Consumers' new data center and large-load tariff provisions, applying to customers of at least 100 MW, aimed at protecting customers from stranded-asset risk. (Earthjustice)
Source excerpt
“The ruling establishes new tariff provisions for service of data centers and other large-load customers”

Official forecasts of data center load

  • Consumers reported about 9 GW of large-load interconnection requests in its pipeline, with up to 2 GW in final negotiation stages. (Utility Dive, 2026-02-06)
    Source excerpt
    “about 9 GW of large-load interconnection requests in its pipeline”

What sources say about customer bills

Sources saying customers are protected, or bills are lower than they would be

  • Consumers Energy: Consumers says large new customers will pay their full cost of service plus part of fixed system costs. (Consumers Energy, 2025-12-11)
    Source excerpt
    “will pay their full cost of service and a portion of the system's fixed costs”

Sources finding both, or saying it depends

  • Earthjustice: Earthjustice notes the order requires analysis in the next rate case of whether current rates could cause other customers to subsidize data centers. (Earthjustice, 2025-11-06)
    Source excerpt
    “requires Consumers to do an analysis in its next rate case on how current rates could cause other customers to subsidize”

These are statements by regulators, utilities, advocates and researchers about this utility or its region. They are not a prediction of any customer’s bill, which depends on rates, usage and regulator decisions.

More

States: Michigan. Look up another utility · All utilities · Power tracker · Energy news · Tax breaks tracker

Cite this page

Last updated Oct 13, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Consumers Energy and data centers. Retrieved from https://datacentercensus.com/utilities/consumers-energy
MLA“Consumers Energy and data centers.” Data Center Census, Oct 13, 2026, https://datacentercensus.com/utilities/consumers-energy.
Linkhttps://datacentercensus.com/utilities/consumers-energy

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.