Data Center Census Near me

Data center fact sheet

Michigan

As of . Latest dated change shown: Aug 13, 2026. Source: Data Center Census (datacentercensus.com), CC BY 4.0.

Full state page

Tracked projects
9
1 rumored, 2 proposed, 2 approved, 1 under construction, 1 paused, 1 cancelled, 1 denied
Planned capacity
2.38 GW
2 projects publish a figure; 5 projects publish none; 2 cancelled or denied not counted
Moratorium actions
8
Upcoming hearings
0

Projects

ProjectStatusPlanned capacityDeveloper
Saline Township Stargate Data Center
Saline Township, Washtenaw County
Under construction1.38 GWRelated Digital
Project Cannoli
Van Buren Township, Wayne County
Approved1 GWPanattoni Development
Deep Green Lansing data center
Lansing, Ingham County
Cancelled24 MWDeep Green
Augusta Township Data Center (Thor Equities)
Augusta Township, Washtenaw County
Deniednone publishedThor Equities
Howell Township Data Center
Howell, Livingston County
Pausednone publishedRandee LLC / Stantec Consulting Michigan Inc.
Microsoft Gaines Township data center
Caledonia, Kent County
Proposednone publishedMicrosoft
Project Cherry Blossom
Frenchtown Township, Monroe County
Proposednone publishedCloverleaf Infrastructure
Project Flex
New Hudson, Oakland County
Approvednone publishedVerrus
Project Peninsula
Cedar Springs, Kent County
Rumorednone published—

Pauses and local rules

JurisdictionActionWhenLength
Elmwood Township[1]AdoptedJun 17, 202612 months
City of Wixom[2]AdoptedMar 24, 2026six months
Lyon Township[3]AdoptedMar 2, 2026—, until Sep 8, 2026
Big Rapids Charter Township[4]AdoptedFeb 23, 2026one year
Lenox Township[5]AdoptedFeb 2, 2026four months
Solon Township[6]AdoptedFeb 2026six months

2 more on the moratorium tracker.

  • Michigan: Public Act 207 of 2024 (HB 4906): data center sales and use tax exemption (adopted, Jan 17, 2025)
  • Big Rapids Charter Township: Big Rapids Charter Township Data Center Moratorium Ordinance (adopted, Feb 23, 2026)
  • Lenox Township: Lenox Township data center moratorium (adopted, Feb 2, 2026)
  • Wixom: Resolution Imposing a Temporary Moratorium on data centers (adopted, Mar 24, 2026)

Upcoming votes and hearings

No upcoming hearing on record. Agendas change; check with the body before attending.

Latest changes

Notes

Planned capacity adds each record’s first published figure for projects not cancelled or denied; projects that publish none are never estimated. IT load is the power reaching computing equipment, so a total that includes it understates total power. Locations may be approximate where a record gives only a town or county. Counts cover tracked projects, not every data center.

Sources

  1. Tuscola Today, “Elmwood Twp. Adopts Data Center Moratorium, Approves Road Improvements”, Jul 22, 2026. https://www.tuscolatoday.com/news/elmwood-twp-adopts-data-center-moratorium-approves-road-improvements/article_2754d6b2-097a-4cf3-ae67-18f7a0208a3d.html
  2. City of Wixom, “Data Center Moratorium & Ordinance”. https://www.wixomgov.org/departments/construction-development-services-building/data-center-moratorium-ordinance
  3. Charter Township of Lyon, “Synopsis of Regular Meeting, Charter Township of Lyon Board of Trustees, Monday, March 2, 2026”. https://cms2.revize.com/revize/lyontownship/3-2-2026%20Synopsis.pdf?t=202603101604210
  4. Big Rapids Charter Township, “Data Center Moratorium”. https://bigrapidstownshipmi.gov/wp-content/uploads/2026/02/Data-Center-Moratorium.pdf
  5. Charter Township of Lenox, “Township Statement Regarding Adoption of Data Center Moratorium”, Feb 3, 2026. https://www.lenox-mi.gov/m/newsflash/home/detail/240
  6. FOX 17, “Solon Township approves 6-month moratorium on data center proposals”, Feb 10, 2026. https://www.fox17online.com/news/local-news/rockford-cedar-springs-sparta/solon-township-approves-6-month-moratorium-on-data-center-proposals
  7. The Livingston Post, “Project Flex one year later: Part II”, Sep 8, 2026. https://thelivingstonpost.com/project-flex-one-year-later-part-ii/
  8. Michigan Advance, “Nessel and environmental groups file initial arguments in appeal of DTE Saline data center contract”, Aug 10, 2026. https://michiganadvance.com/2026/08/10/nessel-and-environmental-groups-file-initial-arguments-in-appeal-of-dte-saline-data-center-contract/
  9. The Sun Times News, “Weekly Data Center Watch: Augusta Voters Overturn Data Center Rezoning”, Aug 6, 2026. https://thesuntimesnews.com/weekly-data-center-watch-augusta-voters-overturn-data-center-rezoning/
  10. Planet Detroit, “DTE wants approval for Google data center power contracts: What's at stake with 1-gigawatt Van Buren Township project?”, Sep 9, 2026. https://planetdetroit.org/2026/09/google-dte-van-buren-data-center-contracts/
  11. Oracle, “Oracle, Related Digital, Blackstone, OpenAI, Walbridge and Governor Whitmer Celebrate Construction of Stargate Campus in Saline Township”, Jun 1, 2026. https://www.oracle.com/news/announcement/related-digital-oracle-openai-walbridge-and-governor-whitmer-celebrate-construction-of-stargate-campus-in-saline-township-2026-06-01/
  12. DatacenterDynamics, “Mystery tech firm looks to build ~800-acre data center campus outside Grand Rapids, Michigan”, Jun 26, 2026. https://www.datacenterdynamics.com/en/news/mystery-tech-firm-looks-to-build-800-acre-data-center-campus-outside-grand-rapids-michigan/

Each project record lists all of its sources and excerpts. Cite as: Data Center Census, “Data center fact sheet: Michigan,” October 14, 2026, https://datacentercensus.com/fact-sheets/michigan.