Data Center Census Near me

North Dakota

Data centers in North Dakota

The Census tracks 1 major data center project in North Dakota, with 400 MW of planned capacity: 1 operating.

How many data centers are in North Dakota?

The Census tracks 1 major data center project in North Dakota as of Nov 6, 2026: 1 operating. That covers major sourced projects, not every smaller facility. The largest by planned capacity is Polaris Forge 1 (400 MW). Latest change, at Polaris Forge 1: Applied Digital says proceeds of a senior secured notes offering will fund construction of a fourth building (150 MW) at Polaris Forge 1 (Jul 27, 2026).

Projects tracked
1
Planned capacity, active projects
400MW
Under construction
0
Operating
1
RumoredProposedApprovedUnder constructionOperatingPausedCancelledDenied© OpenFreeMap © OpenStreetMap

North Dakota data center projects

ProjectStatusCapacityDeveloperLast update
Polaris Forge 1
Ellendale, Dickey County
Operating 400 MW Applied Digital Jul 27, 2026

Recent changes in North Dakota

  1. Polaris Forge 1 ND
    Applied Digital says proceeds of a senior secured notes offering will fund construction of a fourth building (150 MW) at Polaris Forge 1 Applied Digital
  2. Polaris Forge 1 ND
    Applied Digital says it delivered Phase 1 of Building 2 (75 MW), bringing live capacity at the campus to 175 MW Applied Digital
  3. Polaris Forge 1 ND
    Dickey County closes several roads damaged by construction traffic KFGO
  4. Polaris Forge 1 ND
    Phase II ready for service; Building 1 fully energized at 100 MW Applied Digital
  5. Polaris Forge 1 ND
    Phase I of Building 1 reaches ready for service Applied Digital
  6. Polaris Forge 1 ND
    CoreWeave signs additional 150 MW lease, bringing Polaris Forge 1 to 400 MW Applied Digital
  7. Polaris Forge 1 ND
    Applied Digital signs 250 MW of 15-year leases with CoreWeave (~$7 billion) DatacenterDynamics
  8. Polaris Forge 1 ND
    Applied Digital petitions to annex the data center into the city of Ellendale North Dakota Monitor
  9. Polaris Forge 1 ND
    North Dakota Public Service Commission unanimously approves Montana-Dakota Utilities' electric service agreement to serve Applied Digital's data center near Ellendale MDU Resources (PR Newswire)
  10. Polaris Forge 1 ND
    Construction begins at the Ellendale campus DatacenterDynamics

About this count

This page counts the major projects the Census has researched and sourced: 1 as of Nov 6, 2026. It does not yet include every smaller colocation or enterprise facility, so the total number of buildings in North Dakota is higher. We add projects as they are announced or found in public filings.

Counties with tracked projects

Dickey County

Community concerns

2 concerns documented in public sources about 1 project here →

AI data centers in North Dakota

1 tracked project here is counted as AI data centers: Polaris Forge 1 (operating). All AI data centers →

Utilities serving tracked projects in North Dakota

Montana-Dakota Utilities. Will data centers raise electric bills here? →

Follow North Dakota

RSS feed of North Dakota changes · Printable fact sheet · Embed this tracker · Projects near a ZIP code · Data center jobs near you

North Dakota data centers: common questions

How many data centers are in North Dakota?

The Census tracks 1 major data center project in North Dakota as of Nov 6, 2026: 1 operating. This counts large projects the Census has researched and sourced, not every smaller colocation or enterprise facility, so the total number of data center buildings in North Dakota is higher.

What is the largest data center project in North Dakota?

By published planned capacity, the largest tracked project in North Dakota is Polaris Forge 1 in Ellendale, Dickey County, ND, at 400 MW. Its status is operating.

Are data centers being built in North Dakota right now?

No tracked project in North Dakota is currently recorded as under construction.

How many AI data centers are in North Dakota?

The Census counts 1 tracked project in North Dakota as AI data centers, because their own sources describe them as built for AI: Polaris Forge 1 (operating). That is a floor; other campuses may run AI workloads without their sources saying so.

Answers are generated from the sourced project records above and update when a record changes. Open any project for its sources.

North Dakota data center report card

North Dakota data center report card: 1 tracked project, 400 MW of published capacity, 0 under construction.
  • Tracked projects1
  • Published capacity400 MW
  • Under construction0
  • Moratorium actions in the tracker0
  • Largest: Polaris Forge 1400 MW

A square image of these figures, sized for Instagram, LinkedIn and slides. It is redrawn whenever a record changes, so the link always shows today’s numbers.

Download the image

Free to use with credit to Data Center Census (CC BY 4.0).

Cite this page

Last updated Nov 6, 2026. Figures may change as records are updated — include the date you retrieved them.

APAData Center Census. (2026). Data centers in North Dakota. Retrieved from https://datacentercensus.com/us/north-dakota
MLA“Data centers in North Dakota.” Data Center Census, Nov 6, 2026, https://datacentercensus.com/us/north-dakota.
Linkhttps://datacentercensus.com/us/north-dakota

Republishing a figure or table? Attribute it to Data Center Census with a link to this page. The underlying data is downloadable as JSON and CSV; the press kit has standing figures and contact details.