Data center fact sheet · county

Taylor County, Texas

As of . Latest dated change shown: Sep 2, 2026. Source: Data Center Census (datacentercensus.com), CC BY 4.0.

Full county page

Tracked projects
1
1 operating
Planned capacity
1.2 GW
1 project publishes a figure; 0 projects publish none
Moratorium actions
0
Upcoming hearings
0

Projects

ProjectStatusPlanned capacityDeveloper
Stargate Abilene
Abilene
Operating1.2 GWCrusoe

Pauses and local rules

No moratorium action on record.

Upcoming votes and hearings

No upcoming hearing on record. Agendas change; check with the body before attending.

Latest changes

  • Sep 2, 2026 Chamber panel addresses resident concerns over housing, power, water and noise (Stargate Abilene)[1]
  • May 23, 2026 Buildings 3-4 become operational, bringing IT power to about 421 MW, per Epoch AI satellite analysis (Stargate Abilene)[2]
  • Mar 5, 2026 Lancium and Crusoe brief Abilene leaders; construction expected to run through Q1 2027 (Stargate Abilene)[3]
  • Nov 2025 Crusoe tops out final (eighth) building (Stargate Abilene)[4]
  • Sep 30, 2025 Crusoe announces first phase live on Oracle Cloud Infrastructure (Stargate Abilene)[5]
  • Feb 11, 2025 Taylor County commissioners vote on preliminary tax agreement for Lancium site amid resident concerns (Stargate Abilene)[6]

Notes

Planned capacity adds each record’s first published figure for projects not cancelled or denied; projects that publish none are never estimated. IT load is the power reaching computing equipment, so a total that includes it understates total power. Locations may be approximate where a record gives only a town or county. Counts cover tracked projects, not every data center.

Sources

  1. KACU, “Panel tackles persistent concerns around Abilene's AI boom”, Sep 2, 2026. https://www.kacu.org/local-news/2026-09-02/panel-tackles-persistent-concerns-around-abilenes-ai-boom
  2. Epoch AI, “OpenAI Stargate Abilene | AI Data Centers”, Jul 28, 2026. https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene
  3. KTXS, “Construction on Stargate One data center campus set to run through early 2027”, Mar 5, 2026. https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment
  4. DatacenterDynamics, “Crusoe tops out final building at OpenAI Stargate data center campus in Abilene, Texas”, Nov 17, 2025. https://www.datacenterdynamics.com/en/news/crusoe-tops-out-final-building-at-openai-stargate-data-center-campus-in-abilene-texas/
  5. Crusoe, “Crusoe Announces Flagship Abilene Data Center is Live”, Sep 30, 2025. https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live
  6. KTXS, “Taylor County residents raise concerns on Lancium tax breaks at commissioners meeting”, Feb 11, 2025. https://ktxs.com/news/local/taylor-county-residents-raise-concerns-on-lancium-tax-breaks-at-commissioners-meeting

Each project record lists all of its sources and excerpts. Cite as: Data Center Census, “Data center fact sheet: Taylor County, Texas,” October 14, 2026, https://datacentercensus.com/fact-sheets/texas/taylor-county.