Data center fact sheet · county
Utah County, Utah
As of . Latest dated change shown: Aug 2014. Source: Data Center Census (datacentercensus.com), CC BY 4.0.
- Tracked projects
- 1
- 1 operating
- Planned capacity
- 65 MW
- 1 project publishes a figure; 0 projects publish none
- Moratorium actions
- 0
- Upcoming hearings
- 0
Projects
| Project | Status | Planned capacity | Developer |
|---|---|---|---|
| Utah Data Center Bluffdale | 65 MW | National Security Agency (construction agent: U.S. Army Corps of Engineers) |
Pauses and local rules
No moratorium action on record.
Upcoming votes and hearings
No upcoming hearing on record. Agendas change; check with the body before attending.
Latest changes
- Aug 2014 Bluffdale records show the facility's monthly water usage peaked at 6.6 million gallons (Utah Data Center)[1]
- Oct 8, 2013 NSA says failures that occurred during testing have been mitigated, after reports of electrical surges (Utah Data Center)[2]
- Mar 2011 Bluffdale City Council unanimously adopts annexation plan encompassing the data center and Camp Williams (Utah Data Center)[3]
- Jan 6, 2011 Groundbreaking held at Camp Williams (Utah Data Center)[4]
- Mar 2010 Utah Military Installation Development Authority (MIDA) creates the Utah Data Center Project Area (Utah Data Center)[5]
Notes
Planned capacity adds each record’s first published figure for projects not cancelled or denied; projects that publish none are never estimated. IT load is the power reaching computing equipment, so a total that includes it understates total power. Locations may be approximate where a record gives only a town or county. Counts cover tracked projects, not every data center.
Sources
- The Salt Lake Tribune, “NSA Utah Data Center using more water”, Feb 2, 2015. https://archive.sltrib.com/article.php?id=2118801&itype=CMSID
- NPR, “NSA Says It Has 'Mitigated' Meltdowns At Utah Data Farm”, Oct 8, 2013. https://www.npr.org/sections/thetwo-way/2013/10/08/230520905/nsa-says-it-has-mitigated-meltdowns-at-utah-data-farm
- The Salt Lake Tribune, “Bluffdale OKs plans to annex NSA data center”, Mar 10, 2011. https://archive.sltrib.com/article.php?id=51391693&itype=CMSID
- Engineering News-Record, “Construction of National Cyber Security Center Gets Under Way in Utah”, Jan 11, 2011. https://www.enr.com/articles/22326-construction-of-national-cyber-security-center-gets-under-way-in-utah
- Military Installation Development Authority (MIDA), “Utah Data Center Project Area”. https://www.midaut.org/utah-data-center-project-area
Each project record lists all of its sources and excerpts. Cite as: Data Center Census, “Data center fact sheet: Utah County, Utah,” October 14, 2026, https://datacentercensus.com/fact-sheets/utah/utah-county.