Data center tracker
Nevada
- Projects tracked
- 2
- Planned capacity
- 362 MW
- Under construction
- 0
- Proposed 2
- Fleet Data Centers TRIC campuses (South Valley and Peru Ridge)362 MWProposed
- Switch Core 2.0 Phase 1 CampusCapacity not publishedProposed
Counts and capacity are computed from the tracked project records; capacity sums only projects that publish a figure.